A Hands-on-Workshop30 Aug to 1 Sept, 2012<strong>Auroville</strong> (near Pondicherry)htpp://agp.aurovilleconsulting.com‘Human Habitats today have become centers of energy consumption.By conserving energy with appropriate building design,reducing energy by efficient energy management and producingenergy with decentralized systems that allows feeding surplusenergy into the grid, we can create a shift towards energy positivehabitats. Essential to this movement is the fact that humanshave to change their life styles to consume less energy.‘


EMERGING ENERGY POLICIES INTAMIL NADUK.Venugopal, MemberTamil Nadu Electricity RegulatoryCommission


CAPACITY ADDITION ( Ongoing)SL NO NAME OF PROJECT CAPACITY ALLOCATION FORTAMIL NADU1 Mettur Stage III 1 x 600 MW 600 MW2 North Chennai StageII3 Vallur ( JV-TANGEDCO andNTPC)4 Tuticorin ( JV –TANGEDCO andNLC)2 x 600 MW 1200 MW3 x 500 MW 1040 MW2 x 500 MW 388 MW


CAPACITY ADDITION. (Ongoing)..ContdSL NO NAME OF PROJECT CAPACITY ALLOCATION1 NLC Expansion 2 x 250 MW 230 MW2 NTPC Simhadri UnitII1 x 500 MW 95 MW3 NPCIL Kudankulam 2 x 1000 925 MW4 NPCIL-MAPS(PFBR) 1 x 500 167 MW


CAPACITY ADDITION. (New projects)SL NO NAME OF PROJECT CAPACITY ALLOCATION1 Krishnapatnam UMPP 4000 MW 800 MW2 Ennore TPS –Replacement1 x 660 MW 660 MW3 Ennore TPS - Expansion 1 x 660 MW 660 MW4 Tuticorin TPS – Stage IV 1 x 800 MW 800 MW5 Uppur TPS 2 x 800 MW 1600 MW6 NCTPS Stage III 1 x 800 MW 800 MW7 Ennore SEZ TPS 2 x 800 MW 1600 MW8 Udangudi TPS Stage I 2 x 800 MW 1600 MW9 Udangudi TPS Stage II 1 x 800 MW 800 MW10 Cheyyur UMPP 4000 MW 1600 MW


GENERATION FROM WIND & TARIFF• Order No 6 of 2012 dated 31-07-2012 of Wind :‣ Installed capacity as on 31 st March 2012 : 6971 MW‣ Applications pending for installation : 10,000 MW‣ Contribution by Wind during wind season : 30% of peak demand‣ Tariff for wind mills commissioned from 1 st August 2012 upto 31 stJuly 2014 : Rs 3.51 / unit‣ Tariff for wind mills commissioned prior to 15 th May 2006 : Rs2.75 / unit‣ Tariff for wind mills commissioned between 15 th May 2006 to 18 thSeptember 2008 : Rs 2.90 / unit‣ Tariff for wind mills commissioned between 19 th Sept 2008 to 31 stJuly 2012 : Rs 3.39 / unit


STATUS OF PROPOSED 400 KV BACK BONENETWORK FROM KAYATHAR TOOTTIYAMBAKKAMSL NO NAME OF WORK COST OFSCHEME(Rs Crores)LOI DATEPROBABLE DATE OFCOMPLETION1 400 KV DC Line for 157 km fromKaraikudi 400 KV SS to Kayathar2 400 KV DC line for 163 km fromKaraikudi 400 KV SS to Pugalur 400KV SS3 400 KV DC Line for 148 km fromPugalur PGCIL 400 KV SS toPandiyankuppam Village4 400 KV DC Line for 114 km fromPandiankuppam to VeeramanurVillage5 400 DC Line for 123 km fromVeeramanur Village toOttiyambakkam 400 KV SS327.00 9 th April 2012 18 months from thedate of taking over thesite387.81 13 TH August201218 months from thedate of taking over thesite480.50 12 th April 2012 18 months from thedate of taking over thesite360.86 11 th June 2012 18 months from thedate of taking over thesite443.04 20 TH July 2012 18 months from thedate of taking over thesite


TARIFF FOR BAGASSE BASED CO-GENPLANTS• Tariff Order No. 7 of 2012 dated 31 - 07 – 2012 for Bagasse based Co-generationplants• Fixed costs : Ranges from Rs 2.11 / unit in the 1st year to Rs 1.79 in the 20th year• The Commission has considered a reduction of 10% in the fixed costs forapportioning the FCC between co-gen and sugar mills for use of steam in sugar mills.Consequently, the fixed costs have been reduced to Rs 1.90 / unit in the 1st year toRs 1.61 / unit in the 20th year.• Variable Costs: The Commission has fixed the variable cost for the financial year2012-13 as Rs.1.86 per unit., The price for FY 2013-14 will be decided as and whenthe Government announces the sugar price for the next year. The same would thenbe adopted by the Commission.• Therefore, total cost for bagasse based plants for FY 2012-13 : Rs 3.76 / unit.


TARIFF FOR BIOMASS , BIOGAS PLANTS• Tariff Order No. 8 of 2012 dated 31 - 07 – 2012 forBiomass plantsFixed costs : Ranges from Rs 1.66 / unit in the 1st year to Rs 1.58in the 20th yearVariable Costs: The Commission has fixed the variable cost for thefinancial year 2012-13 as Rs.3.036 per unit and Rs 3.188 / unit forFY 2013-14Therefore, the total cost of biomass based plants for FY 2012-13will be Rs 4.694 / unit.• Tariff for biogas plants using poultry and sago waste isto be notified by the Commission


SOLAR TARIFF – PHOTOVOLTAIC• Commission has notified tariff for Solar PV Projectscovered by Jawaharlal Nehru National Solar Mission videOrder No 1 of 2010 dated 27 th May 2010.• Cost plus Single part levellised tariff for 25 years : Rs18.45 / unit• Net applicable tariff ( on adjusting for accelerateddepreciation benefit, if availed) : Rs 14.34 / unit


SOLAR TARIFF – THERMAL• Commission has notified tariff for Solar Thermal Projects coveredby Jawaharlal Nehru National Solar Mission vide Order No 2 of 2010dated 8 th July 2010• Cost plus Single part levellised tariff for 25 years : Rs 15.51 / unit• Net applicable tariff ( on adjusting for accelerated depreciationbenefit, if availed) : Rs 12.16 / unit• The existing capacity of solar projects in Tamil Nadu : 16 MW• As and when solar policy is released, Commission will take furtheraction for making enabling provisions