11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

site will be determined by the EMPLOYER and shall be as per StateElectricity Board's Rules and other statutory provisions applicable forsuch installations from time to time. In case of power supply toCONTRACTOR's colony, the power will be made available at a singlepoint and the CONTRACTOR shall make his own arrangement at hisown cost for distribution to the occupants of the colony as perElectricity Rules and Acts. The site and colony shall be sufficientlyilluminated to avoid accidents.2.4.7 The CONTRACTOR will have to provide and install his own lights andpower meters which will be governed as per Central/State GovernmentElectricity Rules. The metres shall be sealed by the EMPLOYER.2.4.8 In case of damage of any of the EMPLOYER’s equipment on accountof fault, intentional or unintentional on the part of the CONTRACTOR,the EMPLOYER reserves the right to recover the cost of such damagefrom the CONTRACTOR's bill. Cost of HRC Fuses replaced at theEMPLOYER's terminals due to any fault in the CONTRACTOR'sinstallation shall be to CONTRACTOR's account at the rates decidedby the ENGINEER-IN-CHARGE.2.4.9 Only motors upto 3 HP will be allowed to be started direct on line. Formotors above 3 HP and upto 100 HP a suitable Starting deviceapproved by the ENGINEER- IN-CHARGE shall be provided by theCONTRACTOR. For motors above 100 HP slipring induction motorswith suitable starting devices as approved by the ENGINEER-IN-CHARGE shall be provided by the CONTRACTOR.2.4.10 The CONTRACTOR shall ensure at his cost that all electrical lines andequipment and all installations are approved by the State ElectricityInspector before power can be supplied to the EMPLOYER.2.4.11 The total requirement of power shall be indicated by the tendereralongwith his tender.2.5 Land for Contractor’s Field Office, Godown and Workshop: TheEMPLOYER will, at his own discretion and convenience and for theduration of the execution of the work make available near the site, land forconstruction of CONTRACTOR's Temporary Field Office, godownsworkshops and assembly yard required for the execution of theCONTRACT. The CONTRACTOR shall at his own cost construct all thesetemporary buildings and provide suitable water supply and sanitaryarrangement and get the same approved by the ENGINEER-IN-CHARGE.On completion of the works undertaken by the CONTRACTOR, he shallremove all temporary works erected by him and have the SITE cleaned asdirected by ENGINEER-IN-CHARGE. If the CONTRACTOR shall fail tocomply with these requirements, the ENGINEER-IN-CHARGE may at heexpenses of the CONTRACTOR remove such surplus, and rubbishmaterials and dispose off the same as he deems fit and get the site clearedas aforesaid; and CONTRACTOR shall forthwith pay the amount of allexpenses so incurred and shall have no claim in respect of any suchsurplus materials disposed off as aforesaid. But the EMPLOYER reservesthe right to ask the CONTRACTOR any time during the pendency of theCONTRACT to vacate the land by giving 7 days notice on security reasonsor on national interest or otherwise. Rent may be charged for the land sooccupied from contractor by the Employer.The CONTRACTOR shall put up temporary structures as required by themfor their office, fabrication shop and construction stores only in the area

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!