11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMPLOYER's property and will be disposed off to the bestadvantage of the EMPLOYER.70 Articles of value found: 70.1 All gold, silver and other minerals of any description and all preciousstones, coins, treasure relics, antiquities and other similar thingswhich shall be found in, under or upon the SITE, shall be theproperty of the EMPLOYER and the CONTRACTOR shall dulypreserve the same to the satisfaction of theENGINEER-IN-CHARGE and shall from time to time deliver thesame to such person or persons indicated by the EMPLOYER.71 Discrepancies betweeninstructions:72 Action where nospecification is issued:71.1 Should any discrepancy occur between the various instructionsfurnished to the CONTRACTOR, his agent or staff or any doubtarises as to the meaning of any such instructions or should there beany misunderstanding between the CONTRACTOR's staff and theENGINEER-IN- CHARGE's staff, the CONTRACTOR shall refer thematter immediately in writing to the ENGINEER-IN-CHARGE whosedecision thereon shall be final and conclusive and no claim forlosses alleged to have been caused by such discrepancies betweeninstructions, doubts, or misunderstanding shall in any event beadmissible.72.1 In case of any class of WORK for which there is noSPECIFICATION supplied by the EMPLOYER as mentioned in theTender Documents such WORK shall be carried out in accordancewith <strong>India</strong>n Standard Specifications and if the <strong>India</strong>n StandardSpecifications do not cover the same, the WORK should be carriedout as per standard Engineering Practice subject to the approval ofthe ENGINEER-IN-CHARGE.73 Inspection of works: 73.1 The ENGINEER-IN-CHARGE will have full power and authority toinspect the WORK at any time wherever in progress either on theSITE or at the CONTRACTOR's premises/workshops whereversituated, premises/ workshops of any person, firm or corporationwhere WORK in connection with the CONTRACT may be in handor where materials are being or are to be supplied, and theCONTRACTOR shall afford or procure for the ENGINEER-IN-CHARGE every facility and assistance to carry out such inspection.The CONTRACTOR shall, at all time during the usual workinghours and at all other time at which reasonable notice of theintention of the ENGINEER-IN- CHARGE or his representative tovisit the WORK shall have been given to the CONTRACTOR, eitherhimself be present or receive orders and instructions, or have aresponsible agent duly accredited in writing, present for thepurpose. Orders given to the CONTRACTOR's agent shall beconsidered to have the same force as if they had been given to theCONTRACTOR himself. The CONTRACTOR shall give not lessthan seven days notice in writing to the ENGINEER-IN-CHARGEbefore covering up or otherwise placing beyond reach of inspectionand measurement of any work in order that the same may beinspected and measured. In the event of breach of above the sameshall be uncovered at CONTRACTOR's expense for carrying outsuch measurement or inspection.73.2 No material shall be despatched from the CONTRACTOR's storesbefore obtaining the approval in writing of the Engineer-in-Charge.The CONTRACTOR is to provide at all time during the progress of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!