11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sl.<strong>MECON</strong>’s QueryNo.8. Confirm that you have studied complete BiddingDocument including Technical and commercialpart and your Bid is in accordance with therequirements of the Bidding Document.9. Confirm your compliance to total Scope of Workmentioned in the Bidding Document.10. Confirm your acceptance for `Scope of Supply’as mentioned in Bidding Document.11. Confirm your acceptance for `Time Schedule’ asmentioned in Bidding Document.12. Confirm that your quoted price includesfollowing taxes/ duties, insurance etc.i) All taxes, charges and duties assessed or leviedin respect of profits earned or income receivableby the Contractor by reason of this Contract.ii) All taxes, duties as per applicable for this WORKin accordance with the provision of GeneralConditions of Contract and Special Conditions ofContract.iii) All types of insurance as per the provisions ofGeneral Conditions of Contract and SpecialConditions of Contract.13. Confirm that you have proposed adequateproject/ site organisation with qualifiedsupervisory personnel having requisiteexperience including personnel responsible forsafety, planning stores, QA/ QC etc.14. Confirm that all costs resulting from safeexecution of WORK, such as safety induction,use of protective clothing, safety glasses andhelmet, safety precaution taken duringmonsoon, or any other safety measures to beundertaken by the Contractor for execution ofwork are included in the quoted rates.15. Confirm the following :i) The planning schedule, manpower estimates,construction equipment deployment scheduleetc., submitted by the bidder with his Bid, areindicative and shall not be basis for extracompensation in case actual needs are higher.Bidder’s Reply/ Confirmationii) Detailed planning schedule developed byCONTRACTOR after contract award may besubject to fluctuations depending upon actualprogress of the project and available work front.iii) Co-ordination and making available byContractor of all staff, manpower, constructionequipment, tools, cranes, etc. and materials are\\Rajesh\RAJESH\Cavery\Tender\Construction Tender-Vol - I of II.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!