11.07.2015 Views

addendum 1 to request for proposal step 2 - Port Canaveral

addendum 1 to request for proposal step 2 - Port Canaveral

addendum 1 to request for proposal step 2 - Port Canaveral

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ADDENDUM 1TO REQUEST FOR PROPOSALSTEP 2- TECHNICAL AND PRICE PROPOSAL FORCRUISE TERMINAL NO. 6 MOBILE GANGWAYPUR-RFP-11-9/CN 11-003FORCANAVERAL PORT AUTHORITYSeptember 29, 2011This <strong>addendum</strong> is issued as part of the Bidding Documents <strong>for</strong> the above described project. The changesincorporated in this <strong>addendum</strong> shall be considered as a part of the documents and shall supersede, amend, add<strong>to</strong>, clarify, or subtract from those conditions shown in the original documents. The bidder shall take care <strong>to</strong>coordinate modifications herein with all trades and disciplines related <strong>to</strong> the work. The Bidder shallacknowledge receipt of this <strong>addendum</strong> on the Bid Form by <strong>addendum</strong> number and date. Failure <strong>to</strong> do so maysubject Bidder <strong>to</strong> disqualification.SENT VIA U-SEND-IT – 2 PAGES TOTAL________________________________________(NAME OF YOUR COMPANY)NOTE:PLEASE SIGN_______________________________AND RETURN THIS FIRST SHEET ONLY VIAE-MAIL OR FAX <strong>to</strong> KAREN PAPPAS. KPAPPAS@PORTCANAVERAL.COM or (321) 783-3522 FaxTHIS VERIFIES THAT YOU HAVE RECEIVED THE ADDENDUM.GENERAL1. THE PROPOSAL SUBMISSION DATE REMAINS WEDNESDAY,OCTOBER 5, 2011at 2:00 PM (EDT).SPECIFICATIONS1. There are no specification changes at this time.DRAWINGS1. There are no drawing changes at this time.QUESTIONS AND RESPONSES:1. QUESTION 001: The Bid Bond, according <strong>to</strong> the specifications, should be in anamount equal <strong>to</strong> 5% of the "<strong>to</strong>tal <strong>proposal</strong> amount". Can you please in<strong>for</strong>m if this "<strong>to</strong>tal<strong>proposal</strong> price" includes or excludes the Additive Alternate Bid Item 1?RESPONSE: Bid Bond amount shall be based on the "Sum of Base Bid Items 1through 3" as identified on the Proposal Bid Form. "Additive Alternate Bid Item 1" doesnot need <strong>to</strong> be included in the Bid Bond amount.PUR-RFP-11-9/CN 11-003 ADDENDUM 1/PAGE 1 OF 2 STEP 2


STEP 2 - CT 6 MOBILE GANGWAYPUR-RFP-11-9/CN 11-0032. QUESTION 002: Are the Proposers <strong>to</strong> submit a base bid <strong>for</strong> each option identified inthe plans?RESPONSE: No. Each proposer can select an option which best suits them <strong>to</strong> submittheir base bid amount. A Proposer can submit an alternate base bid design, differentfrom the options presented as long as sufficient details allow <strong>for</strong> a complete review bythe Design Engineer and the <strong>Canaveral</strong> <strong>Port</strong> Authority and meet the requirementsidentified <strong>for</strong> building and ship connections, slope, life safety, s<strong>to</strong>res access.END OF ADDENDUM #1Issued via USendItbyauthority of the <strong>Canaveral</strong> <strong>Port</strong> AuthorityPUR-RFP-11-9/CN 11-003 ADDENDUM 1/PAGE 2 OF 2 STEP 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!