11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

above shall, however, not apply for thefollowing:-Where the value of additions of new itemstogether with the value of alterations,additions/deletions or substitutions does notexceed by or is not less than plus/minus (+_)25%of the VALUE OF CONTRACT. The item rates inthe Schedule of Rates shall hold good for allsuch variations between the above mentionedlimits, irrespective of any increase/decrease ofquantities in the individual items of Schedule ofRates.Where the value of addition of new itemstogether with the value of alterations,additions/deletions or substitutions reduces morethan 25% of the contract value but is within thefollowing limits the tenderer shall be paidcompensation for decrease in the value of work,as follows:S.No. Range of Variation Percentage compensation fordecrease in the value of workin the respective range.a) Beyond (+) 25% upto & No increase and/or decreaseinclusive of (+) 50%shall be applicable for theSchedule of Rates (The ratesquoted for this increase shallbe valid).b) Beyond (-) 25% upto & For reduction beyond 25%inclusive of (-) 50%contractor shall becompensated by an amountequivalent to 10% of thereduction in value of thecontract as awarded. Forexample if the actual contractvalue is 70% of awarded valuethen compensation shall be10% of (75-70) i.e. 0.5% ofawarded contract value.II.For Lumpsum ContractsCONTRACTOR shall, within 7 days of the date of receiptof order to carry out the WORK, inform theENGINEER-IN- CHARGE of the rates which it is hisintention to charge for such class of WORK, supported byanalysis of the rate or rates claimed, and theENGINEER-IN-CHARGE shall determine the rate orrates on the basis of the prevailing market rates, labourcost at schedule of labour rates plus 10% to covercontractor's supervision, overheads and profit and paythe CONTRACTOR accordingly. The opinion of theENGINEER- IN-CHARGE as to current market rates ofmaterials and the quantum of labour involved per unit ofmeasurement will be final and binding on theCONTRACTOR.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!