General Conditions of ContractNote: The Earnest Money of the unsuccessful bidder will bereturned by EMPLOYER/CONSULTANT, directly to thetenderer (s), within a reasonable period of time but not later than30 days after the expiration of the period of bid validityprescribed by EMPLOYER.7 Validity: 7.1 Tender submitted by tenderers shall remain valid for acceptancefor a period of "4 MONTHS" from the date of opening of thetender. The tenderers shall not be entitled during the said periodof 4 months, without the consent in writing of the EMPLOYER, torevoke or cancel his tender or to vary the tender given or any termthereof. In case of tender revoking or canceling his tender orvarying any term in regard thereof without the consent ofEMPLOYER in writing, the EMPLOYER shall forfeit EarnestMoney paid by him alongwith tender.8 Addenda/Corrigenda 8.1 Addenda/ Corrigenda to the Tender Documents will be issued induplicate prior to the date of opening of the tenders to clarifydocuments or to reflect modification in design or CONTRACTterms.8.2 Each addenda/ corrigendum issued will be issued in duplicate toeach person or organisation to whom set of Tender Documentshas been issued. Recipient will retain tenderer's copy of eachAddendum/Corrigendum and attach original copy duly signedalong with his offer. All Addenda/Corrigenda issued shall becomepart of Tender Documents.9 Right of Employer toAccept or Reject Tender:9.1 The right to accept the tender will rest with the EMPLOYER. TheEMPLOYER, however, does not bind himself to accept the lowesttender, and reserves to itself the authority to reject any or all thetenders received without assigning any reason whatsoever. At theoption of the Employer, the work for which the tender had beeninvited, may be awarded to one Contractor or split between morethan one bidders, in which case the award will be made for onlythat part of the work, in respect of which the bid has beenaccepted. The quoted rates should hold good for sucheventualities.Tenders in which any of the particulars and prescribed informationare missing or are incomplete in any respect and/or theprescribed conditions are not fulfilled are liable to be rejected.The Tender containing uncalled for remarks or any additionalconditions are liable to be rejected.Canvassing in connection with tenders is strictly prohibited andtenders submitted by the Tenderers who resort to canvassing willbe liable to rejection.10 Time Schedule 10.1 The WORK shall be executed strictly as per the TIME SCHEDULEspecified in TENDER/CONTRACT Document. The period ofconstruction given in Time Schedule includes the time required formobilisation as well as testing, rectifications if any, retesting andcompletion in all respects to the entire satisfaction of theENGINEER-IN- CHARGE.11
General Conditions of Contract10.2 A joint programme of execution of the WORK will be prepared bythe ENGINEER-IN-CHARGE and CONTRACTOR based onpriority requirement of this project. This programme will take intoaccount the time of completion mentioned in 10.1 above and thetime allowed for the priority works by theENGINEER-IN-CHARGE.10.3 Monthly/Weekly construction programme will; be drawn up by theENGINEER-IN-CHARGE jointly with the CONTRACTOR, basedon availability of work fronts and the joint construction programmeas per 10.2 above. The CONTRACTOR shall scrupulouslyadhere to these targets /programmes by deploying adequatepersonnel, construction tools and tackles and he shall also supplyhimself all materials of his scope of supply in good time to achievethe targets/programmes. In all matters concerning the extent oftargets set out in the weekly and monthly programmes and thedegree of achievements the decision of theENGINEER-IN-CHARGE will be final and binding on theCONTRACTOR.11 Tenderer’s Responsibility 11.1 The intending tenderers shall be deemed to have visited the SITEand familiarised submitting the tender. Non-familiarity with thesite conditions will not be considered a reason either for extraclaims or for not carrying out the works in strict conformity with theDRAWINGS and SPECIFICATIONS or for any delay inperformance.12 Retired Government orCompany Officers12.1 No Engineer of Gazetted rank or other Gazetted Officer employedin Engineering or Administrative duties in an EngineeringDepartment of the States/ Central Government or of theEMPLOYER is allowed to work as a CONTRACTOR for a periodof two years after his retirement from Government Service, or fromthe employment of the EMPLOYER without the previouspermission of the EMPLOYER. The CONTRACT, if awarded, isliable to be cancelled if either the CONTRACTOR or any of hisemployees is found at any time to be such a person, who has notobtained the permission of the State/Central Government or of theEMPLOYER as aforesaid before submission of tender, orengagement in the CONTRACTOR'S service as the case may be.13 Signing of the Contract: 13.1 The successful tenderer shall be required to execute anAGREEMENT in the proforma attached with TENDERDOCUMENT within 15 days of the receipt by him of theNotification of Acceptance of Tender. In the event of failure onthe part of the successful tenderer to sign the AGREEMENT withinthe above stipulated period, the Earnest Money or his initialdeposit will be forefeited and the acceptance of the tender shall beconsidered as cancelled.14 Field Management &Controlling/CoordinatingAuthority:14.1 The field management will be the responsibility of theENGINEER-IN-CHARGE, who will be nominated by theEMPLOYER. The ENGINEER-IN-CHARGE may also authorisehis representatives to assist in performing his duties and functions.14.2 The ENGINEER-IN-CHARGE shall coordinate the works ofvarious agencies engaged at site to ensure minimum disruption ofwork carried out by different agencies. It shall be the responsibilityof the CONTRACTOR to plan and execute the work strictly inaccordance with site instructions to avoid hindrance to the workbeing executed by other agencies.12
- Page 3: Acta Ophthalmol. 2012 Jun;90(4):e26
- Page 8: 3of the State Bank of India or any
- Page 13 and 14: 8SCOPE OF WORK.The scope of work sh
- Page 15 and 16: 10Special Conditions of Contract- P
- Page 17 and 18: 12of the site , and its other featu
- Page 19 and 20: 141. GeneralSPECIAL CONDITIONS OF C
- Page 21 and 22: 167. LOCATION AND SITE CONDITIONS7.
- Page 23 and 24: 18there. No interest shall payable
- Page 25 and 26: 20In case tenderer's quoted rates f
- Page 27 and 28: 22respect for the contract and of p
- Page 29 and 30: 24(C) The payment shall be made by
- Page 31 and 32: 262. The contractor liable to pay S
- Page 33: 2847. MEASUREMENT OF WORKMeasuremen
- Page 41 and 42: General Conditions of Contract1.1.1
- Page 43 and 44: General Conditions of Contractcomme
- Page 45 and 46: General Conditions of Contract2.4.5
- Page 47 and 48: General Conditions of Contract4. Do
- Page 49: General Conditions of Contractof co
- Page 53 and 54: General Conditions of Contractissue
- Page 55 and 56: General Conditions of Contractdue t
- Page 57 and 58: General Conditions of Contractwill
- Page 59 and 60: General Conditions of Contract27.3
- Page 61 and 62: General Conditions of Contractactio
- Page 63 and 64: General Conditions of Contract36 Co
- Page 65 and 66: General Conditions of Contractsuch
- Page 67 and 68: General Conditions of Contract40 Ot
- Page 69 and 70: General Conditions of Contract44.3
- Page 71 and 72: General Conditions of ContractCONTR
- Page 73 and 74: General Conditions of Contract60 Al
- Page 75 and 76: General Conditions of Contract(The
- Page 77 and 78: General Conditions of Contracteffic
- Page 79 and 80: General Conditions of Contractii)Th
- Page 81 and 82: General Conditions of Contractcondi
- Page 83 and 84: General Conditions of ContractENGIN
- Page 85 and 86: General Conditions of Contractof WO
- Page 87 and 88: General Conditions of Contract83 Tr
- Page 89 and 90: General Conditions of Contractii)SC
- Page 91 and 92: General Conditions of Contract88 Pr
- Page 93 and 94: General Conditions of Contracton wi
- Page 95 and 96: General Conditions of Contractv) Ce
- Page 97 and 98: General Conditions of ContractAny l
- Page 99 and 100: General Conditions of Contractdefau
General Conditions of Contract10.2 A joint programme of execution of the WORK will be prepared bythe ENGINEER-IN-CHARGE and CONTRACTOR based onpriority requirement of this project. This programme will take intoaccount the time of completion mentioned in 10.1 above and thetime allowed for the priority works by theENGINEER-IN-CHARGE.10.3 Monthly/Weekly construction programme will; be drawn up by theENGINEER-IN-CHARGE jointly with the CONTRACTOR, basedon availability of work fronts and the joint construction programmeas per 10.2 above. The CONTRACTOR shall scrupulouslyadhere to these targets /programmes by deploying adequatepersonnel, construction tools and tackles and he shall also supplyhimself all materials of his scope of supply in good time to achievethe targets/programmes. In all matters concerning the extent oftargets set out in the weekly and monthly programmes and thedegree of achievements the decision of theENGINEER-IN-CHARGE will be final and binding on theCONTRACTOR.11 Tenderer’s Responsibility 11.1 The intending tenderers shall be deemed to have visited the SITEand familiarised submitting the tender. Non-familiarity with thesite conditions will not be considered a reason either for extraclaims or for not carrying out the works in strict conformity with theDRAWINGS and SPECIFICATIONS or for any delay inperformance.12 Retired Government orCompany Officers12.1 No Engineer of Gazetted rank or other Gazetted Officer employedin Engineering or Administrative duties in an EngineeringDepartment of the States/ Central Government or of theEMPLOYER is allowed to work as a CONTRACTOR for a periodof two years after his retirement from Government Service, or fromthe employment of the EMPLOYER without the previouspermission of the EMPLOYER. The CONTRACT, if awarded, isliable to be cancelled if either the CONTRACTOR or any of hisemployees is found at any time to be such a person, who has notobtained the permission of the State/Central Government or of theEMPLOYER as aforesaid before submission of tender, orengagement in the CONTRACTOR'S service as the case may be.13 Signing of the Contract: 13.1 The successful tenderer shall be required to execute anAGREEMENT in the proforma attached with TENDERDOCUMENT within 15 days of the receipt by him of theNotification of Acceptance of Tender. In the event of failure onthe part of the successful tenderer to sign the AGREEMENT withinthe above stipulated period, the Earnest Money or his initialdeposit will be forefeited and the acceptance of the tender shall beconsidered as cancelled.14 Field Management &Controlling/CoordinatingAuthority:14.1 The field management will be the responsibility of theENGINEER-IN-CHARGE, who will be nominated by theEMPLOYER. The ENGINEER-IN-CHARGE may also authorisehis representatives to assist in performing his duties and functions.14.2 The ENGINEER-IN-CHARGE shall coordinate the works ofvarious agencies engaged at site to ensure minimum disruption ofwork carried out by different agencies. It shall be the responsibilityof the CONTRACTOR to plan and execute the work strictly inaccordance with site instructions to avoid hindrance to the workbeing executed by other agencies.12