GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED GAIL (India) Limited MECON LIMITED

gailonline.com
from gailonline.com More from this publisher
11.07.2015 Views

(g)a copy of the Joint Venture / Consortium Agreement entered into by all partners/members shall be submitted with the bid. Alternatively, a Letter of Intent toexecute a Joint Venture / Consortium Agreement in the event of a successful bidshall be signed by all partners/members and submitted with the bid, togetherwith a copy of the proposed agreement.5. One Bid per Bidder5.1 A firm shall submit only one bid in the same bidding process, either individually as abidder or as a partner in a joint venture or as a member of consortium. No firm can bea subcontractor while submitting a bid individually or as a partner of a joint venture oras a member of a consortium in the same bidding process. A firm, if acting in thecapacity of subcontractor in any bid, may participate in more than one bid, but only inthat capacity. A bidder who submits or participates in more than one bid will cause allthe proposals in which the bidder has participated to be disqualified.6. Cost of Bidding6.1 The bidder shall bear all costs associated with the preparation and submission of thebid, and GAIL will in no case, be responsible or liable for these costs, regardless of theconduct or outcome of the bidding process.7. Site Visit7.1 The bidder is advised to visit and examine the Site of Works and its surroundings andobtain for itself on its own responsibility all information that may be necessary forpreparing the bid and entering into a contract for construction of the Works. The costsof visiting the Site shall be at the bidder’s own expense.7.2 The bidder and any of its personnel or agents will be granted permission by theEmployer to enter upon its premises and lands for the purpose of such visit, but onlyupon the express condition that the bidder, its personnel, and agents will release andindemnify the Employer and its personnel and agents from and against all liability inrespect thereof, and will be responsible for death or personal injury, loss of or damageto property, and any other loss, damage, costs, and expenses incurred as a result of theinspection.7.3 The Employer may conduct a Site visit concurrently with the pre-bid meeting.B. BIDDING DOCUMENTS8. Content of Bidding Document8.1 The Bidding Documents/ Tender Documents are those stated below and should be readin conjunction with any addenda issued in accordance with ITB Clause 10.PART-A 1) Invitation for Bid (IFB)2) Acknowledgement-cum-consent Letter3) Submission of BidPART-B 1) Instruction to Bidder (ITB)2) Annexures to ITB\\Rajesh\RAJESH\Cavery\Tender\Construction Tender-Vol - I of II.doc

• Annexure-I : Bid Evaluation Criteria• Annexure-II : List of Formats• Annexure-III : Commercial Questionnaire• Annexure-IV : Check ListPART-C 1) General Conditions of Contract (GCC)2) Annexure to GCC• Annexure-I : Proforma of Indemnity Bond for supply ofMaterials by Employer• Annexure-II : Proforma for Contract AgreementPART-D 1) Special Conditions of Contract (SCC) - Technical2) Annexures to SCC (Technical)• Annexure-1 : Scope of Work• Annexure-2 : Scope of Supply• Annexure-3 : Time Schedule• Annexure-4 : Measurement Work• Annexure-5 : Terms of Payment• Annexure-6 : Specification for Quality Assurance Systemrequirements from Bidders• Annexure-7 : Specification for Health, Safety and Environment(HSE) management• Annexure-8 : Conditions for issue & reconciliation of material• Annexure-9 : Minimum no. of major equipment• Annexure-10 : Minimum no. of skilled labour to be deployed• Annexure-11 : Schedule of Labour Rate• Annexure-12 : Schedule of Equipment Rate• Annexure-13 : Advance security format3) Particular Job Specification• Appendix – I to Particular Job Specifications4) Annexures to Particular Job Specification• Annexure-I : Technical Input for Civil & Structural Works• Annexure-II : Technical Input for Electrical Works• Annexure-III : Technical Input for Instrumentation WorksPART-E 1) Special Conditions of Contract (SCC) - Commercial2) Annexures to SCC (Commercial) – if anyPART-FSchedule of Rate (SOR)8.2 The bidder is expected to examine all instructions, forms, terms and specifications in thebidding documents. The Invitation for Bids (IFB) together with all its attachmentsthereto, shall be considered to be read, understood and accepted by the bidders. Failureto furnish all information required by the bidding documents or submission of a bid notsubstantially responsive to the bidding documents in every respect will be at bidder’srisk and may result in the rejection of his bid.\\Rajesh\RAJESH\Cavery\Tender\Construction Tender-Vol - I of II.doc

(g)a copy of the Joint Venture / Consortium Agreement entered into by all partners/members shall be submitted with the bid. Alternatively, a Letter of Intent toexecute a Joint Venture / Consortium Agreement in the event of a successful bidshall be signed by all partners/members and submitted with the bid, togetherwith a copy of the proposed agreement.5. One Bid per Bidder5.1 A firm shall submit only one bid in the same bidding process, either individually as abidder or as a partner in a joint venture or as a member of consortium. No firm can bea subcontractor while submitting a bid individually or as a partner of a joint venture oras a member of a consortium in the same bidding process. A firm, if acting in thecapacity of subcontractor in any bid, may participate in more than one bid, but only inthat capacity. A bidder who submits or participates in more than one bid will cause allthe proposals in which the bidder has participated to be disqualified.6. Cost of Bidding6.1 The bidder shall bear all costs associated with the preparation and submission of thebid, and <strong>GAIL</strong> will in no case, be responsible or liable for these costs, regardless of theconduct or outcome of the bidding process.7. Site Visit7.1 The bidder is advised to visit and examine the Site of Works and its surroundings andobtain for itself on its own responsibility all information that may be necessary forpreparing the bid and entering into a contract for construction of the Works. The costsof visiting the Site shall be at the bidder’s own expense.7.2 The bidder and any of its personnel or agents will be granted permission by theEmployer to enter upon its premises and lands for the purpose of such visit, but onlyupon the express condition that the bidder, its personnel, and agents will release andindemnify the Employer and its personnel and agents from and against all liability inrespect thereof, and will be responsible for death or personal injury, loss of or damageto property, and any other loss, damage, costs, and expenses incurred as a result of theinspection.7.3 The Employer may conduct a Site visit concurrently with the pre-bid meeting.B. BIDDING DOCUMENTS8. Content of Bidding Document8.1 The Bidding Documents/ Tender Documents are those stated below and should be readin conjunction with any addenda issued in accordance with ITB Clause 10.PART-A 1) Invitation for Bid (IFB)2) Acknowledgement-cum-consent Letter3) Submission of BidPART-B 1) Instruction to Bidder (ITB)2) Annexures to ITB\\Rajesh\RAJESH\Cavery\Tender\Construction Tender-Vol - I of II.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!