11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

herein and CODES referred to. Where the job specificationstipulate requirements in addition to those contained in thestandard codes and specifications, these additional requirementsshall also be satisfied.23 Contractor to obtain hisown Information:23.1 The CONTRACTOR in fixing his rate shall for all purposewhatsoever reason may be, deemed to have himselfindependently obtained all necessary information for the purposeof preparing his tender and his tender as accepted shall bedeemed to have taken into account all contingencies as may arisedue to such information or lack of same. The correctness of thedetails, given in the Tender Document to help the CONTRACTORto make up the tender is not guaranteed.The CONTRACTOR shall be deemed to have examined theCONTRACT DOCUMENTS, to have generally obtained his owninformation in all matters whatsoever that might affect the carryingout of the works at the schedules rates and to have satisfiedhimself to the sufficiency of his tender. Any error in description ofquantity or omission therefrom shall not vitiate the CONTRACT orrelease the CONTRACTOR from executing the work comprised inthe CONTRACT according to DRAWINGS andSPECIFICATIONS at the scheduled rates. He is deemed to haveknown the scope, nature and magnitude of the WORKS and therequirements of materials and labour involved etc., and as to whatall works he has to complete in accordance with the CONTRACTdocuments whatever be the defects, omissions or errors that maybe found in the DOCUMENTS. The CONTRACTOR shall bedeemed to have visited surroundings, to have satisfied himself tothe nature of all existing structures, if any, and also as to thenature and the conditions of the Railways, Roads, Bridges andCulverts, means of transport and communication, whether byland, water or air, and as to possible interruptions thereto and theaccess and egress from the site, to have made enquiries,examined and satisfied himself as to the sites for obtaining sand,stones, bricks and other materials, the sites for disposal of surplusmaterials, the available accommodation as to whatever required,depots and such other buildings as may be necessary forexecuting and completing the works, to have made localindependent enquiries as to the sub-soil, subsoil water andvariations thereof, storms, prevailing winds, climatic conditionsand all other similar matters effecting these works. He is deemedto have acquainted himself as to his liability of payment ofGovernment Taxes, Customs duty and other charges, levies etc.Any neglect or omission or failure on the part of theCONTRACTOR in obtaining necessary and reliable informationupon the foregoing or any other matters affecting the CONTRACTshall not relieve him from any risks or liabilities or the entireresponsibility from completion of the works at the scheduled ratesand times in strict accordance with the CONTRACT.It is, therefore, expected that should the CONTRACTOR have anydoubt as to the meaning of any portion of the CONTRACTDOCUMENT he shall set forth the particulars thereof in writing toEMPLOYER in duplicate, before submission of tender. TheEMPLOYER may provide such clarification as may be necessaryin writing to CONTRACT, such clarifications as provided byEMPLOYER shall form part of CONTRACT DOCUMENTS.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!