General Conditions of Contractprovided the Contractor makes his own arrangement for the watermeter which shall be in custody of the Employer and other pipenet works from source of supply and such distribution pipenetwork shall have prior approval of the Engineer-in-Charge so asnot to interfere with the layout and progress of the otherconstruction works. In such case, the rate for water shall bededucted from the running account bills.However, the Employer does not guarantee the supply of waterand this does not relieve the Contractor of his responsibility inmaking his own arrangement and for the timely completion of thevarious works as stipulated.2.4 Power Supply:2.4.1 Subject to availability, EMPLOYER will supply power at 400/440 Vat only one point at the nearest sub-station, from where theCONTRACTOR will make his own arrangement for temporarydistribution. The point of supply will not be more than 500 m awayfrom the CONTRACTOR'S premises. All the works will be doneas per the applicable regulations and passed by theENGINEER-IN-CHARGE. The temporary line will be removedforthwith after the completion of work or if there is any hindrancecaused to the other works due to the alignment of these lines, theCONTRACTOR will re-route or remove the temporary lines at hisown cost. The CONTRACTOR at his cost will also providesuitable electric meters, fuses, switches, etc. for purposes ofpayment to the EMPLOYER which should be in the custody andcontrol of the EMPLOYER. The cost of power supply shall bepayable to the EMPLOYER every month for Construction Workspower which would be deducted from the running account bills.The EMPLOYER shall not, however, guarantee the supply ofelectricity nor have any liability in respect thereof. No claim forcompensation for any failure or short supply of electricity will beadmissible.2.4.2 It shall be the responsibility of the CONTRACTOR to provide andmaintain the complete installation on the load side of the supplywith due regard to safety requirement at site. All cabling,equipment, installations etc. shall comply in all respects with thelatest statutory requirements and safety provisions i.e., as per theCentral/State Electricity Acts and Rules etc. The CONTRACTORwill ensure that his equipment and Electrical Wiring etc., areinstalled, modified, maintained by a licensedElectrician/Supervisor. A test certificate is to be produced to theENGINEER-IN-CHARGE for his approval, before power is madeavailable.2.4.3 At all times, IEA regulations shall be followed failing which theEMPLOYER has a right to disconnect the power supply withoutany reference to the CONTRACTOR. No claim shall beentertained for such disconnection by theENGINEER-IN-CHARGE. Power supply will be reconnected onlyafter production of fresh certificate from authorized electricalsupervisors.2.4.4 The EMPLOYER is not liable for any loss or damage to theCONTRACTOR's equipment as a result of variation in voltage orfrequency or interruption in power supply or other loss to theCONTRACTOR arising therefrom.5

General Conditions of Contract2.4.5 The CONTRACTOR shall ensure that the Electrical equipmentinstalled by him are such that average power factors does not fallbelow 0.90 at his premises. In case power factor falls below 0.90in any month, he will reimburse to the EMPLOYER at the penalrate determined by the EMPLOYER for all units consumed duringthe month.2.4.6 The power supply required for CONTRACTOR's colony near theplant site will be determined by the EMPLOYER and shall be asper State Electricity Board's Rules and other statutory provisionsapplicable for such installations from time to time. In case ofpower supply to CONTRACTOR's colony, the power will be madeavailable at a single point and the CONTRACTOR shall make hisown arrangement at his own cost for distribution to the occupantsof the colony as per Electricity Rules and Acts. The site andcolony shall be sufficiently illuminated to avoid accidents.2.4.7 The CONTRACTOR will have to provide and install his own lightsand power meters which will be governed as per Central/StateGovernment Electricity Rules. The metres shall be sealed by theEMPLOYER.2.4.8 In case of damage of any of the EMPLOYER’s equipment onaccount of fault, intentional or unintentional on the part of theCONTRACTOR, the EMPLOYER reserves the right to recover thecost of such damage from the CONTRACTOR's bill. Cost of HRCFuses replaced at the EMPLOYER's terminals due to any fault inthe CONTRACTOR's installation shall be to CONTRACTOR'saccount at the rates decided by the ENGINEER-IN-CHARGE.2.4.9 Only motors upto 3 HP will be allowed to be started direct on line.For motors above 3 HP and upto 100 HP a suitable Startingdevice approved by the ENGINEER- IN-CHARGE shall beprovided by the CONTRACTOR. For motors above 100 HPslipring induction motors with suitable starting devices as approvedby the ENGINEER- IN-CHARGE shall be provided by theCONTRACTOR.2.4.10 The CONTRACTOR shall ensure at his cost that all electrical linesand equipment and all installations are approved by the StateElectricity Inspector before power can be supplied to theEMPLOYER.2.4.11 The total requirement of power shall be indicated by the tendereralongwith his tender.2.5 Land for Contractor’s Field Office, Godown and Workshop: TheEMPLOYER will, at his own discretion and convenience and forthe duration of the execution of the work make available near thesite, land for construction of CONTRACTOR's Temporary FieldOffice, godowns workshops and assembly yard required for theexecution of the CONTRACT. The CONTRACTOR shall at hisown cost construct all these temporary buildings and providesuitable water supply and sanitary arrangement and get the sameapproved by the ENGINEER-IN-CHARGE.On completion of the works undertaken by the CONTRACTOR,he shall remove all temporary works erected by him and have theSITE cleaned as directed by ENGINEER-IN-CHARGE. If the6

General Conditions of Contract2.4.5 The CONTRACTOR shall ensure that the Electrical equipmentinstalled by him are such that average power factors does not fallbelow 0.90 at his premises. In case power factor falls below 0.90in any month, he will reimburse to the EMPLOYER at the penalrate determined by the EMPLOYER for all units consumed duringthe month.2.4.6 The power supply required for CONTRACTOR's colony near theplant site will be determined by the EMPLOYER and shall be asper State Electricity Board's Rules and other statutory provisionsapplicable for such installations from time to time. In case ofpower supply to CONTRACTOR's colony, the power will be madeavailable at a single point and the CONTRACTOR shall make hisown arrangement at his own cost for distribution to the occupantsof the colony as per Electricity Rules and Acts. The site andcolony shall be sufficiently illuminated to avoid accidents.2.4.7 The CONTRACTOR will have to provide and install his own lightsand power meters which will be governed as per Central/StateGovernment Electricity Rules. The metres shall be sealed by theEMPLOYER.2.4.8 In case of damage of any of the EMPLOYER’s equipment onaccount of fault, intentional or unintentional on the part of theCONTRACTOR, the EMPLOYER reserves the right to recover thecost of such damage from the CONTRACTOR's bill. Cost of HRCFuses replaced at the EMPLOYER's terminals due to any fault inthe CONTRACTOR's installation shall be to CONTRACTOR'saccount at the rates decided by the ENGINEER-IN-CHARGE.2.4.9 Only motors upto 3 HP will be allowed to be started direct on line.For motors above 3 HP and upto 100 HP a suitable Startingdevice approved by the ENGINEER- IN-CHARGE shall beprovided by the CONTRACTOR. For motors above 100 HPslipring induction motors with suitable starting devices as approvedby the ENGINEER- IN-CHARGE shall be provided by theCONTRACTOR.2.4.10 The CONTRACTOR shall ensure at his cost that all electrical linesand equipment and all installations are approved by the StateElectricity Inspector before power can be supplied to theEMPLOYER.2.4.11 The total requirement of power shall be indicated by the tendereralongwith his tender.2.5 Land for Contractor’s Field Office, Godown and Workshop: TheEMPLOYER will, at his own discretion and convenience and forthe duration of the execution of the work make available near thesite, land for construction of CONTRACTOR's Temporary FieldOffice, godowns workshops and assembly yard required for theexecution of the CONTRACT. The CONTRACTOR shall at hisown cost construct all these temporary buildings and providesuitable water supply and sanitary arrangement and get the sameapproved by the ENGINEER-IN-CHARGE.On completion of the works undertaken by the CONTRACTOR,he shall remove all temporary works erected by him and have theSITE cleaned as directed by ENGINEER-IN-CHARGE. If the6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!