11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMPLOYER and the CONTRACTOR for the execution of the worksincluding therein all contract documents.1.1.11 The "SPECIFICATION" shall mean all directions the various technicalspecifications, provisions attached and referred to the TenderDocuments which pertain to the method and manner of performing thework or works to the quantities and qualities of the work or works andthe materials to be furnished under the CONTRACT for the work orworks, as may be amplified or modified by the <strong>GAIL</strong> orENGINEER-IN-CHARGE during the performance of CONTRACT inorder to provide the unforseen conditions or in the best interests of thework or works. It shall also include the latest edition of relevantStandard Specifications including all addenda/corrigenda publishedbefore entering into CONTRACT.1.1.12 The "DRAWINGS" shall include maps, plans and tracings or prints orsketches thereof with any modifications approved in writing by theENGINEER- IN-CHARGE and such other drawing as may, from timeto time, be furnished or approved in writing by theENGINEER-IN-CHARGE.1.1.13 The "TENDER" means the proposal along with supporting documentssubmitted by the CONTRACTOR for consideration by theEMPLOYER.1.1.14 The "CHANGE ORDER" means an order given in writing by theENGINEER-IN-CHARGE to effect additions to or deletion from andalteration in the works.1.1.15 The "COMPLETION CERTIFICATE" shall mean the certificate to beissued by the ENGINEER-IN-CHARGE when the works have beencompleted entirely in accordance with CONTRACT DOCUMENT to hissatisfaction.1.1.16 The "FINAL CERTIFICATE" in relation to a work means the certificateregarding the satisfactory compliance of various provision of theCONTRACT by the CONTRACTOR issued by the ENGINEER-IN-CHARGE/EMPLOYER after the period of liability is over.1.1.17 “DEFECT LIABILITY PERIOD” in relation to a work means thespecified period from the date of COMPLETION CERTIFICATE uptothe date of issue of FINAL CERTIFICATE during which theCONTRACTOR stands responsible for rectifying all defects that mayappear in the works executed by the CONTRACTOR in pursuance ofthe CONTRACT and includes warranties againstManufacturing/Fabrication/ Erection/Construction defects covering allmaterials plants, equipment, components, and the like supplied by theCONTRACTOR, works executed against workmanship defects.1.1.18 The "APPOINTING AUTHORITY" for the purpose of arbitration shallbe the CHAIRMAN and MANAGING DIRECTOR or any other personso designated by the EMPLOYER.1.1.19 "TEMPORARY WORKS" shall mean all temporary works of every kindrequired in or about the execution, completion or maintenance ofworks.1.1.20 "PLANS" shall mean all maps, sketches and layouts as areincorporated in the CONTRACT in order to define broadly the scopeand specifications of the work or works, and all reproductions thereof.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!