11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

COMMERCIAL QUESTIONNAIRENote:1) The Bidder shall submit reply to each query.2) The bidder’s reply/ confirmation as furnished in the Commercial Questionnaire (CQ) shallsupercede the stipulation mentioned else where in the Bid.Sl.<strong>MECON</strong>’s QueryNo.1. Confirm that your Bid is valid for 1(one) monthfrom the last date of submission of Bid.2. Confirm that all details in unpriced part havebeen submitted in 5 copies (1 Original + 4copies). Bidding Document and drawings,signed and stamped on each page shall besubmitted in original.3. Confirm that the following documents aresubmitted with Part-I :i) All documents in relevant Section as per CHECKLISTii) Schedule of Rates/ Prices without specifying therates/ prices are submitted in unpriced part,exactly as per the priced portion submitted inPart-II. In case some of items have not beenquoted, such items should be identified in blankprice format.iii) Addendum duly signed and stamped on eachpage as a token of acceptance (applicable ifissued).iv) Confirm Acceptance of Labour rates submittedas per Annexure-11 of SCC.4. Confirm that price has been submitted in 1ORIGINAL only in a separately sealed envelopesuperscribing “PRICE PART”5. Rates/ amount must be filled in format for`Schedule of Rates’ enclosed as part of BiddingDocument. If quoted in separate typed sheetsand any variation in item description, unit orquantity is noticed, the bid is liable to berejected. In any case, Bidder shall be presumedto have quoted against the tendered descriptionof work and the same shall be binding on theBidder. Please confirm.6. Confirm that deviation/ terms & conditions arenot mentioned in the price part. In case anyterms and condition is mentioned in the pricepart, the same shall be treated as null and void.7. Confirm that correction fluid is not used in theprice part. (In case of any correction, the sameshall be signed and stamped by authorisedsignatory).Bidder’s Reply/ Confirmation\\Rajesh\RAJESH\Cavery\Tender\Construction Tender-Vol - I of II.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!