11.07.2015 Views

Engineering Approval Form for a Network Extension - Watercare

Engineering Approval Form for a Network Extension - Watercare

Engineering Approval Form for a Network Extension - Watercare

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 4: AuthorisationI, the undersigned, hereby declare that the in<strong>for</strong>mation given on this application is true and correct.NameSignature Date / /Section 5: Notes1. Missing in<strong>for</strong>mation may delay processing of this application.2. Full payment of the <strong>Watercare</strong> Services Limited invoice <strong>for</strong> engineering compliance fees is required prior to the pre-construction meeting.PrivacyThe in<strong>for</strong>mation supplied in this application <strong>for</strong>m will be held and used by the staff of <strong>Watercare</strong> Services Limited. The in<strong>for</strong>mation will not bedisclosed by <strong>Watercare</strong> Services Limited unless legally required under the Local Government Official In<strong>for</strong>mation and Meetings Act 1987 or <strong>for</strong>one of the purposes in connection with its collection. The in<strong>for</strong>mation supplied will be used <strong>for</strong>: assessing and processing this application and<strong>for</strong> administration purposes, updating <strong>Watercare</strong> Services Limited’s records to ensure all records are accurate, providing <strong>Watercare</strong> ServicesLimited with statistical in<strong>for</strong>mation to assist policy development. You have the right to request access to and correction of in<strong>for</strong>mation collected.For office use only Application number Lodgement date / /Guidelines <strong>for</strong> completing an <strong>Engineering</strong> <strong>Approval</strong> <strong>Form</strong> <strong>for</strong> a <strong>Network</strong> <strong>Extension</strong>These guidelines are to help you provide the correct in<strong>for</strong>mation <strong>for</strong> completing this <strong>for</strong>m so that we can quickly process your application.Section 1: Applicant DetailsYou must provide full name, company phone/mobile/fax number and email address of person responsible <strong>for</strong> paying the feesassociated with this application. If necessary, use a separate sheet.Section 2: Design Engineer DetailsThe contact details <strong>for</strong> the design engineer responsible <strong>for</strong> supervision of the water and/or wastewater network extension and<strong>for</strong> signing the completion certificate. Include name, details of engineer certification, company, phone/mobile/fax number andemail address.Section 3: Property DetailsLegal Address of Property requiring engineering compliance – Lot, DP and CT Numbers (i.e. the physical, legal address of thedevelopment). Street address details (must comply with the numbering standards administered by Auckland Council) and the legaldescription (Lot, Deposit Plan and Certificate of Title numbers). These can be found on property plans, building consent or legaldocuments.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!