11.07.2015 Views

2010 Report - Pennsylvania Public Utility Commission

2010 Report - Pennsylvania Public Utility Commission

2010 Report - Pennsylvania Public Utility Commission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NERC establishes criteria, standards and requirements for its members and all control areas. Allcontrol areas must operate in a manner such that system instability, uncontrolled system separationand cascading outages will not occur as a result of the most severe single contingency.As of Dec. 31, 2009, NERC had 1,950 active violations, the majority of which were being assessedand validated; others were in settlement negotiations, or were being addressed in a Notice ofPenalty filing with FERC. During 2009, NERC filed 221 enforcement actions with FERC.Enforcement actions are designed to ensure and improve bulk power system reliability bymitigating risk; ensuring transparent, efficient and fair processing; and communicating lessonslearned to the industry. 11NERC defines the bulk electric system as follows:As defined by the Regional Reliability Organization, the electrical generationresources, transmission lines, interconnections with neighboring systems, andassociated equipment, generally operated at voltages of 100 kV or higher. Radialtransmission facilities serving only load with one transmission source are generallynot included in this definition. 12On March 18, <strong>2010</strong>, FERC issued a Notice of Proposed Rulemaking 13 directing NERC to includeall electric transmission facilities of 100,000 volts (100 kV) or more in its definition of whatconstitutes the “bulk electric system” subject to mandatory reliability standards under the EnergyPolicy Act of 2005. The proposal is intended to eliminate the discretion that regional entities haveto define the transmission facilities that comprise their “bulk electric systems,” but allow regionalcouncils to seek NERC and FERC approval if they wish to make variations from the 100 kVstandard. FERC notes that there is a strong technical justification for a standard 100 kV threshold,pointing out that facilities rated at 115 kV and 138 kV have either caused or contributed tosignificant bulk electric system disturbances and cascading outages. FERC has determined that thedefinition needs to be modified in order to protect the reliability of the Nation’s Bulk-PowerSystem.Figure 1 provides a map of the eight NERC Regions.11 NERC, Annual <strong>Report</strong> 2009, May <strong>2010</strong>.12 “Glossary of Terms Used in Reliability Standards,” adopted by NERC Board of Trustees: Feb. 12, 2008.13 Docket No. RM09-18-000.Electric Power Outlook for <strong>Pennsylvania</strong> 2009-2014 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!