General Conditions of Contractkind in the course of their work or during their employment, whichare connected directly or indirectly with the CONTRACT.36.4 If and when required by the EMPLOYER and CONTRACTOR'spersonnel entering upon the EMPLOYER's premises shall beproperly identified by badges of a type acceptable to theEMPLOYER which must be worn at all times on EMPLOYER'spremises. CONTRACTOR may be required to obtain daily entrypasses for his staff/employees from EMPLOYER to work withinoperating areas. These being safety requirements, norelaxations on this account shall be given to CONTRACTOR.37 Sub-letting of works: 37.1 No part of the CONTRACT nor any share or interest therein shallin any manner or degree be transferred, assigned or sublet bythe CONTRACTOR directly or indirectly to any person, firm orcorporation whatsoever without the consent in writing, of theENGINEER/EMPLOYER except as provided for in thesucceeding sub-clause.i) SUB-CONTRACTS FOR TEMPORARY WORKS ETC.:The EMPLOYER may give written consent to Sub- contractfor the execution of any part of the WORK at the site, beingentered in to by CONTRACTOR provided each individualSub- contract is submitted to the ENGINEER-IN-CHARGEbefore being entered into and is approved by him.ii)LIST OF SUB-CONTRACTORS TO BE SUPPLIED:At the commencement of every month the CONTRACTORshall furnish to the ENGINEER-IN- CHARGE list of allSUB-CONTRACTORS or other persons or firms engaged bythe CONTRACTOR and working at the SITE during theprevious month with particulars of the general nature of theSubcontract or works done by them.iii) CONTRACTOR'S LIABILITY NOT LIMITED BYSUB- CONTRACTORS:Notwithstanding any sub-letting with such approval asaforesaid and notwithstanding that the ENGINEER-IN-CHARGE shall have received copies of any Subcontracts,the contractor shall be and shall remain solelyresponsible for the quality, proper and expeditious executionof the Contract in all respects as if such sub-letting orSubcontracting had not taken place, and as if such workhad been done directly by the CONTRACTOR. TheCONTRACTOR shall bear all responsibility for any act oromission on the part of sub-contractors in regard to work tobe performed under the CONTRACT.iv) EMPLOYER MAY TERMINATE SUB-CONTRACTS:If any SUB-CONTRACTOR engaged upon the works at thesite executes any works which in the opinion of theENGINEER-IN-CHARGE is not in accordance with theCONTRACT documents, the EMPLOYER may by writtennotice to the CONTRACTOR request him to terminate suchsubcontract and the CONTRACTOR upon the receipt of25
General Conditions of Contractsuch notice shall terminate such Subcontract and dismissthe SUB-CONTRACTOR(S) and the later shall forthwithleave the works, failing which the EMPLOYER shall have theright to remove such SUB- CONTRACTOR(S) from the site.v) NO REMEDY FOR ACTION TAKEN UNDER THISCLAUSE:No action taken by the EMPLOYER under the clause shallrelieve the CONTRACTOR of any of his liabilities under theCONTRACT or give rise to any right or compensation,extension of time or otherwise failing which the EMPLOYERshall have the right to remove such SUB-CONTRACTOR(S)from the site.38 Power of entry: 38.1 If the CONTRACTOR shall not commence the WORK in themanner previously described in the CONTRACT documents or ifhe shall at any time in the opinion of the ENGINEER-IN-CHARGE.i) fail to carry out the WORK in conformity with theCONTRACT documents, orii)fail to carry out the WORK in accordance with the TimeSchedule, oriii) substantially suspend work or the WORK for a period offourteen days without authority from theENGINEER-IN-CHARGE, oriv) fail to carry out and execute the WORK to the satisfaction ofthe ENGINEER-IN-CHARGE, orv) fail to supply sufficient or suitable construction plant,temporary works, labour, materials or things, orvi) Commit, suffer, or permit any other breach of any of theprovisions of the CONTRACT on his part to be performed orobserved or persist in any of the above mentioned breachesof the CONTRACT for fourteen days, after notice in writingshall have been given to the CONTRACTOR by theENGINEER-IN-CHARGE requiring such breach to beremedied, orvii) if the CONTRACTOR shall abandon the WORK , orviii) If the CONTRACTOR during the continuance of theCONTRACT shall become bankrupt, make any arrangementor composition with his creditors, or permit any execution tobe levied or go into liquidation whether compulsory orvoluntary not being merely a voluntary liquidation for thepurpose of amalgamation or reconstructionthen in any such case, the EMPLOYER shall have the power toenter upon the WORK and take possession thereof and of thematerials, temporary WORK, construction plant, and stockthereon, and to revoke the CONTRACTOR's licence to use thesame, and to complete the WORK by his agents, otherCONTRACTORS or workmen or to relate the same upon anyterms and to such other person, firm or corporation as the26
- Page 13 and 14: 8SCOPE OF WORK.The scope of work sh
- Page 15 and 16: 10Special Conditions of Contract- P
- Page 17 and 18: 12of the site , and its other featu
- Page 19 and 20: 141. GeneralSPECIAL CONDITIONS OF C
- Page 21 and 22: 167. LOCATION AND SITE CONDITIONS7.
- Page 23 and 24: 18there. No interest shall payable
- Page 25 and 26: 20In case tenderer's quoted rates f
- Page 27 and 28: 22respect for the contract and of p
- Page 29 and 30: 24(C) The payment shall be made by
- Page 31 and 32: 262. The contractor liable to pay S
- Page 33: 2847. MEASUREMENT OF WORKMeasuremen
- Page 41 and 42: General Conditions of Contract1.1.1
- Page 43 and 44: General Conditions of Contractcomme
- Page 45 and 46: General Conditions of Contract2.4.5
- Page 47 and 48: General Conditions of Contract4. Do
- Page 49 and 50: General Conditions of Contractof co
- Page 51 and 52: General Conditions of Contract10.2
- Page 53 and 54: General Conditions of Contractissue
- Page 55 and 56: General Conditions of Contractdue t
- Page 57 and 58: General Conditions of Contractwill
- Page 59 and 60: General Conditions of Contract27.3
- Page 61 and 62: General Conditions of Contractactio
- Page 63: General Conditions of Contract36 Co
- Page 67 and 68: General Conditions of Contract40 Ot
- Page 69 and 70: General Conditions of Contract44.3
- Page 71 and 72: General Conditions of ContractCONTR
- Page 73 and 74: General Conditions of Contract60 Al
- Page 75 and 76: General Conditions of Contract(The
- Page 77 and 78: General Conditions of Contracteffic
- Page 79 and 80: General Conditions of Contractii)Th
- Page 81 and 82: General Conditions of Contractcondi
- Page 83 and 84: General Conditions of ContractENGIN
- Page 85 and 86: General Conditions of Contractof WO
- Page 87 and 88: General Conditions of Contract83 Tr
- Page 89 and 90: General Conditions of Contractii)SC
- Page 91 and 92: General Conditions of Contract88 Pr
- Page 93 and 94: General Conditions of Contracton wi
- Page 95 and 96: General Conditions of Contractv) Ce
- Page 97 and 98: General Conditions of ContractAny l
- Page 99 and 100: General Conditions of Contractdefau
- Page 101 and 102: General Conditions of Contractunder
- Page 103 and 104: General Conditions of Contract105 C
- Page 105 and 106: General Conditions of ContractIndia
- Page 107 and 108: General Conditions of Contractused
- Page 109 and 110: General Conditions of Contractsuita
- Page 111 and 112: General Conditions of ContractIn ad
- Page 113 and 114: General Conditions of ContractPROFO
General Conditions of Contractkind in the course of their work or during their employment, whichare connected directly or indirectly with the CONTRACT.36.4 If and when required by the EMPLOYER and CONTRACTOR'spersonnel entering upon the EMPLOYER's premises shall beproperly identified by badges of a type acceptable to theEMPLOYER which must be worn at all times on EMPLOYER'spremises. CONTRACTOR may be required to obtain daily entrypasses for his staff/employees from EMPLOYER to work withinoperating areas. These being safety requirements, norelaxations on this account shall be given to CONTRACTOR.37 Sub-letting of works: 37.1 No part of the CONTRACT nor any share or interest therein shallin any manner or degree be transferred, assigned or sublet bythe CONTRACTOR directly or indirectly to any person, firm orcorporation whatsoever without the consent in writing, of theENGINEER/EMPLOYER except as provided for in thesucceeding sub-clause.i) SUB-CONTRACTS <strong>FOR</strong> TEMPORARY WORKS ETC.:The EMPLOYER may give written consent to Sub- contractfor the execution of any part of the WORK at the site, beingentered in to by CONTRACTOR provided each individualSub- contract is submitted to the ENGINEER-IN-CHARGEbefore being entered into and is approved by him.ii)LIST OF SUB-CONTRACTORS TO BE SUPPLIED:At the commencement of every month the CONTRACTORshall furnish to the ENGINEER-IN- CHARGE list of allSUB-CONTRACTORS or other persons or firms engaged bythe CONTRACTOR and working at the SITE during theprevious month with particulars of the general nature of theSubcontract or works done by them.iii) CONTRACTOR'S LIABILITY NOT LIMITED BYSUB- CONTRACTORS:Notwithstanding any sub-letting with such approval asaforesaid and notwithstanding that the ENGINEER-IN-CHARGE shall have received copies of any Subcontracts,the contractor shall be and shall remain solelyresponsible for the quality, proper and expeditious executionof the Contract in all respects as if such sub-letting orSubcontracting had not taken place, and as if such workhad been done directly by the CONTRACTOR. TheCONTRACTOR shall bear all responsibility for any act oromission on the part of sub-contractors in regard to work tobe performed under the CONTRACT.iv) EMPLOYER MAY TERMINATE SUB-CONTRACTS:If any SUB-CONTRACTOR engaged upon the works at thesite executes any works which in the opinion of theENGINEER-IN-CHARGE is not in accordance with theCONTRACT documents, the EMPLOYER may by writtennotice to the CONTRACTOR request him to terminate suchsubcontract and the CONTRACTOR upon the receipt of25