11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

procuring such materials and for the transport thereof. TheEMPLOYER may give necessary recommendation to the respectiveauthority if so desired by the CONTRACTOR but assumes nofurther responsibility of any nature. The EMPLOYER will insist onthe procurement of materials which bear ISI stamp and/or which aresupplied by reputed suppliers.65.2 The CONTRACTOR shall properly store all materials either issuedto him or brought by him to the SITE to prevent damages due torain, wind, direct exposure to sun, etc. as also from theft, pilferage,etc. for proper and speedy execution of his works. TheCONTRACTOR shall maintain sufficient stocks of all materialsrequired by him.65.3 No material shall be despatched from the CONTRACTOR's storesbefore obtaining the approval in writing of theENGINEER-IN-CHARGE.66 Stores supplied by theemployer:66.1 If the SPECIFICATION of the WORK provides for the use of anymaterial of special description to be supplied from theEMPLOYER's stores or it is required that the CONTRACTOR shalluse certain stores to be provided by the ENGINEER-IN-CHARGE,such materials and stores, and price to be charged there for ashereinafter mentioned being so far as practicable for theconvenience of the CONTRACTOR, but not so as in any way tocontrol the meaning or effect of the CONTRACT, theCONTRACTOR shall be bound to purchase and shall be suppliedsuch materials and stores as are from time to time required to beused by him for the purpose of the CONTRACT only. The sumsdue from the CONTRACTOR for the value of materials supplied bythe EMPLOYER will be recovered from the running account bill onthe basis of the actual consumption of materials in the workscovered and for which the running account bill has been prepared.After the completion of the WORK, however, the CONTRACTORhas to account for the full quantity of materials supplied to him asper relevant clauses in this document.66.2 The value of the stores/materials as may be supplied to theCONTRACTOR by the EMPLOYER will be debited to theCONTRACTOR's account at the rates shown in the schedule ofmaterials and if they are not entered in the schedule, they will bedebited at cost price, which for the purpose of the CONTRACT shallinclude the cost of carriage and all other expenses whatsoever suchas normal storage supervision charges which shall have beenincurred in obtaining the same at the EMPLOYER's stores. Allmaterials so supplied to the CONTRACTOR shall remain theabsolute property of the EMPLOYER and shall not be removed onany account from the SITE of the WORK, and shall be at all timesopen for inspection to the ENGINEER-IN-CHARGE. Any suchmaterials remaining unused at the time of the completion ortermination of the CONTRACT shall be returned to theEMPLOYER's stores or at a place as directed by theENGINEER-IN-CHARGE in perfectly good condition atCONTRACTOR's cost.67 Conditions for issue ofmaterials:67.1 i) Materials specified as to be issued by the EMPLOYER willbe supplied to the CONTRACTOR by the EMPLOYERform his stores. It shall be responsibility of theCONTRACTOR to take delivery of the materials andarrange for its loading, transport and unloading at the SITE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!