11.07.2015 Views

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

GAIL (India) Limited MECON LIMITED

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

who shall thereupon issue to the Contractor instructions thereonand in such event, unless otherwise provided in the Contract, thepriority of the documents forming the Contract shall be as follows :1) The Contract Agreement ;2) The Letter of Acceptance;3) The (Instructions to Bidders)ITB;4) Special Conditions of Contract (SCC);5) General Conditions of Contract (GCC)6) Any other document forming part of the Contract.Works shown in the DRAWING but not mentioned in theSPECIFICATIONS OR described in the SPECIFICATIONS withoutbeing shown in the DRAWINGS shall nevertheless be deemed to beincluded in the same manner as if they had been specifically shownupon the DRAWINGS and described in the SPECIFICATIONS.21.2 Headings and Marginal Notes: All headings and marginal notes tothe clauses of these General Conditions of Contract or to theSPECIFICATIONS or to any other Tender Document are solelyfor the purpose of giving a concise indication and not a summaryof the contents thereof, and they shall never be deemed to be partthereof or be used in the interpretation or construction thereof theCONTRACT.21.3 Singular and Plural: In CONTRACT DOCUMENTS unlessotherwise stated specifically, the singular shall include the pluraland vice versa wherever the context so requires.21.4 Interpretation: Words implying `Persons' shall include relevant`Corporate Companies / Registered Associations/ Body ofIndividuals/ Firm of Partnership' as the case may be.22 Special Conditions ofContract:22.1 Special Conditions of Contract shall be read in conjunction withthe General Conditions of Contract, specification of Work,Drawings and any other documents forming part of thisCONTRACT wherever the context so requires.22.2 Notwithstanding the sub-division of the documents into theseseparate sections and volumes every part of each shall bedeemed to be supplementary to and complementary of everyother part and shall be read with and into the CONTRACT so faras it may be practicable to do so.22.3 Where any portion of the General Condition of Contract isrepugnant to or at variance with any provisions of the SpecialConditions of Contract, unless a different intention appears theprovisions of the Special Conditions of Contract shall be deemedto over-ride the provisions of the General Conditions of Contractand shall to the extent of such repugnancy, or variations, prevail.22.4 Wherever it is mentioned in the specifications that theCONTRACTOR shall perform certain WORK or provide certainfacilities, it is understood that the CONTRACTOR shall do so athis cost and the VALUE OF CONTRACT shall be deemed to haveincluded cost of such performance and provisions, so mentioned.22.5 The materials, design and workmanship shall satisfy the relevantINDIAN STANDARDS, the JOB SPECIFICATIONS contained

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!