Alvarez, Nancy
Alvarez, Nancy Alvarez, Nancy
SamplingSites• 10 watersheds• 47 % ofwatershed area• ~50%streamflow tolake
• Samples collected– Monthly– Storm events– Snow-melt runoff• All phases ofhydrograph sampledSampling Design• EWI depth integrated• Number of sampleseach water yearvaried
- Page 1 and 2: The Lake Tahoe Interagency Monitori
- Page 3 and 4: • History• LTIMP Objectives•
- Page 5: LTIMP Objectives• Primary purpose
- Page 9 and 10: Mean Daily Discharge (cfs)Incline C
- Page 11 and 12: Mean Daily Discharge (cfs)Incline C
- Page 13 and 14: Laboratories• UC Davis Labs inDav
- Page 15 and 16: UCD Load Calculations• Log of ins
- Page 17 and 18: Sediment Annual LoadSUSPENDED SEDIM
- Page 19 and 20: Nitrogen Annual Load160000ANNUAL TO
- Page 21 and 22: Sediment Annual Flow-Weighted Conce
- Page 23 and 24: Nitrogen Annual Flow-WeightedConcen
- Page 25 and 26: Suspended Sediment Annual FWC103367
- Page 27 and 28: Total Phosphorus Annual FWC10336790
- Page 29 and 30: SRP Annual FWC10336790 TROUT CREEK1
- Page 31 and 32: Total Nitrogen Annual FWC1.00103367
- Page 33 and 34: Nitrate+Nitrite Annual FWC0.2001033
- Page 35 and 36: Future Work• Continue to work on
- Page 37 and 38: “New” Goal Objectives• Goal:
- Page 39 and 40: “New” Goals and Objectives• D
- Page 41 and 42: WY2012StreamNetwork• 11 gages•
SamplingSites• 10 watersheds• 47 % ofwatershed area• ~50%streamflow tolake