and if paid by the EMPLOYER shall be recoverable from theCONTRACTOR.123 Outbreak of infectiousdiseases:123.1 The CONTRACTOR shall remove from his camp such labour andtheir facilities who refuse protective inoculation and vaccinationwhen called upon to do so by the ENGINEER-IN-CHARGE'srepresentative. Should Cholera, Plague or other infectiousdiseases break out the CONTRACTOR shall burn the huts,beddings, clothes and other belongings or used by the infectedparties and promptly erect new huts on healthy sites as required bythe ENGINEER-IN-CHARGE failing which within the time specifiedin the Engineer's requisition, the work may be done by theEMPLOYER and the cost thereof recovered from theCONTRACTOR.124 Use of intoxicants: 124.1 The unauthorised sale of spirits or other intoxicants, beveragesupon the work in any of the buildings, encampments or tenementsowned, occupied by or within the control of the CONTRACTOR orany of his employee is forbidden and the CONTRACTOR shallexercise his influence and authority to the utmost extent to securestrict compliance with this condition.In addition to the above, the CONTRACTOR shall abide by thesafety code provision as per C.P.W.D. safety code and <strong>India</strong>nStandard Code framed from time to time.
PROFORMA OF INDEMNITY BOND FOR SUPPLY OF MATERIALS BY EMPLOYER(To be executed on non-judicial stamped paper of appropriate value)WHEREAS <strong>GAIL</strong> (INDIA) LTD. (hereinafter referred to as <strong>GAIL</strong>) which expression shall unless repugnant to thecontext includes their legal representatives, successors and assigns having their registered office at 16, Bhikaiji CamaPlace; R.K.Puram New Delhi has entered into a CONTRACT with ______________________ (hereinafter referred to asthe CONTRACTOR which expression shall unless repugnant to the context include their legal representatives,successors and assigns) for ____________________on the terms and conditions as set out, inter-alia, in theCONTRACT No................. Dated............. and various documents forming part thereof hereinafter collectively referredto as the "CONTRACT" which expression shall include all amendments, modifications and/or variations thereto.AND WHEREASi) <strong>GAIL</strong> has agreed to supply to the CONTRACTOR, equipment, plants and materials (finished, semi-finishedand raw)for the purpose of EXECUTION of the said CONTRACT by the CONTRACTOR (the equipment,plants and materials to be supplied by <strong>GAIL</strong> to the CONTRACTOR, hereinafter for the sake of brevity referredto as the "said materials") and pending execution by the CONTRACTOR of the CONTRACT incorporating thesaid materials, the said materials shall be under the custody and charge of the CONTRACTOR and shall bekept, stored, altered, worked upon and/or fabricated at the sole risk and expense of the CONTRACTOR.ii)As a pre-condition to the supply of the said materials by <strong>GAIL</strong> to the CONTRACTOR, <strong>GAIL</strong> has required theCONTRACTOR to furnish to <strong>GAIL</strong> an Indemnity Bond in the manner and upon terms and conditionshereinafter indicated.NOW, THEREFORE, in consideration of the premises aforesaid the CONTRACTOR hereby irrevocably andunconditionally undertakes to indemnify and keep indemnified <strong>GAIL</strong> from and against all loss, damage anddestruction (inclusive but not limited to any or all loss or damage or destruction to or of the said materials orany item or part thereof by theft, pilferage, fire, flood, storm, tempest, lightning, explosion, storage, chemical orphysical action or reaction, binding, warping, exposure, rusting, faulty workmanship, faulty fabrication, orfaulty method or technique of fabrication, strike, riot, civil commotion, or other act or omission or commissionwhatsoever within or beyond the control of the CONTRACTOR, misuse and misappropriation (inclusive butnot limited to the misuse or misappropriation by the CONTRACTOR and the Contractor's servants and/oragents) whatsoever to, or of in the said materials or any part of them thereof from the date that the same orrelative part of item thereof was supplied to the CONTRACTOR upto and until the date of return to <strong>GAIL</strong> ofthe said materials or relative part of item thereof or completed fabricated works(s) incorporating the saidmaterial and undertake to pay to <strong>GAIL</strong> forthwith on demand in writing without protest or demur the value asspecified by <strong>GAIL</strong> of the said material or item or part thereof, lost, damaged, destroyed, misused and/ormisappropriated, as the case may be or, together with <strong>GAIL</strong>'S costs and expenses (inclusive of but not limitedto handling, transportation, cartage, insurance, freight, packing and inspection costs/or expenses upto) andaggregate limit of Rs._________________________________________________ (Rupees_________________________________________________________________________________________________).AND THE CONTRACTOR hereby agrees with <strong>GAIL</strong> that:i) This Indemnity/Undertaking shall be a continuing Indemnity/ Undertaking and shall remain valid andirrevocable for all claims of <strong>GAIL</strong> arising hereunder upto and until the midnight of________________. However, if the CONTRACT for which this Indemnity/Undertaking is given isnot completed by this date, the CONTRACTOR hereby agrees to extend the Indemnity/Undertakingtill such time as is required to fulfil the CONTRACT.
- Page 1 and 2:
GAIL (India) LimitedTENDER DOCUMENT
- Page 3 and 4:
TABLE OF CONTENTFORVOLUME-I OF IINa
- Page 5 and 6:
\\Rajesh\RAJESH\Cavery\Tender\Const
- Page 7 and 8:
SECTION - IINVITATION FOR BIDS (IFB
- Page 9 and 10:
shall be payable by the bidder at t
- Page 11 and 12:
1.0 BRIEF PROJECT DETAILSBIDDER’S
- Page 13 and 14:
APPENDIX - ACUT-OUT SLIPS (4 NOS. )
- Page 15 and 16:
CUT-OUT SLIP - 2PART - I(UNPRICED B
- Page 17 and 18:
CUT-OUT SLIP - 4PART - III(BID SECU
- Page 19 and 20:
ACKNOWLEDGEMENT CUM CONSENT LETTERT
- Page 21 and 22:
\\Rajesh\RAJESH\Cavery\Tender\Const
- Page 23 and 24:
MEMORANDUM(a) General Description o
- Page 25 and 26:
\\Rajesh\RAJESH\Cavery\Tender\Const
- Page 27 and 28:
INSTRUCTIONS TO BIDDERSNotes on the
- Page 29 and 30:
F. Award of Contract36. Award37. Em
- Page 31 and 32:
minimum 8” NB, ANSI rating of 300
- Page 33 and 34:
• Annexure-I : Bid Evaluation Cri
- Page 35 and 36:
Part-A: Techno-commercial un-priced
- Page 37 and 38:
Statutory variations in excise duty
- Page 39 and 40:
16.9 For Indian Bidders : Indian Go
- Page 41 and 42:
iv)Permanent Income Tax number of A
- Page 43 and 44:
26.2 Priced Bid Opening26.2.1 GAIL/
- Page 45 and 46:
33.2 The domestic value addition sh
- Page 47 and 48:
the bidding documents. The Contract
- Page 49 and 50:
CONTENTSSl.No.Description1) Annexur
- Page 51 and 52:
EVALUATION /COMPARISON OF BIDS1.0 T
- Page 53 and 54:
LIST OF FORMATS{Annexure - II TO In
- Page 55 and 56:
F-1BIDDER’S GENERAL INFORMATIONTo
- Page 57 and 58:
F-2BID FORMToM/s GAIL (India) Limit
- Page 59 and 60:
F-3AFINANCIAL DETAILEACH BIDDER MUS
- Page 61 and 62:
Sheet 2 of 2INSTRUCTIONS FOR FURNIS
- Page 63 and 64:
F-5LETTER OF AUTHORITYPROFORMA FOR
- Page 65 and 66:
F-7CERTIFICATEGAIL India Limited,De
- Page 67 and 68:
F-9PRESENT COMMITMENTS OF THE BIDDE
- Page 69 and 70:
Sheet 2 of 24. The guarantee herein
- Page 71 and 72:
F-12CONSTRUCTION SCHEDULE WITH BAR
- Page 73 and 74:
F-14CONFIRMATION REGARDING SCHEDULE
- Page 75 and 76:
COMMERCIAL QUESTIONNAIRE{Annexure -
- Page 77 and 78:
Sl.MECON’s QueryNo.8. Confirm tha
- Page 79 and 80:
CHECK LIST{Annexure - IV to Instruc
- Page 81 and 82:
(A.3) CHECK LISTThis check list dul
- Page 83 and 84:
(B.12) Confirmation regarding accep
- Page 85 and 86:
(E)CONFIRM THE FOLLOWING REGARDING
- Page 87 and 88:
GENERAL CONDITIONS OF CONTRACTFORPR
- Page 89 and 90:
SECTION-IV (GENERAL OBLIGATIONS)21.
- Page 91 and 92:
equipment, materials, labour etc.iv
- Page 93 and 94:
General Conditions of ContractSecti
- Page 95 and 96:
1.1.21 "SITE" shall mean the lands
- Page 97 and 98:
deducted from the running account b
- Page 99 and 100:
allocated to them on the project si
- Page 101 and 102:
taken as correct.c) When it is not
- Page 103 and 104:
tenders received without assigning
- Page 105 and 106:
17 Award of Contract: 17.1 The Acce
- Page 107 and 108:
herein and CODES referred to. Where
- Page 109 and 110:
the award and the forfeiture of bid
- Page 111 and 112: The decision of the ENGINEER-IN-CHA
- Page 113 and 114: or any other person or persons, or
- Page 115 and 116: een given to him by any person.35 C
- Page 117 and 118: such sub-letting or Subcontracting
- Page 119 and 120: the CONTRACTOR before starting-up t
- Page 121 and 122: y CONTRACTOR pursuant to the provis
- Page 123 and 124: liability of contractor:EMPLOYER, n
- Page 125 and 126: orne by the CONTRACTOR and the EMPL
- Page 127 and 128: above shall, however, not apply for
- Page 129 and 130: 63 Setting out works: 63.1 The ENGI
- Page 131 and 132: of WORK at his own cost. The materi
- Page 133 and 134: EMPLOYER's property and will be dis
- Page 135 and 136: CONTRACTOR shall be liable to pay c
- Page 137 and 138: ) As soon as reasonably practicable
- Page 139 and 140: CONTRACTOR to perform any acts, mat
- Page 141 and 142: v) SCHEDULE OF RATES TO COVER TAXES
- Page 143 and 144: CONTRACT, or any part thereof, in t
- Page 145 and 146: labour and staff colonies are clear
- Page 147 and 148: and duties (E.D. and S.T.) beyond t
- Page 149 and 150: CONTRACTOR shall require the SUB-CO
- Page 151 and 152: EMPLOYER or of a third party during
- Page 153 and 154: CONTRACTOR shall also be liable for
- Page 155 and 156: 107.2 FOR THE SETTLEMENT OF DISPUTE
- Page 157 and 158: platform of such scaffolding or sta
- Page 159 and 160: 2) Suitable facemasks should be sup
- Page 161: 119 Precautions against fire: 119.1
- Page 165 and 166: PROFORMA FOR CONTRACT AGREEMENTLOA
- Page 167: elong to the EMPLOYER and the CONTR