complete in all respects and send the same to the Employer toeffect payment to the CONTRACTOR.88.1.4 <strong>GAIL</strong> shall make all endeavour to make payments of undisputedamount of the bills submitted based on the joint measurementswithin 15 (Fifteen) days from the date of certification by theEngineer-in-Charge.88.1.5 Measurements shall be recorded as per the methods ofmeasurement spelt out in EMPLOYER/CONSULTANTSPECIFICATIONS / CONTRACT DOCUMENT.EMPLOYER/CONSULTANT shall be fully responsible for checkingthe measurements quantitatively and qualitatively as recorded in theMeasurement Books/ Bills.88.1.6 While preparing the final bills overall measurements will not be takenagain. Only volume of work executed since the last measured billalongwith summary of final measurements will be considered for thefinal bill. However, a detailed check shall be made as to missingmeasurements and in case there are any missing items ormeasurements the same shall be recorded.88.1.7 COMPUTERISED BILLING SYSTEM : <strong>GAIL</strong> (<strong>India</strong>) <strong>Limited</strong> hasintroduced Computerised Billing System whereby when the Bills aresubmitted in <strong>GAIL</strong> by a Contractor, a receipt number is generated.The Contractor can know the status of the Bill through <strong>GAIL</strong>’swebsite.88.2 SECURED ADVANCE ON MATERIAL:Unless otherwise provided elsewhere in the tender, no `SecuredAdvance' on security of materials brought to site for execution ofcontracted items(s) shall be paid to the Contractor whatsoever.88.3 DISPUTE IN MODE OF MEASUREMENT:In case of any dispute as to the mode of measurement not coveredby the CONTRACT to be adopted for any item of WORK, mode ofmeasurement as per latest <strong>India</strong>n Standard Specifications shall befollowed.88.4 ROUNDING OF AMOUNTS:In calculating the amount of each item due to the CONTRACTOR inevery certificate prepared for payment, sum of less than 50 paiseshall be omitted and the total amount on each certificate shall berounded off to the nearest rupees, i.e., sum of less than 50 paiseshall be omitted and sums of 50 paise and more upto one rupeeshall be reckoned as one rupee.89 Lumpsum in tender: 89.1 The payment against any Lumpsum item shall be made only oncompletion of that item as per the provision of the CONTRACT aftercertification by ENGINEER-IN-CHARGE.90 Running account paymentsto be regarded as advance:90.1 All running account payments shall be regarded as payment by wayof advance against the final payment only and not as payments forWORK actually done and completed and shall not preclude therequiring of bad, unsound and imperfect or unskilled work to beremoved and taken away and reconstructed or re-erected or beconsidered as an admission of the due performance of the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!