11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

33.2 The domestic value addition shall be calculated with the following formula:{P EW (excluding CD,ST,ED) – CIF 1 }------------------------------------------- x 100{P EW (excluding CD,ST,ED)}Where P EW = Ex-Works PriceCD = Custom DutyST = Sales TaxED = Excise Duty andCIF 1 = CIF Value of Imports(In above formula the CVD shall not be considered in customs duty due to adjustmentunder CENVAT)33.3 Once quoted the extent of Domestic Value addition shall remain unaltered.33.4 Domestic Bidder shall furnish details of equipment/ Items, applicable Central Sales Taxrate without Form `C’ alongwith the corresponding amount.33.5 The Sales Tax amount indicated by the Bidder as included in the prices, shall be paid by<strong>GAIL</strong> against documentary evidence only.In case the Bidder is not able to produce documentary evidence for full value of thesales tax, the payment shall be limited to the value for which documentary evidence isfurnished.34. Purchase Preference34.1 Purchase Preference to Central Government Public Sector Undertakings shall be allowedas per government guidelines in vogue.35. Compensation for extended stay35.1 In the event of the time of completion of work getting delayed beyond the timeschedule indicated in the bidding document plus a grace period due to reasons solelyattributable to Employer, the Contractor shall be paid compensation for extended stay(ESC) to maintain necessary organisational setup and construction tools, tackles,equipments etc. at site of work. The grace period for such purpose shall be 1/5 th of thetime schedule (taken as number of weeks) or 8 weeks whichever is more.35.2 The bidder is required to specify the rate for ESC on per week basis in the “PRICE PART”of his bid, which shall be considered for loading on total quoted price during price bidevaluation. Tloading shall be done for a period of 1/4 th of the time schedule (taken asnumber of weeks) or 12 weeks whichever is less. In case bidder does not indicate therate for ESC in price part of his bid, it will be construed that no ESC is required by thebidder.35.3 While calculating 1/5 th of the time schedule as grace period and 1/4 th of the timeschedule for ev alautionk, the figure will be rounded –off to the next higher digit.\\Rajesh\RAJESH\Cavery\Tender\Construction Tender-Vol - I of II.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!