11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EVALUATION /COMPARISON OF BIDS1.0 The Employer/ <strong>MECON</strong> will examine the bids to determine whether the bids arecomplete as per Check List, Stamped and Signed on each page and are in order.2.0 EARNEST MONEY DEPOSITThe bids without requisite EMD and/ or EMD not in the prescribed proforma will not beconsidered and bids of such bidders shall be rejected.3.0 DEVIATION TO STIPULATIONS“It may be note that since this is zero deviation tender the bidder is advisedto quote strictly as per terms & conditions of tender document & not tostipulate any deviation/ exception. Offers requesting deviation shall not beamended for further evaluation & shall be summarily rejected”.4.0 CONFORMANCE TO SCOPE OF WORKBidder will be required to confirm to the Scope of Work as mentioned under Annexure-Ito SCC, Schedule of Rates and Job Specification/ Technical Specifications.5.0 CONFORMANCE TO SCOPE OF SUPPLYBidder will be required to confirm to the Scope of Supply as mentioned under Annexure-II to SCC, Schedule of Rates and Jobs Specification/ Technical Specifications.6.0 DETERMINATION OF RESPONSIVENESSThe bid submitted by the bidder should be responsive to the requirements of theBidding Document. A responsive bid is one which conforms to the terms, conditions andspecifications of the Bidding Document and Bid Evaluation Criteria without Deviation.7.0 Bidders are advised to quote strictly as per terms and conditions of the BiddingDocument and not to stipulate any deviation/ exception as it is “No Deviation” tender.Offers with any Exception/ deviation shall be liable for rejection.8.0 Bidder will be required to establish upto the satisfaction of Owner/ <strong>MECON</strong> that theresources proposed to be deployed in Annexure 8 & 9 of SCC by the bidder are inconformity with the WORK REQUIREMENT.The following requirement must be noted while submitting the resource deploymentdetails.i) Construction EquipmentsMechanised type of construction equipments should be considered. All requisiteequipments such as cranes, diesel generators, compressors, welding m/cs,pumps, tractor-trailor, etc. shall be considered. Deployment of minimumequipments must be furnished as per Annexure-9 to SCC.\\Rajesh\RAJESH\Cavery\Tender\Construction Tender-Vol - I of II.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!