11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

General Conditions of Contractconditions under which it is applicable and thesame shall be clearly indicated. No part of anymachine or any gear referred to above in thisparagraph shall be loaded beyond safe workingload except for the purpose of testing.e) In case of departmental machine, the safe workingload shall be notified by theENGINEER-IN-CHARGE. As regardsCONTRACTOR's machines, the CONTRACTORshall notify the safe working load of the machineto the ENGINEER-IN-CHARGE whenever hebrings any machinery to SITE of WORK and get itverified by the Engineer concerned.v) Motors, gears, transmission lines, electric wiring andother dangerous parts of hoisting appliances shouldbe provided with efficient safeguards. Hoistingappliances should be provided with such means as toreduce to minimum the accidental descent of theload, adequate precautions should be taken to reducethe minimum risk of any part or parts of a suspendedload becoming accidentally displaced. When workersare employed on electrical installations which arealready energised, insulating mats, wearing apparel,such as gloves, sleeves, and boots as may benecessary should be provided. The workers shall notwear any rings, watches and carry keys or othermaterials which are good conductors of electricity.vi) All scaffolds, ladders and other safety devicesmentioned or described herein shall be maintained insafe conditions and no scaffolds, ladder or equipmentshall be altered or removed while it is in use.Adequate washing facilities should be provided at ornear places of work.vii) These safety provisions should be brought to thenotice of all concerned by displaying on a noticeboard at a prominent place at the work-spot. Theperson responsible for compliance of the safety codeshall be named therein by the CONTRACTOR.viii) To ensure effective enforcement of the rules andregulations relating to safety precautions, thearrangements made by the CONTRACTOR shall beopen to inspection by the Welfare Officer,ENGINEER-IN- CHARGE or safety Engineer of theAdministration or their representatives.ix) Notwithstanding the above clauses there is nothing inthese to exempt the CONTRACTOR for theoperations of any other Act or rules in force in theRepublic of <strong>India</strong>. The work throughout including anytemporary works shall be carried out in such amanner as not to interfere in any way whatsoever withthe traffic on any roads or footpath at the site or in thevicinity thereto or any existing works whether theproperty of the Administration or of a third party.71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!