Alvarez, Nancy
Alvarez, Nancy Alvarez, Nancy
Mean Daily Discharge (cfs)Incline Creek, WY 20054012 routine samples302010010/1/2004 12/31/2004 4/1/2005 7/1/2005 9/30/2005Date
Mean Daily Discharge (cfs)Incline Creek, WY 20054017 event samples302010010/1/2004 12/31/2004 4/1/2005 7/1/2005 9/30/2005Date
- Page 1 and 2: The Lake Tahoe Interagency Monitori
- Page 3 and 4: • History• LTIMP Objectives•
- Page 5 and 6: LTIMP Objectives• Primary purpose
- Page 7 and 8: • Samples collected- Monthly- Sto
- Page 9: Mean Daily Discharge (cfs)Incline C
- Page 13 and 14: Laboratories• UC Davis Labs inDav
- Page 15 and 16: UCD Load Calculations• Log of ins
- Page 17 and 18: Sediment Annual LoadSUSPENDED SEDIM
- Page 19 and 20: Nitrogen Annual Load160000ANNUAL TO
- Page 21 and 22: Sediment Annual Flow-Weighted Conce
- Page 23 and 24: Nitrogen Annual Flow-WeightedConcen
- Page 25 and 26: Suspended Sediment Annual FWC103367
- Page 27 and 28: Total Phosphorus Annual FWC10336790
- Page 29 and 30: SRP Annual FWC10336790 TROUT CREEK1
- Page 31 and 32: Total Nitrogen Annual FWC1.00103367
- Page 33 and 34: Nitrate+Nitrite Annual FWC0.2001033
- Page 35 and 36: Future Work• Continue to work on
- Page 37 and 38: “New” Goal Objectives• Goal:
- Page 39 and 40: “New” Goals and Objectives• D
- Page 41 and 42: WY2012StreamNetwork• 11 gages•
Mean Daily Discharge (cfs)Incline Creek, WY 20054012 routine samples302010010/1/2004 12/31/2004 4/1/2005 7/1/2005 9/30/2005Date