‣ The Motor Control Centres (MCC) is well designed and still in good working condition.Figure 2 Lateral isolation valves‣ This project was developed on only two soil sets, the W and the B soil sets. Under thesesets there are various soil sets and different irrigation regimes may be applied to differentareas of the farm.Nyanyali Farmers Cooperative Report - 2009 Page - 3 -