11.07.2015 Views

Service Contract No 2007 / 147-446 NYANYALI ... - Swaziland

Service Contract No 2007 / 147-446 NYANYALI ... - Swaziland

Service Contract No 2007 / 147-446 NYANYALI ... - Swaziland

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EAC COMPUTATION MATRIXThese costs have been calculated only for Phase Two of theProjectITEM COST ITEM Main Bid1 Infield irrigationCapital cost (E) -Useful life (years) 10Annual maintenance (%) 3EAC of infield irrigation (E) -2 Distribution systemCapital cost (E) -Useful life (years) 20Annual maintenance (%) 2EAC of Distribution system (E) -3 Pumping plantCapital cost (E) -Useful life (years) 15Annual maintenance (%) 1EAC of Pumping plant (E) -4 FiltersCapital cost (E) -Useful life (years) 15Annual maintenance (%) 3EAC of Filters (E) -5 Annual Energy Cost (E) 111,466.06Total EAC (E) -Energy cost as a % of total EAC#DIV/0!For sprinkler irrigation a 40% EAC value is accepted. A higher and a lower figure indicatesover design and under design respectivelyNyanyali Farmers Cooperative Report - 2009 Page - 23 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!