11.07.2015 Views

Brochure Quantum 90-200

Brochure Quantum 90-200

Brochure Quantum 90-200

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

QUANTUM <strong>90</strong>-<strong>200</strong>NATURAL OR PROPANEGAS-FIRED BOILERS®America's HottestBoilerValue!An ISO <strong>90</strong>01-<strong>200</strong>0 Certified Company<strong>90</strong>%AFUE EFFICIENCYAFUE EFFICIENCY


<strong>90</strong>%AFUE EFFICIENCYAFUE EFFICIENCYQUANTUM <strong>90</strong>-<strong>200</strong>NATURAL OR PROPANE GAS-FIRED BOILERSThe New <strong>Quantum</strong> <strong>90</strong>-<strong>200</strong> hot water boilerby Dunkirk delivers all the benefits of the<strong>Quantum</strong> <strong>90</strong>-100 plus added features that willappeal to every homeowner. Like the Q<strong>90</strong>-100,it achieves the optimum combination of highefficiency, innovative technology, and simplicityof design, making it an ideal choice for today'sheating customer.Remarkable <strong>90</strong>% AFUE EfficiencyThe Q<strong>90</strong>-<strong>200</strong> dramatically reduces fuelconsumption and pays for itself withsubstantial annual fuel savings. Its efficiencyis increased beyond <strong>90</strong>% when used in lowtemperature systems, such as radiant systems(see Chart 1 below).Revolutionary Cast Aluminum“Mono Block” Heat ExchangerThis one-piece heat exchanger designeliminates leaks that can occur between sectionsof multi-piece heat exchangers. The greaterthermal conductivity of cast aluminum transfersheat three times faster than conventional castiron, producing enormous gains in heat-upspeed and operating efficiency. Also, thepackaged boiler weighs only 284 pounds foreasier installation.Safe, Economical CPVCand PVC Vent PipeCooled flue gas can be safely vented throughinexpensive readily available and easy to installPVC, after 5' of CPVC provided with the unit.The air intake also utilizes PVC pipe.Simplified ControlsThe <strong>Quantum</strong> <strong>90</strong>-<strong>200</strong>’s control design isengineered to maximize reliability. TheQ<strong>90</strong>-<strong>200</strong> incorporates an integrated boilercontrol with high limit and low watercut-off for operation, safety and diagnostics.Ignition is provided by a hot surface igniterand a single stage gas valve. Dual switchesensure air intake and exhaust vents are clear.All components are easily accessible throughthe removable door.Sealed Combustion, Direct-VentForced Draft SystemUnlike conventional atmospheric boilers,the Q<strong>90</strong>-<strong>200</strong> draws fresh air from outdoorsfor combustion, instead of air from insidethe home. Therefore it does not competewith building occupants for its air supply.With this design the Q<strong>90</strong>-<strong>200</strong> runs quieterand more efficiently than a traditional boiler.Environmentally FriendlyThe Q<strong>90</strong>-<strong>200</strong>'s direct-vent system, premixgas burner and low flame temperaturereduce CO and NOx emissions (acid rain andsmog components) by more than 30% and50% respectively.Ideal for Use withRadiant SystemsWhen used in combination with radiantsystems, which use low supply and return watertemperatures, the Q<strong>90</strong>-<strong>200</strong>'s efficiency isincreased beyond <strong>90</strong>%. Unlike cast iron boilers,the Q<strong>90</strong>-<strong>200</strong> does not require a return bypassor injection pumping system to preheat returnwater prior to entering the heat exchanger.This saves on material and labor costs since thecast aluminum heat exchanger works best atlow water temperatures.Chart 1<strong>Quantum</strong> <strong>90</strong>-<strong>200</strong> Performance10095<strong>90</strong>858075<strong>90</strong> 110 120 130 150 160Efficiency,%Return Water Temperature,°F■ <strong>Quantum</strong> <strong>90</strong>-<strong>200</strong>■ Non-Condensing


®FEATURES & BENEFITSLow Water Cut-offProvides for safe andreliable operation.Easy MaintenanceAll controls are easilyaccessible through theservice door attachedwith slam latches.Optimum CombustionPressure drop throughventing systems changedue to vent pipe lengthand environmental factorssuch as temperature,pressure and windconditions. The ventand gas valve designautomatically adjustsfuel and air mixture tocompensate for thesefactors ensuring idealcombustion.Air Vent PipeCooled flue gases areexhausted through 5 feetof CPVC ( provided – notshown) and transitionsto PVC for safe andeconomical venting.Supply-Side PumpingThe pump is shippedpre-wired with 5 feetof BX wiring ready forfield installation.Forced Draft FanDraws fresh air fromoutside, and mixes withfuel so that combustion andefficiency are optimized.Integrated BoilerControl (IBC)The operating sequenceis checked by a selfdiagnosticcontrol systemto ensure safe operation.Sequencing lights maketroubleshooting easy.Cast Aluminum MonoBlock Heat ExchangerRevolutionary one pieceheat exchanger eliminatessection interface leaks andincorporates wide waterways that reduce pressuredrop and the need for highhead pumps. There is nolonger a need for flowproving switches.CombustibleFloor PlateThe Q<strong>90</strong>-<strong>200</strong> is constructedon an integral, protectiveplatform, which hasadjustable leveling legs.The boiler can be installedon combustible flooring.(No carpets.)PAYBACK<strong>Quantum</strong> <strong>90</strong>-<strong>200</strong> . . . . . . . . . . . . . . . . . <strong>90</strong>% AFUETypical 20-year old Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70% AFUEDifference in AFUE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20%Increased Efficiency over 70% Model (20% ÷ 70%) . . . . . . 28.57%The increased efficiency of the Q<strong>90</strong>-<strong>200</strong> could save you approximately 28% onyour heating bill each year... which means, if you pay $1500 annually in fuel billsto space heat your home, you could save as much as $428 per year!FULL PORT ISOLATION VALVEFull Port Isolation Ball Valves offer a full 1-1/4" passage tomaximize boiler water flows. An exterior handle clearlyindicates the valve position. Theball valves allow the boiler pipingto be switched from threadedpipe to copper piping, withoutthe need for additional fittings,saving the installer valuable time!


GAS-FIRED HOT WATERBOILERSQUANTUM <strong>90</strong>-<strong>200</strong> RATINGSNATURAL & PROPANE GAS FIRED BOILERS.Ratings & Specifications for Q<strong>90</strong> Condensing Boilers.MODELINPUTHEATINGI=B=RFLUESHIPPINGCAPACITY NET RATINGAFUEDIAMETERWEIGHT*(MBH)*%*(MBH)* *(MBH)* (POUNDS)**Q<strong>90</strong>-125 125 112.5 98 <strong>90</strong>% 3" 284**Q<strong>90</strong>-150 150 135.0 117 <strong>90</strong>% 3" 284**Q<strong>90</strong>-175 175 157.5 137 <strong>90</strong>% 3" 284**Q<strong>90</strong>-<strong>200</strong> <strong>200</strong> 180.0 157 <strong>90</strong>% 3" 284*1 MBH = 1,000 Btuh. **Indicates an ENERGY STAR ® product. Btuh = British Thermal Units Per HourThe ratings marked “NET I=B=R RATINGS” indicate the amountof energy that can be applied to heat the radiation or terminal units.The Net I=B=R ratings shown are based on an allowance of 1.15 inaccordance with the factors shown on the I=B=R Code as publishedby the Hydronics Institute.Selection of boiler size should be based upon “NET I=B=R RATING”being equal or greater than the calculated heat loss of the building.Consult manufacturer before selecting a boiler for installationshaving unusual piping and pick-up requirements. Q<strong>90</strong> boilers maybe installed on combustible flooring.■ GAS-FIRED, DIRECT-VENT CONDENSING HOT WATER BOILER■ May be installed on combustible flooring (No Carpets)■ 1" clearance on top, right, base, and back tocombustible construction■ 8" clearance left side for vent/air intake pipe installation■ 24" clearance front and left side, 8" top clearance for servicing■ 0" clearance for Vent and Air Intake Pipes tocombustible construction■■■■■SPECIFICATIONSCONNECTIONS120 Volts AC, 60 Hertz, 1 Phase, Less than 12 AmpsVENT PIPE & AIR INTAKE PIPE• Vent pipe - first 5' is schedule 80 2" CPVC(provided), then schedule 40 2 or 3" PVC• Air intake - schedule 40 3" PVCWater In/Out .................. 1-1/4" NPTGas In .................................. 1/2" NPTCondensate Drain .............. 1/2" PVCThese gas-fired boilers are design certified by C.S.A. in the UnitedStates and Canada for use with natural and propane gas. They areconstructed and hydrostatically tested for a maximum working pressureof 50 psi in accordance with A.S.M.E. (American Society of MechanicalEngineers) Boiler and Pressure Vessel Code Section IV standards forheating boilers. They are capacity rated in accordance with the codeof the Hydronics Institute.STANDARD EQUIPMENT■ Aluminum boiler with painted jacket.■ Hi limit aquastat.■ Transformer.■ 1-1/4" Taco (or Grundfos) circulatorwith isolation ball valves.■ Low water cut off.■ Temperature and pressure gauge.■ 30 psi ASME relief valve.■ Air vent.■ Service switch.Completely installed and wired safety controlsystem with burner consisting of:■ Microprocessor based Integrated Boiler Control.■ Stainless steel premix burner.■ Automatic gas valve.■ Hot surface igniter.■ Casting temperature safety switch.■ Air flow proving switches (2).■ Forced Draft Blower.DUNKIRK QUALITY HEATING. AMERICA’S HOTTEST BOILER VALUE!Dunkirk hydronic boilers lead the industry in value, with premium quality design and componentry. In fact, some of the most respected “brandname” boilers are produced by Dunkirk. These major manufacturers selected Dunkirk hydronic boilers for the same basic reasons you should:superb quality and unmatched value. Just compare our quality to cost ratio, and your boiler choice will become perfectly clear.Specifications and dimensions are subject to change without notice. Made in America-by American Craftsmen.®Since 1928. America’s Hottest Boiler Value.An ISO <strong>90</strong>01-<strong>200</strong>0 Certified Company85 MIDDLE RD DUNKIRK,NY 14048716/366-5500 FAX 716/366-1209e-mail: heating@dunkirk.comweb site: www.dunkirk.comUSA Contractor Assistance:800-325-5479PN 240005047 10/08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!