119 Precautions against fire: 119.1 The CONTRACTOR will have to provide Fire Extinguishers, FireBuckets and drums at worksite as recommended byENGINEER-IN-CHARGE. They will have to ensure allprecautionary measures and exercise utmost care in handling theinflammable gas cylinders/ inflammable liquid/ paints etc. asadvised by ENGINEER-IN-CHARGE. Temporary combustiblestructures will not be built near or around the work-site.120 Explosives: 120.1 Explosives shall not be stored or used on the WORK or on theSITE by the CONTRACTOR without the permission of theENGINEER-IN-CHARGE in writing and then only in the mannerand to the extent to which such permission is given. Whenexplosives are required for the WORK they will be stored in aspecial magazine to be provided at the cost of the CONTRACTORin accordance with the Explosives Rules. The CONTRACTORshall obtain the necessary licence for the storage and the use ofexplosives and all operations in which or for which explosives areemployed shall be at sole risk and responsibility of theCONTRACTOR and the CONTRACTOR shall indemnify theEMPLOYER against any loss or damage resulting directly orindirectly therefrom.121 Mines act: 121.1 SAFETY CODE: The CONTRACTOR shall at his own expensearrange for the safety provisions as required by theENGINEER-IN-CHARGE in respect of all labour directly employedfor performance of the WORKS and shall provide all facilities inconnection therewith. In case the CONTRACTOR fails to makearrangements and provides necessary facilities as aforesaid, theENGINEER-IN- CHARGE shall be entitled to do so and recoverthe costs thereof from the CONTRACTOR.121.2 Failure to comply with Safety Code or the provisions relating toreport on accidents and to grant of maternity benefits to femaleworkers shall make the CONTRACTOR liable to pay CompanyLiquidated Damages an amount not exceeding Rs.50/- for eachdefault or materially incorrect statement. The decision of theENGINEER-IN-CHARGE in such matters based on reports fromthe Inspecting Officer or from representatives ofENGINEER-IN-CHARGE shall be final and binding and deductionsfor recovery of such Liquidated Damages may be made from anyamount payable to the CONTRACTOR from all the provisions ofthe Mines Act, 1952 or any statutory modifications or re-enactmentthereof the time being in force and any Rules and Regulationsmade thereunder in respect of all the persons employed by himunder this CONTRACT and shall indemnify the EMPLOYER fromand against any claim under the Mines Act or the rules andregulations framed thereunder by or on behalf of any personsemployed by him or otherwise.122 Preservation of place: 122.1 The CONTRACTOR shall take requisite precautions and use hisbest endeavours to prevent any riotous or unlawful behaviour byor amongst his worker and others employed or the works and forthe preservation of peace and protection of the inhabitants andsecurity of property in the neighborhood of the WORK. In theevent of the EMPLOYER requiring the maintenance of a SpecialPolice Force at or in the vicinity of the site during the tenure ofworks, the expenses thereof shall be borne by the CONTRACTOR

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!