11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

General Conditions of Contractcommence execution of work at site(s), in accordance with theagreed Time Schedule of Completion of Work. "MOBILISATION"shall be considered to have been achieved, if the CONTRACTORis able to establish infrastructure as per Time Schedule, where sowarranted in accordance with agreed schedule of workimplementation to the satisfaction of ENGINEER-IN-CHARGE/EMPLOYER.1.1.32 "COMMISSIONING" shall mean pressing into service of thesystem including the plant(s), equipment(s), vessel(s), pipeline,machinery(ies), or any other section or sub-section ofinstallation(s) pertaining to the work of the CONTRACTOR aftersuccessful testing and trial runs of the same."COMMISSIONING" can be either for a completed system or apart of system of a combination of systems or sub-systems andcan be performed in any sequence as desired by EMPLOYER andin a manner established to be made suited according to availabilityof pre-requisites. Any such readjustments made by EMPLOYERin performance of "COMMISSIONING" activity will not beconstrued to be violating CONTRACT provisions andCONTRACTOR shall be deemed to have provided for the same.SECTION-II GENERAL IN<strong>FOR</strong>MATION2. General Information 2.1 a) Location of Site: The proposed location of Project site is definedin the Special Conditions of Contract.b) Access by Road: CONTRACTOR, if necessary, shall buildother temporary access roads to the actual site of construction forhis own work at his own cost. The CONTRACTOR shall berequired to permit the use of the roads so constructed by him forvehicles of any other parties who may be engaged on the projectsite. The CONTRACTOR shall also facilitate the construction ofthe permanent roads should the construction there of start whilehe is engaged on this work. He shall make allowance in histender for any inconvenience he anticipates on such account.Non-availability of access roads, railway siding and railwaywagons for the use of the CONTRACTOR shall in no casecondone any delay in the execution of WORK nor be the cause forany claim for compensation against the EMPLOYER.2.2 Scope of Work: The scope of WORK is defined in the TechnicalPart of the tender document. The CONTRACTOR shall provideall necessary materials, equipment, labour etc. for the executionand maintenance of the WORK till completion unless otherwisementioned in the Tender Document.2.3 Water Supply: Contractor will have to make his own arrangementsfor supply of water to his labour camps and for works. All pumpinginstallations, pipe net work and distribution system will have to becarried out by the Contractor at his own risk and cost.Alternatively the Employer at his discretion may endeavour toprovide water to the Contractor at the Employer's source of supply4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!