26.11.2012 Views

4 - City of Oxford

4 - City of Oxford

4 - City of Oxford

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

S‘i<br />

97769-arcoms-avost<br />

MINUTE BOOK No. 24. CITY OF OXFORD<br />

9. Clean up grounds, adjacent to exterior toilets previous location.<br />

10. Repair or replace existing service entrance sign to rear <strong>of</strong> existing<br />

hospital. This was damaged during construction.<br />

#9.<br />

11. Paint patched plaster between convector and cased opening in Office<br />

12. Repaint window frames "F-9", located on grid line "B".<br />

13. Repair all plaster cracks.<br />

14. Replace defective tackboard in Kitchen #107.<br />

15. Remove paint from U. L. Labels on doors and frames.<br />

16. Replace broken marble sill in Room #141.<br />

17. Recompact clay base gravel course to rear <strong>of</strong> hospital wherever<br />

s<strong>of</strong>t spots are visible and near curbs.<br />

18. Install weatherstripping on exterior doors.<br />

19. Repair door at floor check just south <strong>of</strong> Nurses Station #116.<br />

20. Remove concrete droppings from boiler room floor.<br />

21. Secure metal plate containing filers beneath range hood in Kitchen<br />

#107.<br />

22. Fill pitch pocket on ro<strong>of</strong>.<br />

23. Complete bituminous paving as specified.<br />

24. Complete site work, seeding, etc., as specified.<br />

MECHANICAL:<br />

1. Cold water runouts to hose bibs are not insulated nor supported.<br />

Support and insulate per specifications.<br />

2. Insulation is missing on chilled water lines in several places.<br />

3. Provide sheet metal saddles for pipe hangers.<br />

4. Provide copper hangers for oxygen line under building.<br />

5. Make a good tight vapor seal between armaflex and vapor jacket on<br />

chilled water line.<br />

6. Label all controls in boiler room, such as fan relays.<br />

7. All control tubing shall be copper.<br />

8. Submit data on pipe covering.<br />

9. Control air compressor and dryer shall have an automatic float trap.<br />

10. Air supply diffuser No. 12 is not correct.<br />

11. Repair leak at AHU heating coil.<br />

12. Replace defective bearing on hot water pump.<br />

13. Provide 1" filters for room fan coil units.<br />

14. Provide additional pipe support for gas line to water heater.<br />

15. Check controls on AHU. The unit trips from freezestat each night.<br />

16. Boiler paint has been damaged. Repaint.<br />

17. Verify that room unit control is on-<strong>of</strong>f and not modulating.<br />

18. Complete installation <strong>of</strong> barber lavatory.<br />

19. Paint oxygen shut-<strong>of</strong>f valve. Paint has been scarred.<br />

20. Complete all items on inspection report dated November 14, 1968.<br />

21. Turn in report <strong>of</strong> air distribution balance and all tests.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!