Analysis Techniques For Man-Machine Systems Design
Analysis Techniques For Man-Machine Systems Design Analysis Techniques For Man-Machine Systems Design
NATO UrNCLASSLIFEDAC/243(Panel 8)TR/7Volume 266(3) Activate empty(4) Monitor empty(5) Report empty completion(6) Identify empty unreadiness cause(7) Report empty unreadiness(8) Identify empty failure(9) Report empty failure3. Execute gas turbine requestsa) Start gas turbine(1) Acknowledge start request(2) Check start readiness(3) Activate start(4) Monitor start(5) Report start completion(6) Identify start unreadiness cause(7) Report start unreadiness(8) Identify start failure(9) Report start failureb) Stop gas turbine(1) Acknowledge stop request(2) Check stop readiness(3) Activate stop(4) Monitor stop(5) Report stop completion(6) Identify stop unreadiness cause(7) Report stop unreadiness(8) Identify stop failure(9) Report stop failurec) Change over to gas turbine(1) Acknowledge change over request(2) Check change over readiness(3) Activate change over(4) Monitor change over(5) Report change over completion(6) Identify change over unreadiness cause(7) Report change over unreadiness(8) Identify change over failure(9) Report change over failure4. Execute speed change requestsa) Acknowledge speed change requestb) Check speed change readinessc) Activate speed changed) Monitor speed changee) Report speed change completionf) Identify speed change unreadiness causeg) Report speed change unreadinessh) Identify speed change failurei) Report speed change failureNATO INCT LASSIFIED66
NATO I NCLASSIFIED67 AC/243(Panel 8)TR/7Volume 25. Execute mode change requestsa) Acknowledge mode change requestb) Check mode change readinessc) Activate mode changed) Monitor mode changee) Report mode change completionf) Identify mode change unreadiness causeg) Report mode change unreadinessh) Identify mode change failurei) Report mode change failureB. Monitor PSS1. Monitor diesel and its auxilliary systemsa) Select check pointb) Compare desired/actual statec) Decide subsystem OK2. Monitor gas turbine and its auxilliary systemsa) Select check pointb) Compare desired/actual statec) Decide subsystem OK3. Monitor energy transfer systemsa) Select check pointb) Compare desired/actual statec) Decide subsystem OKC. Handle PSS failures1. Handle failures of diesel and its auxilliary systemsa) Detect failureb) Identify failed systemc) Evaluate failure consequencesd) Decide compensation requirede) Compensate failure(1) Identify alternative actions for compensating(2) Evaluate alternative actions(3) Select appropriate action(4) Execute selected actionf) Find disturbed component(1) Select check point(2) Compare desired/actual state(3) Decide failure found(4) Identify disturbed componentg) Eliminate failure cause(1) Identify alternative actions for eliminating(2) Evaluate alternative actions(3) Select appropriate action(4) Execute selected action2. Handle failures of gas turbine and its auxilliary systemsa) Detect failureNATO TNCLASSIFIED
- Page 258 and 259: o ndesel pre-lubrication (D)compres
- Page 260 and 261: NATO I rNCT-AS S ITfEDAC/243(Panel
- Page 262 and 263: NATO ITNCLASSIFIEDAC/243(Panel 8)TR
- Page 264 and 265: NATO IrNCLASSIFIEDAC/243(Panel 8)TR
- Page 266 and 267: NATO UINCLASSIFIEDAC/243(Panel 8)TR
- Page 268 and 269: NATO) I INCI.ASSllHTlDAC/243(Panel
- Page 270 and 271: o n* (D L4COP1RORDIAm CTiMMINCA1-CO
- Page 272 and 273: (DREFI..11.1 ,CC) WEATHE RDATAft EN
- Page 274 and 275: NATO tTNC>LAM0-~E-DC/4(ae TR7 32Vo
- Page 276 and 277: NATO UNCLASSIF"EDAC/243(Panel 8)TR/
- Page 278 and 279: NATO U NCLASSIFIEDAC/243(Panel 8)TR
- Page 280 and 281: NATO UNCLASSIFIEDAC/243(Panel 8)TR/
- Page 282 and 283: NATO ITNCLASSIFBEDAC/243(Panel 8Vol
- Page 284 and 285: NATO I\NCiASSIFIEDAC/243(Panel 8)TR
- Page 286 and 287: NATO uTNCLASSM EDAC/243(Panel 8)TR/
- Page 288 and 289: NATO I TNCIASSIFLEDAC/243(Panel 8'l
- Page 290 and 291: NATO UNCLASSIFIEDAC/243(Panel 8)TR/
- Page 292 and 293: NATO UNCLASSIFIEDAC/243(Panel 8)TR/
- Page 294 and 295: NATO UNCLASSIF.IDAC/243(Panel 8)TR/
- Page 296 and 297: NATO UNCLASSIOI EDAC/243(Panel 8)TR
- Page 298 and 299: NATONCLASSI-FaEDAC/243(Panel 8)TR/7
- Page 300 and 301: CD-J(D2wCD.4013W- a,'1zzHID IX--lH0
- Page 302 and 303: NATO UNCLASSIFIEDAC/243(Panel 8)TR/
- Page 304 and 305: NATO UNCLASSIFE-DAC/243(Panel 8)TR/
- Page 306 and 307: 0oD0DcWoodimiiothFENV. 2 .Incomingo
- Page 310 and 311: NATO tNCLASSIFFEDAC/243(Panel 8)TR/
- Page 312 and 313: NATO UNCLASSIFIEDANNEX I to2 AC/243
- Page 314 and 315: NATO UNCLASSIFIEDANNEX I to4 AC/243
- Page 316 and 317: NATO UNCLASSIFIEDANNEX I to6 ACP243
- Page 318 and 319: NATO UNCLASSIFIEDAnnex 1I to* 1- AC
- Page 320 and 321: GERMANYnAIR FORCE ARMY NAVYGENERAL
- Page 322 and 323: NORWAYAIR FORCE ARMY NAVY IGENERAL
- Page 324 and 325: INin.Ti) STATESAIR FORCE ARMY NAVY
- Page 326 and 327: ANNEX III toAC/243(Panel-8)TR/7- 2
- Page 328 and 329: ANNEX III toAC/243(Panel-8)TRn - 4
- Page 330 and 331: ANNEX Ill toAC/243(Panei-8)TRf7 - 6
NATO UrNCLASSLIFEDAC/243(Panel 8)TR/7Volume 266(3) Activate empty(4) Monitor empty(5) Report empty completion(6) Identify empty unreadiness cause(7) Report empty unreadiness(8) Identify empty failure(9) Report empty failure3. Execute gas turbine requestsa) Start gas turbine(1) Acknowledge start request(2) Check start readiness(3) Activate start(4) Monitor start(5) Report start completion(6) Identify start unreadiness cause(7) Report start unreadiness(8) Identify start failure(9) Report start failureb) Stop gas turbine(1) Acknowledge stop request(2) Check stop readiness(3) Activate stop(4) Monitor stop(5) Report stop completion(6) Identify stop unreadiness cause(7) Report stop unreadiness(8) Identify stop failure(9) Report stop failurec) Change over to gas turbine(1) Acknowledge change over request(2) Check change over readiness(3) Activate change over(4) Monitor change over(5) Report change over completion(6) Identify change over unreadiness cause(7) Report change over unreadiness(8) Identify change over failure(9) Report change over failure4. Execute speed change requestsa) Acknowledge speed change requestb) Check speed change readinessc) Activate speed changed) Monitor speed changee) Report speed change completionf) Identify speed change unreadiness causeg) Report speed change unreadinessh) Identify speed change failurei) Report speed change failureNATO INCT LASSIFIED66