General Conditions of ContractNote: The Earnest Money of the unsuccessful bidder will bereturned by EMPLOYER/CONSULTANT, directly to thetenderer (s), within a reasonable period of time but not later than30 days after the expiration of the period of bid validityprescribed by EMPLOYER.7 Validity: 7.1 Tender submitted by tenderers shall remain valid for acceptancefor a period of "4 MONTHS" from the date of opening of thetender. The tenderers shall not be entitled during the said periodof 4 months, without the consent in writing of the EMPLOYER, torevoke or cancel his tender or to vary the tender given or any termthereof. In case of tender revoking or canceling his tender orvarying any term in regard thereof without the consent ofEMPLOYER in writing, the EMPLOYER shall forfeit EarnestMoney paid by him alongwith tender.8 Addenda/Corrigenda 8.1 Addenda/ Corrigenda to the Tender Documents will be issued induplicate prior to the date of opening of the tenders to clarifydocuments or to reflect modification in design or CONTRACTterms.8.2 Each addenda/ corrigendum issued will be issued in duplicate toeach person or organisation to whom set of Tender Documentshas been issued. Recipient will retain tenderer's copy of eachAddendum/Corrigendum and attach original copy duly signedalong with his offer. All Addenda/Corrigenda issued shall becomepart of Tender Documents.9 Right of Employer toAccept or Reject Tender:9.1 The right to accept the tender will rest with the EMPLOYER. TheEMPLOYER, however, does not bind himself to accept the lowesttender, and reserves to itself the authority to reject any or all thetenders received without assigning any reason whatsoever. At theoption of the Employer, the work for which the tender had beeninvited, may be awarded to one Contractor or split between morethan one bidders, in which case the award will be made for onlythat part of the work, in respect of which the bid has beenaccepted. The quoted rates should hold good for sucheventualities.Tenders in which any of the particulars and prescribed informationare missing or are incomplete in any respect and/or theprescribed conditions are not fulfilled are liable to be rejected.The Tender containing uncalled for remarks or any additionalconditions are liable to be rejected.Canvassing in connection with tenders is strictly prohibited andtenders submitted by the Tenderers who resort to canvassing willbe liable to rejection.10 Time Schedule 10.1 The WORK shall be executed strictly as per the TIME SCHEDULEspecified in TENDER/CONTRACT Document. The period ofconstruction given in Time Schedule includes the time required formobilisation as well as testing, rectifications if any, retesting andcompletion in all respects to the entire satisfaction of theENGINEER-IN- CHARGE.11

General Conditions of Contract10.2 A joint programme of execution of the WORK will be prepared bythe ENGINEER-IN-CHARGE and CONTRACTOR based onpriority requirement of this project. This programme will take intoaccount the time of completion mentioned in 10.1 above and thetime allowed for the priority works by theENGINEER-IN-CHARGE.10.3 Monthly/Weekly construction programme will; be drawn up by theENGINEER-IN-CHARGE jointly with the CONTRACTOR, basedon availability of work fronts and the joint construction programmeas per 10.2 above. The CONTRACTOR shall scrupulouslyadhere to these targets /programmes by deploying adequatepersonnel, construction tools and tackles and he shall also supplyhimself all materials of his scope of supply in good time to achievethe targets/programmes. In all matters concerning the extent oftargets set out in the weekly and monthly programmes and thedegree of achievements the decision of theENGINEER-IN-CHARGE will be final and binding on theCONTRACTOR.11 Tenderer’s Responsibility 11.1 The intending tenderers shall be deemed to have visited the SITEand familiarised submitting the tender. Non-familiarity with thesite conditions will not be considered a reason either for extraclaims or for not carrying out the works in strict conformity with theDRAWINGS and SPECIFICATIONS or for any delay inperformance.12 Retired Government orCompany Officers12.1 No Engineer of Gazetted rank or other Gazetted Officer employedin Engineering or Administrative duties in an EngineeringDepartment of the States/ Central Government or of theEMPLOYER is allowed to work as a CONTRACTOR for a periodof two years after his retirement from Government Service, or fromthe employment of the EMPLOYER without the previouspermission of the EMPLOYER. The CONTRACT, if awarded, isliable to be cancelled if either the CONTRACTOR or any of hisemployees is found at any time to be such a person, who has notobtained the permission of the State/Central Government or of theEMPLOYER as aforesaid before submission of tender, orengagement in the CONTRACTOR'S service as the case may be.13 Signing of the Contract: 13.1 The successful tenderer shall be required to execute anAGREEMENT in the proforma attached with TENDERDOCUMENT within 15 days of the receipt by him of theNotification of Acceptance of Tender. In the event of failure onthe part of the successful tenderer to sign the AGREEMENT withinthe above stipulated period, the Earnest Money or his initialdeposit will be forefeited and the acceptance of the tender shall beconsidered as cancelled.14 Field Management &Controlling/CoordinatingAuthority:14.1 The field management will be the responsibility of theENGINEER-IN-CHARGE, who will be nominated by theEMPLOYER. The ENGINEER-IN-CHARGE may also authorisehis representatives to assist in performing his duties and functions.14.2 The ENGINEER-IN-CHARGE shall coordinate the works ofvarious agencies engaged at site to ensure minimum disruption ofwork carried out by different agencies. It shall be the responsibilityof the CONTRACTOR to plan and execute the work strictly inaccordance with site instructions to avoid hindrance to the workbeing executed by other agencies.12

General Conditions of Contract10.2 A joint programme of execution of the WORK will be prepared bythe ENGINEER-IN-CHARGE and CONTRACTOR based onpriority requirement of this project. This programme will take intoaccount the time of completion mentioned in 10.1 above and thetime allowed for the priority works by theENGINEER-IN-CHARGE.10.3 Monthly/Weekly construction programme will; be drawn up by theENGINEER-IN-CHARGE jointly with the CONTRACTOR, basedon availability of work fronts and the joint construction programmeas per 10.2 above. The CONTRACTOR shall scrupulouslyadhere to these targets /programmes by deploying adequatepersonnel, construction tools and tackles and he shall also supplyhimself all materials of his scope of supply in good time to achievethe targets/programmes. In all matters concerning the extent oftargets set out in the weekly and monthly programmes and thedegree of achievements the decision of theENGINEER-IN-CHARGE will be final and binding on theCONTRACTOR.11 Tenderer’s Responsibility 11.1 The intending tenderers shall be deemed to have visited the SITEand familiarised submitting the tender. Non-familiarity with thesite conditions will not be considered a reason either for extraclaims or for not carrying out the works in strict conformity with theDRAWINGS and SPECIFICATIONS or for any delay inperformance.12 Retired Government orCompany Officers12.1 No Engineer of Gazetted rank or other Gazetted Officer employedin Engineering or Administrative duties in an EngineeringDepartment of the States/ Central Government or of theEMPLOYER is allowed to work as a CONTRACTOR for a periodof two years after his retirement from Government Service, or fromthe employment of the EMPLOYER without the previouspermission of the EMPLOYER. The CONTRACT, if awarded, isliable to be cancelled if either the CONTRACTOR or any of hisemployees is found at any time to be such a person, who has notobtained the permission of the State/Central Government or of theEMPLOYER as aforesaid before submission of tender, orengagement in the CONTRACTOR'S service as the case may be.13 Signing of the Contract: 13.1 The successful tenderer shall be required to execute anAGREEMENT in the proforma attached with TENDERDOCUMENT within 15 days of the receipt by him of theNotification of Acceptance of Tender. In the event of failure onthe part of the successful tenderer to sign the AGREEMENT withinthe above stipulated period, the Earnest Money or his initialdeposit will be forefeited and the acceptance of the tender shall beconsidered as cancelled.14 Field Management &Controlling/CoordinatingAuthority:14.1 The field management will be the responsibility of theENGINEER-IN-CHARGE, who will be nominated by theEMPLOYER. The ENGINEER-IN-CHARGE may also authorisehis representatives to assist in performing his duties and functions.14.2 The ENGINEER-IN-CHARGE shall coordinate the works ofvarious agencies engaged at site to ensure minimum disruption ofwork carried out by different agencies. It shall be the responsibilityof the CONTRACTOR to plan and execute the work strictly inaccordance with site instructions to avoid hindrance to the workbeing executed by other agencies.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!