REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India) REQUEST FOR QUOTATION - GAIL (India)

gailonline.com
from gailonline.com More from this publisher
11.07.2015 Views

General Conditions of Contractkind in the course of their work or during their employment, whichare connected directly or indirectly with the CONTRACT.36.4 If and when required by the EMPLOYER and CONTRACTOR'spersonnel entering upon the EMPLOYER's premises shall beproperly identified by badges of a type acceptable to theEMPLOYER which must be worn at all times on EMPLOYER'spremises. CONTRACTOR may be required to obtain daily entrypasses for his staff/employees from EMPLOYER to work withinoperating areas. These being safety requirements, norelaxations on this account shall be given to CONTRACTOR.37 Sub-letting of works: 37.1 No part of the CONTRACT nor any share or interest therein shallin any manner or degree be transferred, assigned or sublet bythe CONTRACTOR directly or indirectly to any person, firm orcorporation whatsoever without the consent in writing, of theENGINEER/EMPLOYER except as provided for in thesucceeding sub-clause.i) SUB-CONTRACTS FOR TEMPORARY WORKS ETC.:The EMPLOYER may give written consent to Sub- contractfor the execution of any part of the WORK at the site, beingentered in to by CONTRACTOR provided each individualSub- contract is submitted to the ENGINEER-IN-CHARGEbefore being entered into and is approved by him.ii)LIST OF SUB-CONTRACTORS TO BE SUPPLIED:At the commencement of every month the CONTRACTORshall furnish to the ENGINEER-IN- CHARGE list of allSUB-CONTRACTORS or other persons or firms engaged bythe CONTRACTOR and working at the SITE during theprevious month with particulars of the general nature of theSubcontract or works done by them.iii) CONTRACTOR'S LIABILITY NOT LIMITED BYSUB- CONTRACTORS:Notwithstanding any sub-letting with such approval asaforesaid and notwithstanding that the ENGINEER-IN-CHARGE shall have received copies of any Subcontracts,the contractor shall be and shall remain solelyresponsible for the quality, proper and expeditious executionof the Contract in all respects as if such sub-letting orSubcontracting had not taken place, and as if such workhad been done directly by the CONTRACTOR. TheCONTRACTOR shall bear all responsibility for any act oromission on the part of sub-contractors in regard to work tobe performed under the CONTRACT.iv) EMPLOYER MAY TERMINATE SUB-CONTRACTS:If any SUB-CONTRACTOR engaged upon the works at thesite executes any works which in the opinion of theENGINEER-IN-CHARGE is not in accordance with theCONTRACT documents, the EMPLOYER may by writtennotice to the CONTRACTOR request him to terminate suchsubcontract and the CONTRACTOR upon the receipt of25

General Conditions of Contractsuch notice shall terminate such Subcontract and dismissthe SUB-CONTRACTOR(S) and the later shall forthwithleave the works, failing which the EMPLOYER shall have theright to remove such SUB- CONTRACTOR(S) from the site.v) NO REMEDY FOR ACTION TAKEN UNDER THISCLAUSE:No action taken by the EMPLOYER under the clause shallrelieve the CONTRACTOR of any of his liabilities under theCONTRACT or give rise to any right or compensation,extension of time or otherwise failing which the EMPLOYERshall have the right to remove such SUB-CONTRACTOR(S)from the site.38 Power of entry: 38.1 If the CONTRACTOR shall not commence the WORK in themanner previously described in the CONTRACT documents or ifhe shall at any time in the opinion of the ENGINEER-IN-CHARGE.i) fail to carry out the WORK in conformity with theCONTRACT documents, orii)fail to carry out the WORK in accordance with the TimeSchedule, oriii) substantially suspend work or the WORK for a period offourteen days without authority from theENGINEER-IN-CHARGE, oriv) fail to carry out and execute the WORK to the satisfaction ofthe ENGINEER-IN-CHARGE, orv) fail to supply sufficient or suitable construction plant,temporary works, labour, materials or things, orvi) Commit, suffer, or permit any other breach of any of theprovisions of the CONTRACT on his part to be performed orobserved or persist in any of the above mentioned breachesof the CONTRACT for fourteen days, after notice in writingshall have been given to the CONTRACTOR by theENGINEER-IN-CHARGE requiring such breach to beremedied, orvii) if the CONTRACTOR shall abandon the WORK , orviii) If the CONTRACTOR during the continuance of theCONTRACT shall become bankrupt, make any arrangementor composition with his creditors, or permit any execution tobe levied or go into liquidation whether compulsory orvoluntary not being merely a voluntary liquidation for thepurpose of amalgamation or reconstructionthen in any such case, the EMPLOYER shall have the power toenter upon the WORK and take possession thereof and of thematerials, temporary WORK, construction plant, and stockthereon, and to revoke the CONTRACTOR's licence to use thesame, and to complete the WORK by his agents, otherCONTRACTORS or workmen or to relate the same upon anyterms and to such other person, firm or corporation as the26

General Conditions of Contractkind in the course of their work or during their employment, whichare connected directly or indirectly with the CONTRACT.36.4 If and when required by the EMPLOYER and CONTRACTOR'spersonnel entering upon the EMPLOYER's premises shall beproperly identified by badges of a type acceptable to theEMPLOYER which must be worn at all times on EMPLOYER'spremises. CONTRACTOR may be required to obtain daily entrypasses for his staff/employees from EMPLOYER to work withinoperating areas. These being safety requirements, norelaxations on this account shall be given to CONTRACTOR.37 Sub-letting of works: 37.1 No part of the CONTRACT nor any share or interest therein shallin any manner or degree be transferred, assigned or sublet bythe CONTRACTOR directly or indirectly to any person, firm orcorporation whatsoever without the consent in writing, of theENGINEER/EMPLOYER except as provided for in thesucceeding sub-clause.i) SUB-CONTRACTS <strong>FOR</strong> TEMPORARY WORKS ETC.:The EMPLOYER may give written consent to Sub- contractfor the execution of any part of the WORK at the site, beingentered in to by CONTRACTOR provided each individualSub- contract is submitted to the ENGINEER-IN-CHARGEbefore being entered into and is approved by him.ii)LIST OF SUB-CONTRACTORS TO BE SUPPLIED:At the commencement of every month the CONTRACTORshall furnish to the ENGINEER-IN- CHARGE list of allSUB-CONTRACTORS or other persons or firms engaged bythe CONTRACTOR and working at the SITE during theprevious month with particulars of the general nature of theSubcontract or works done by them.iii) CONTRACTOR'S LIABILITY NOT LIMITED BYSUB- CONTRACTORS:Notwithstanding any sub-letting with such approval asaforesaid and notwithstanding that the ENGINEER-IN-CHARGE shall have received copies of any Subcontracts,the contractor shall be and shall remain solelyresponsible for the quality, proper and expeditious executionof the Contract in all respects as if such sub-letting orSubcontracting had not taken place, and as if such workhad been done directly by the CONTRACTOR. TheCONTRACTOR shall bear all responsibility for any act oromission on the part of sub-contractors in regard to work tobe performed under the CONTRACT.iv) EMPLOYER MAY TERMINATE SUB-CONTRACTS:If any SUB-CONTRACTOR engaged upon the works at thesite executes any works which in the opinion of theENGINEER-IN-CHARGE is not in accordance with theCONTRACT documents, the EMPLOYER may by writtennotice to the CONTRACTOR request him to terminate suchsubcontract and the CONTRACTOR upon the receipt of25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!