11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

61 Drawings to be supplied bythe employer61.1 The drawings attached with tender are only for the generalguidance to the CONTRACTOR to enable him to visualize the typeof work contemplated and scope of work involved. TheCONTRACTOR will be deemed to have studied the DRAWINGSand formed an idea about the WORK involved.61.2 Detailed working drawings on the basis of which actual execution ofthe WORK is to proceed, will be furnished from time to time duringthe progress of the work. The CONTRACTOR shall be deemed tohave gone through the DRAWINGS supplied to him thoroughly andcarefully and in conjunction with all other connected drawings andbring to the notice of the ENGINEER-IN-CHARGE discrepancies, ifany, therein before actually carrying out the Work.61.3 Copies of all detailed working drawings relating to the WORK shallbe kept at the CONTRACTOR's office on the site and shall be madeavailable to the ENGINEER-IN- CHARGE at any time during theCONTRACT. The drawings and other documents issued by theEMPLOYER shall be returned to the EMPLOYER on completion ofthe WORK.62 Drawings to be supplied bythe contractor:62.1 The drawings/date which are to be furnished by the CONTRACTORare enumerated in the special conditions of contract, and shall befurnished within the specified time.62.2 Where approval/review of drawings before manufacture/construction/fabrication has been specified, it shall beCONTRACTOR's responsibility to have these drawings prepared asper the directions of ENGINEER-IN-CHARGE and got approvedbefore proceeding with manufacture/construction/fabrication as thecase may be. Any change that may have become necessary inthese drawings during the execution of the work shall have to becarried out by the CONTRACTOR to the satisfaction ofENGINEER-IN-CHARGE at no extra cost. All final drawings shallbear the certification stamp as indicated below duly signed by boththe CONTRACTOR and ENGINEER-IN-CHARGE."Certified true for ___________________________________(Name of Work)AgreementNo.___________________________________________________Signed:_________________(CONTRACTOR)_________________(ENGINEER-IN-CHARGE)62.3 The DRAWINGS submitted by the CONTRACTOR shall bereviewed by the ENGINEER-IN-CHARGE as far as practicablewithin 3 (Three) weeks and shall be modified by theCONTRACTOR, if any modifications and/or corrections are requiredby the ENGINEER-IN-CHARGE. The CONTRACTOR shallincorporate such modifications and/or corrections and submit thefinal drawings for approval. Any delays arising out of failure by theCONTRACTOR to rectify the drawing in good time shall not alterthe Contract Completion Time.62.4 As built drawings showing all corrections, adjustments etc. shall befurnished by the CONTRACTOR in six copies and one transparentfor record purposed to the EMPLOYER.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!