General Conditions of Contractprovided the Contractor makes his own arrangement for the watermeter which shall be in custody of the Employer and other pipenet works from source of supply and such distribution pipenetwork shall have prior approval of the Engineer-in-Charge so asnot to interfere with the layout and progress of the otherconstruction works. In such case, the rate for water shall bededucted from the running account bills.However, the Employer does not guarantee the supply of waterand this does not relieve the Contractor of his responsibility inmaking his own arrangement and for the timely completion of thevarious works as stipulated.2.4 Power Supply:2.4.1 Subject to availability, EMPLOYER will supply power at 400/440 Vat only one point at the nearest sub-station, from where theCONTRACTOR will make his own arrangement for temporarydistribution. The point of supply will not be more than 500 m awayfrom the CONTRACTOR'S premises. All the works will be doneas per the applicable regulations and passed by theENGINEER-IN-CHARGE. The temporary line will be removedforthwith after the completion of work or if there is any hindrancecaused to the other works due to the alignment of these lines, theCONTRACTOR will re-route or remove the temporary lines at hisown cost. The CONTRACTOR at his cost will also providesuitable electric meters, fuses, switches, etc. for purposes ofpayment to the EMPLOYER which should be in the custody andcontrol of the EMPLOYER. The cost of power supply shall bepayable to the EMPLOYER every month for Construction Workspower which would be deducted from the running account bills.The EMPLOYER shall not, however, guarantee the supply ofelectricity nor have any liability in respect thereof. No claim forcompensation for any failure or short supply of electricity will beadmissible.2.4.2 It shall be the responsibility of the CONTRACTOR to provide andmaintain the complete installation on the load side of the supplywith due regard to safety requirement at site. All cabling,equipment, installations etc. shall comply in all respects with thelatest statutory requirements and safety provisions i.e., as per theCentral/State Electricity Acts and Rules etc. The CONTRACTORwill ensure that his equipment and Electrical Wiring etc., areinstalled, modified, maintained by a licensedElectrician/Supervisor. A test certificate is to be produced to theENGINEER-IN-CHARGE for his approval, before power is madeavailable.2.4.3 At all times, IEA regulations shall be followed failing which theEMPLOYER has a right to disconnect the power supply withoutany reference to the CONTRACTOR. No claim shall beentertained for such disconnection by theENGINEER-IN-CHARGE. Power supply will be reconnected onlyafter production of fresh certificate from authorized electricalsupervisors.2.4.4 The EMPLOYER is not liable for any loss or damage to theCONTRACTOR's equipment as a result of variation in voltage orfrequency or interruption in power supply or other loss to theCONTRACTOR arising therefrom.5
General Conditions of Contract2.4.5 The CONTRACTOR shall ensure that the Electrical equipmentinstalled by him are such that average power factors does not fallbelow 0.90 at his premises. In case power factor falls below 0.90in any month, he will reimburse to the EMPLOYER at the penalrate determined by the EMPLOYER for all units consumed duringthe month.2.4.6 The power supply required for CONTRACTOR's colony near theplant site will be determined by the EMPLOYER and shall be asper State Electricity Board's Rules and other statutory provisionsapplicable for such installations from time to time. In case ofpower supply to CONTRACTOR's colony, the power will be madeavailable at a single point and the CONTRACTOR shall make hisown arrangement at his own cost for distribution to the occupantsof the colony as per Electricity Rules and Acts. The site andcolony shall be sufficiently illuminated to avoid accidents.2.4.7 The CONTRACTOR will have to provide and install his own lightsand power meters which will be governed as per Central/StateGovernment Electricity Rules. The metres shall be sealed by theEMPLOYER.2.4.8 In case of damage of any of the EMPLOYER’s equipment onaccount of fault, intentional or unintentional on the part of theCONTRACTOR, the EMPLOYER reserves the right to recover thecost of such damage from the CONTRACTOR's bill. Cost of HRCFuses replaced at the EMPLOYER's terminals due to any fault inthe CONTRACTOR's installation shall be to CONTRACTOR'saccount at the rates decided by the ENGINEER-IN-CHARGE.2.4.9 Only motors upto 3 HP will be allowed to be started direct on line.For motors above 3 HP and upto 100 HP a suitable Startingdevice approved by the ENGINEER- IN-CHARGE shall beprovided by the CONTRACTOR. For motors above 100 HPslipring induction motors with suitable starting devices as approvedby the ENGINEER- IN-CHARGE shall be provided by theCONTRACTOR.2.4.10 The CONTRACTOR shall ensure at his cost that all electrical linesand equipment and all installations are approved by the StateElectricity Inspector before power can be supplied to theEMPLOYER.2.4.11 The total requirement of power shall be indicated by the tendereralongwith his tender.2.5 Land for Contractor’s Field Office, Godown and Workshop: TheEMPLOYER will, at his own discretion and convenience and forthe duration of the execution of the work make available near thesite, land for construction of CONTRACTOR's Temporary FieldOffice, godowns workshops and assembly yard required for theexecution of the CONTRACT. The CONTRACTOR shall at hisown cost construct all these temporary buildings and providesuitable water supply and sanitary arrangement and get the sameapproved by the ENGINEER-IN-CHARGE.On completion of the works undertaken by the CONTRACTOR,he shall remove all temporary works erected by him and have theSITE cleaned as directed by ENGINEER-IN-CHARGE. If the6
- Page 3: Acta Ophthalmol. 2012 Jun;90(4):e26
- Page 8: 3of the State Bank of India or any
- Page 13 and 14: 8SCOPE OF WORK.The scope of work sh
- Page 15 and 16: 10Special Conditions of Contract- P
- Page 17 and 18: 12of the site , and its other featu
- Page 19 and 20: 141. GeneralSPECIAL CONDITIONS OF C
- Page 21 and 22: 167. LOCATION AND SITE CONDITIONS7.
- Page 23 and 24: 18there. No interest shall payable
- Page 25 and 26: 20In case tenderer's quoted rates f
- Page 27 and 28: 22respect for the contract and of p
- Page 29 and 30: 24(C) The payment shall be made by
- Page 31 and 32: 262. The contractor liable to pay S
- Page 33: 2847. MEASUREMENT OF WORKMeasuremen
- Page 41 and 42: General Conditions of Contract1.1.1
- Page 43: General Conditions of Contractcomme
- Page 47 and 48: General Conditions of Contract4. Do
- Page 49 and 50: General Conditions of Contractof co
- Page 51 and 52: General Conditions of Contract10.2
- Page 53 and 54: General Conditions of Contractissue
- Page 55 and 56: General Conditions of Contractdue t
- Page 57 and 58: General Conditions of Contractwill
- Page 59 and 60: General Conditions of Contract27.3
- Page 61 and 62: General Conditions of Contractactio
- Page 63 and 64: General Conditions of Contract36 Co
- Page 65 and 66: General Conditions of Contractsuch
- Page 67 and 68: General Conditions of Contract40 Ot
- Page 69 and 70: General Conditions of Contract44.3
- Page 71 and 72: General Conditions of ContractCONTR
- Page 73 and 74: General Conditions of Contract60 Al
- Page 75 and 76: General Conditions of Contract(The
- Page 77 and 78: General Conditions of Contracteffic
- Page 79 and 80: General Conditions of Contractii)Th
- Page 81 and 82: General Conditions of Contractcondi
- Page 83 and 84: General Conditions of ContractENGIN
- Page 85 and 86: General Conditions of Contractof WO
- Page 87 and 88: General Conditions of Contract83 Tr
- Page 89 and 90: General Conditions of Contractii)SC
- Page 91 and 92: General Conditions of Contract88 Pr
- Page 93 and 94: General Conditions of Contracton wi
General Conditions of Contract2.4.5 The CONTRACTOR shall ensure that the Electrical equipmentinstalled by him are such that average power factors does not fallbelow 0.90 at his premises. In case power factor falls below 0.90in any month, he will reimburse to the EMPLOYER at the penalrate determined by the EMPLOYER for all units consumed duringthe month.2.4.6 The power supply required for CONTRACTOR's colony near theplant site will be determined by the EMPLOYER and shall be asper State Electricity Board's Rules and other statutory provisionsapplicable for such installations from time to time. In case ofpower supply to CONTRACTOR's colony, the power will be madeavailable at a single point and the CONTRACTOR shall make hisown arrangement at his own cost for distribution to the occupantsof the colony as per Electricity Rules and Acts. The site andcolony shall be sufficiently illuminated to avoid accidents.2.4.7 The CONTRACTOR will have to provide and install his own lightsand power meters which will be governed as per Central/StateGovernment Electricity Rules. The metres shall be sealed by theEMPLOYER.2.4.8 In case of damage of any of the EMPLOYER’s equipment onaccount of fault, intentional or unintentional on the part of theCONTRACTOR, the EMPLOYER reserves the right to recover thecost of such damage from the CONTRACTOR's bill. Cost of HRCFuses replaced at the EMPLOYER's terminals due to any fault inthe CONTRACTOR's installation shall be to CONTRACTOR'saccount at the rates decided by the ENGINEER-IN-CHARGE.2.4.9 Only motors upto 3 HP will be allowed to be started direct on line.For motors above 3 HP and upto 100 HP a suitable Startingdevice approved by the ENGINEER- IN-CHARGE shall beprovided by the CONTRACTOR. For motors above 100 HPslipring induction motors with suitable starting devices as approvedby the ENGINEER- IN-CHARGE shall be provided by theCONTRACTOR.2.4.10 The CONTRACTOR shall ensure at his cost that all electrical linesand equipment and all installations are approved by the StateElectricity Inspector before power can be supplied to theEMPLOYER.2.4.11 The total requirement of power shall be indicated by the tendereralongwith his tender.2.5 Land for Contractor’s Field Office, Godown and Workshop: TheEMPLOYER will, at his own discretion and convenience and forthe duration of the execution of the work make available near thesite, land for construction of CONTRACTOR's Temporary FieldOffice, godowns workshops and assembly yard required for theexecution of the CONTRACT. The CONTRACTOR shall at hisown cost construct all these temporary buildings and providesuitable water supply and sanitary arrangement and get the sameapproved by the ENGINEER-IN-CHARGE.On completion of the works undertaken by the CONTRACTOR,he shall remove all temporary works erected by him and have theSITE cleaned as directed by ENGINEER-IN-CHARGE. If the6