11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

such sub-letting or Subcontracting had not taken place,and as if such work had been done directly by theCONTRACTOR. The CONTRACTOR shall bear allresponsibility for any act or omission on the part of subcontractorsin regard to work to be performed under theCONTRACT.iv)EMPLOYER MAY TERMINATE SUB-CONTRACTS:If any SUB-CONTRACTOR engaged upon the works atthe site executes any works which in the opinion of theENGINEER-IN-CHARGE is not in accordance with theCONTRACT documents, the EMPLOYER may bywritten notice to the CONTRACTOR request him toterminate such subcontract and the CONTRACTORupon the receipt of such notice shall terminate suchSubcontract and dismiss the SUB-CONTRACTOR(S)and the later shall forthwith leave the works, failing whichthe EMPLOYER shall have the right to remove suchSUB- CONTRACTOR(S) from the site.v) NO REMEDY FOR ACTION TAKEN UNDER THISCLAUSE:No action taken by the EMPLOYER under the clauseshall relieve the CONTRACTOR of any of his liabilitiesunder the CONTRACT or give rise to any right orcompensation, extension of time or otherwise failingwhich the EMPLOYER shall have the right to removesuch SUB-CONTRACTOR(S) from the site.38 Power of entry: 38.1 If the CONTRACTOR shall not commence the WORK in themanner previously described in the CONTRACT documents or ifhe shall at any time in the opinion of theENGINEER-IN-CHARGE.i) fail to carry out the WORK in conformity with theCONTRACT documents, orii)iii)iv)fail to carry out the WORK in accordance withthe Time Schedule, orsubstantially suspend work or the WORK for aperiod of fourteen days without authority fromthe ENGINEER-IN-CHARGE, orfail to carry out and execute the WORK to thesatisfaction of the ENGINEER-IN-CHARGE, orv) fail to supply sufficient or suitable constructionplant, temporary works, labour, materials orthings, orvi)Commit, suffer, or permit any other breach ofany of the provisions of the CONTRACT on hispart to be performed or observed or persist inany of the above mentioned breaches of theCONTRACT for fourteen days, after notice in

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!