REQUEST FOR QUOTATION - GAIL (India)
REQUEST FOR QUOTATION - GAIL (India) REQUEST FOR QUOTATION - GAIL (India)
General Conditions of ContractCONTRACTOR shall fail to comply with these requirements, theENGINEER-IN-CHARGE may at he expenses of theCONTRACTOR remove such surplus, and rubbish materials anddispose off the same as he deems fit and get the site cleared asaforesaid; and CONTRACTOR shall forthwith pay the amount ofall expenses so incurred and shall have no claim in respect of anysuch surplus materials disposed off as aforesaid. But theEMPLOYER reserves the right to ask the CONTRACTOR anytime during the pendency of the CONTRACT to vacate the land bygiving 7 days notice on security reasons or on national interest orotherwise. Rent may be charged for the land so occupied fromcontractor by the Employer.The CONTRACTOR shall put up temporary structures as requiredby them for their office, fabrication shop and construction storesonly in the area allocated to them on the project site by theEMPLOYER or his authorised representative. No teastalls/canteens should be put up or allowed to be put up by anyCONTRACTOR in the allotted land or complex area withoutwritten permission of the EMPLOYER.No unauthorised buildings, constructions or structures should beput up by the CONTRACTOR anywhere on the project site.For uninterrupted fabrication work, the CONTRACTOR shall putup temporary covered structures at his cost within Area in thelocation allocated to them in the project site by the EMPLOYER orhis authorised representative.No person except for authorised watchman shall be allowed tostay in the plant area/CONTRACTOR's area after completion ofthe day's job without prior written permission fromENGINEER-IN-CHARGE.2.6 Land for Residential Accommodation:-:No Land shall be madeavailable for residential accommodation for staff and labour ofCONTRACTOR.SECTION-III GENERAL INSTRUCTIONS TO TENDERERS3. Submission of Tender: 3.1 TENDER must be submitted without making any additions,alterations, and as per details given in other clauses hereunder.The requisite details shall be filled in by the TENDERER at spaceprovided under “Submission of Tender at the beginning of GCC ofTender Document. The rate shall be filled only in the schedulegiven in this Tender Document.3.2 Addenda/Corrigenda to this Tender Document, if issued, must besigned, submitted alongwith the Tender Document. the tenderershould write clearly the revised quantities in Schedule of Rates ofTender Document and should price the WORK based on revisedquantities when amendments of quantities are issued in addenda.3.3 Covering letter alongwith its enclosures accompanying the TenderDocument and all further correspondence shall be submitted induplicate.7
General Conditions of Contract4. Documents: 4.1 General:3.4 Tenderers are advised to submit quotations based strictly on theterms and conditions and specifications contained in the TenderDocuments and not to stipulate any deviations.3.5 Tenders should always be placed in double sealed covers,superscribing ["QUOTATION DO NOT OPEN" Tender for_________________________ Project of GAIL (India) Limited duefor opening on _______________________]. The Full Name,Address and Telegraphic Address, Fax No. of the Tenderers shallbe written on the bottom left hand corner of the sealed cover.The tenders as submitted, will consist of the following:i) Complete set of Tender Documents (Original) as sold dulyfilled in and signed by the tenderer as prescribed in differentclauses of the Tender Documents.ii)iii)iv)Earnest money in the manner specified in Clause 6 hereof.Power of Attorney or a true copy thereof duly attested by aGazetted Officer in case an authorised representative hassigned the tender, as required by Clause 14 hereof.Information regarding tenderers in the proforma enclosed.v) Details of work of similar type and magnitude carried out bythe Tenderer in the proforma provided in the tenderdocument.vi)vii)viii)ix)Organisation chart giving details of field management atsite, the tenderer proposes to have for this job.Details of construction plant and equipments available withthe tenderer for using in this work.Solvency Certificate from Scheduled Bank to prove thefinancial ability to carry out the work tendered for.Latest Balance Sheet and Profit & Loss Account dulyaudited.x) Details of present commitment as per proforma enclosed totender.xi)xii)xiii)Data required regarding SUB-CONTRACTOR(s)/ Supplier/Manufacturers and other technical informations the tendererwish to furnish.Provident fund registration certificateList showing all enclosures to tender.4.2 All pages are to be Initiated: All signatures in Tender Documentsshall be dated, as well as, all the pages of all sections of TenderDocuments shall be initialed at the lower right hand corner andsigned wherever required in the tender papers by the TENDERER8
- Page 3: Acta Ophthalmol. 2012 Jun;90(4):e26
- Page 8: 3of the State Bank of India or any
- Page 13 and 14: 8SCOPE OF WORK.The scope of work sh
- Page 15 and 16: 10Special Conditions of Contract- P
- Page 17 and 18: 12of the site , and its other featu
- Page 19 and 20: 141. GeneralSPECIAL CONDITIONS OF C
- Page 21 and 22: 167. LOCATION AND SITE CONDITIONS7.
- Page 23 and 24: 18there. No interest shall payable
- Page 25 and 26: 20In case tenderer's quoted rates f
- Page 27 and 28: 22respect for the contract and of p
- Page 29 and 30: 24(C) The payment shall be made by
- Page 31 and 32: 262. The contractor liable to pay S
- Page 33: 2847. MEASUREMENT OF WORKMeasuremen
- Page 41 and 42: General Conditions of Contract1.1.1
- Page 43 and 44: General Conditions of Contractcomme
- Page 45: General Conditions of Contract2.4.5
- Page 49 and 50: General Conditions of Contractof co
- Page 51 and 52: General Conditions of Contract10.2
- Page 53 and 54: General Conditions of Contractissue
- Page 55 and 56: General Conditions of Contractdue t
- Page 57 and 58: General Conditions of Contractwill
- Page 59 and 60: General Conditions of Contract27.3
- Page 61 and 62: General Conditions of Contractactio
- Page 63 and 64: General Conditions of Contract36 Co
- Page 65 and 66: General Conditions of Contractsuch
- Page 67 and 68: General Conditions of Contract40 Ot
- Page 69 and 70: General Conditions of Contract44.3
- Page 71 and 72: General Conditions of ContractCONTR
- Page 73 and 74: General Conditions of Contract60 Al
- Page 75 and 76: General Conditions of Contract(The
- Page 77 and 78: General Conditions of Contracteffic
- Page 79 and 80: General Conditions of Contractii)Th
- Page 81 and 82: General Conditions of Contractcondi
- Page 83 and 84: General Conditions of ContractENGIN
- Page 85 and 86: General Conditions of Contractof WO
- Page 87 and 88: General Conditions of Contract83 Tr
- Page 89 and 90: General Conditions of Contractii)SC
- Page 91 and 92: General Conditions of Contract88 Pr
- Page 93 and 94: General Conditions of Contracton wi
- Page 95 and 96: General Conditions of Contractv) Ce
General Conditions of Contract4. Documents: 4.1 General:3.4 Tenderers are advised to submit quotations based strictly on theterms and conditions and specifications contained in the TenderDocuments and not to stipulate any deviations.3.5 Tenders should always be placed in double sealed covers,superscribing ["<strong>QUOTATION</strong> DO NOT OPEN" Tender for_________________________ Project of <strong>GAIL</strong> (<strong>India</strong>) Limited duefor opening on _______________________]. The Full Name,Address and Telegraphic Address, Fax No. of the Tenderers shallbe written on the bottom left hand corner of the sealed cover.The tenders as submitted, will consist of the following:i) Complete set of Tender Documents (Original) as sold dulyfilled in and signed by the tenderer as prescribed in differentclauses of the Tender Documents.ii)iii)iv)Earnest money in the manner specified in Clause 6 hereof.Power of Attorney or a true copy thereof duly attested by aGazetted Officer in case an authorised representative hassigned the tender, as required by Clause 14 hereof.Information regarding tenderers in the proforma enclosed.v) Details of work of similar type and magnitude carried out bythe Tenderer in the proforma provided in the tenderdocument.vi)vii)viii)ix)Organisation chart giving details of field management atsite, the tenderer proposes to have for this job.Details of construction plant and equipments available withthe tenderer for using in this work.Solvency Certificate from Scheduled Bank to prove thefinancial ability to carry out the work tendered for.Latest Balance Sheet and Profit & Loss Account dulyaudited.x) Details of present commitment as per proforma enclosed totender.xi)xii)xiii)Data required regarding SUB-CONTRACTOR(s)/ Supplier/Manufacturers and other technical informations the tendererwish to furnish.Provident fund registration certificateList showing all enclosures to tender.4.2 All pages are to be Initiated: All signatures in Tender Documentsshall be dated, as well as, all the pages of all sections of TenderDocuments shall be initialed at the lower right hand corner andsigned wherever required in the tender papers by the TENDERER8