11.07.2015 Views

Service Contract No 2007 / 147-446 NYANYALI ... - Swaziland

Service Contract No 2007 / 147-446 NYANYALI ... - Swaziland

Service Contract No 2007 / 147-446 NYANYALI ... - Swaziland

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LIST OF TABLESTABLE 1. PUMP AND MOTOR SPECIFICATIONS AND MEASUREMENTS CONDUCTED ON PUMP ...................... - 18 -TABLE 2. SPRINKLER VALUATED BLOCK SUMMARY ........................................................................................... - 25 -TABLE 2.TECHNICAL PROPERTIES OF SPRINKLERS FOUND ON SITE AT 35M OPERATING PRESSURE ................ - 26 -TABLE 4.OPTIMAL OPERATING PRESSURE VS NOZZLE DIAMETER FOR SPRINKLERS ......................................... - 28 -TABLE 5. MAINTENANCE SCHEDULE FOR SPRINKLER IRRIGATION SYSTEMS ..................................................... - 33 -TABLE 6. MAINTENANCE PRACTICES IMPLEMENTED BY <strong>NYANYALI</strong> FARMERS .................................................. - 33 -LIST OF FIGURESFIGURE 1 PUMP HOUSE NEXT TO THE MKONDO RIVER ...................................................................................... - 2 -FIGURE 2 LATERAL ISOLATION VALVES ................................................................................................................ - 3 -FIGURE 3.SAPWAT SCREEN INDICATING WATER REQUIREMENT FOR SPRINKLER IRRIGATION WITH RAINFALLTAKEN INTO ACCOUNT ................................................................................................................................ - 7 -FIGURE 4. REQUIRED RADIUS OF 90 BENDS (SOURCE: ARC (<strong>2007</strong>)) .................................................................. - 11 -FIGURE 5. 2 X 300MM X 45° BENDS ON PUMP SUCTION MANIFOLD ................................................................ - 12 -FIGURE 6. CONCENTRIC AND ECCENTRIC REDUCERS ......................................................................................... - 12 -FIGURE 7. INCORRECTLY DIMENSIONED ECCENTRIC REDUCER ......................................................................... - 13 -FIGURE 8. SPACING AND PLACING OF SUCTION PIPE INLETS............................................................................. - 14 -FIGURE 9. <strong>NYANYALI</strong> INTAKE SUMP ALONG THE CROCODILE INFESTED MKHONDVO RIVER ............................ - 14 -FIGURE 10. MINIMUM WATER DEPTH ABOVE SUCTION PIPE INLET ................................................................. - 15 -FIGURE 11. ATMOSPHERIC PRESSURE VS. HEIGHT ABOVE SEA LEVEL ............................................................... - 17 -FIGURE 12. IRON OXIDE ACCUMULATES IN THE MKHONDVO RIVER ................................................................ - 18 -FIGURE 13. INSIDE <strong>NYANYALI</strong> PUMP HOUSE ...................................................................................................... - 20 -FIGURE 15. LATERAL ISOLATION VALVES ........................................................................................................... - 26 -FIGURE 16. MEASURING APPARATUS FOR SPRINKLER NOZZLE SIZE ................................................................. - 27 -FIGURE 17. <strong>NYANYALI</strong> YIELD IN TONES CANE PER HECTARE .............................................................................. - 31 -LIST OF APPENDICESAppendix 1: SEB usage for river pump station phase 2Appendix 2: capital recovery factors (CRF)Appendix 3: soil map and block layoutAppendix 4: Farm BoundariesNyanyali Farmers Cooperative Report - 2009Page vi

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!