11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

General Conditions of ContractIn addition to the above, the CONTRACTOR shallabide by the safety code provision as per C.P.W.D.Safety code and <strong>India</strong>n Standard Safety Code fromtime to time.117 Care in handling inflammablegas:118 Temporary combustiblestructures:117.1 The CONTRACTOR has to ensure all precautionarymeasures and exercise utmost care in handling theinflammable gas cylinder/inflammable liquids/paints etc. asrequired under the law and/or as advised by the fireAuthorities of the EMPLOYER.118.1 Temporary combustible structures will not be built near oraround work site.119 Precautions against fire: 119.1 The CONTRACTOR will have to provide FireExtinguishers, Fire Buckets and drums at worksite asrecommended by ENGINEER-IN-CHARGE. They will haveto ensure all precautionary measures and exercise utmostcare in handling the inflammable gas cylinders/inflammable liquid/ paints etc. as advised byENGINEER-IN-CHARGE. Temporary combustiblestructures will not be built near or around the work-site.120 Explosives: 120.1 Explosives shall not be stored or used on the WORK or onthe SITE by the CONTRACTOR without the permission ofthe ENGINEER-IN-CHARGE in writing and then only in themanner and to the extent to which such permission isgiven. When explosives are required for the WORK theywill be stored in a special magazine to be provided at thecost of the CONTRACTOR in accordance with theExplosives Rules. The CONTRACTOR shall obtain thenecessary licence for the storage and the use of explosivesand all operations in which or for which explosives areemployed shall be at sole risk and responsibility of theCONTRACTOR and the CONTRACTOR shall indemnifythe EMPLOYER against any loss or damage resultingdirectly or indirectly therefrom.121 Mines act: 121.1 SAFETY CODE: The CONTRACTOR shall at his ownexpense arrange for the safety provisions as required bythe ENGINEER-IN-CHARGE in respect of all labourdirectly employed for performance of the WORKS andshall provide all facilities in connection therewith. In casethe CONTRACTOR fails to make arrangements andprovides necessary facilities as aforesaid, theENGINEER-IN- CHARGE shall be entitled to do so andrecover the costs thereof from the CONTRACTOR.121.2 Failure to comply with Safety Code or the provisionsrelating to report on accidents and to grant of maternitybenefits to female workers shall make the CONTRACTORliable to pay Company Liquidated Damages an amount notexceeding Rs.50/- for each default or materially incorrectstatement. The decision of the ENGINEER-IN-CHARGEin such matters based on reports from the InspectingOfficer or from representatives of ENGINEER-IN-CHARGEshall be final and binding and deductions for recovery ofsuch Liquidated Damages may be made from any amountpayable to the CONTRACTOR from all the provisions of72

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!