11.07.2015 Views

Letter & Annex A - Intellectual Property Office of Singapore

Letter & Annex A - Intellectual Property Office of Singapore

Letter & Annex A - Intellectual Property Office of Singapore

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Annex</strong> A3 Other Proposed Changes: Patent Application Process3.1 In light <strong>of</strong> the changes discussed in Section 2 <strong>of</strong> this paper, the application processwill invariably be modified to cater for the proposed changes. This section discusses 2possible options <strong>of</strong> modifying the application process. Proposed Process Option 1adopts a minimal-change approach where all the filing routes and fast-slow tracks areretained, and timelines undergo adjustments to meet certain requirements <strong>of</strong> a positivegrant system. Proposed Option 2 takes a clean slate approach where on top <strong>of</strong> fittingin the requirements for a positive grant system, existing filing routes, fast-slow tracksand timelines are reviewed. In doing so, a new streamlined framework <strong>of</strong> processingapplications is conceptualized.3.2 Current: Below is the current set <strong>of</strong> timelinesFigure 11: Current TimelinesLocal/MixedRoute,Fast trackForeign Route,Fast trackLocal/MixedRoute,Slow trackForeign Route,Slow TrackIssue PayER grant feeFiling date S S&E/E18313M 21M 39M 42MFurnish prescribed infoFiling datePay grant feeFiling dateFiling dateNational Blk Extensionphase entry S&E/E30M42M18IssueER39M 57M 60MNational Blk Extensionphase entry S&E/E30M39M3Paygrant feeFurnish prescribed infoPay grant fee3.3 Under a positive grant system, an applicant has to obtain a positive examination reportwithin the given time, or extended time where an extension <strong>of</strong> time has been obtained.3.4 Proposed Process Option 1: As discussed earlier, the deadline for filing a request forsearch & examination report or for an examination report will be changed to 20months (paragraph 2.2.9). With the deadline to pay grant fee remaining fixed at 42months (60 months for slow track), the applicant has 1 month from the issuance <strong>of</strong>the examination report to pay grant fee. Process Option 1 proposes only a minoradjustment to deadlines. Below diagram illustrates the proposed Process Option 1.Page 21 <strong>of</strong> 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!