26.11.2012 Views

4 - City of Oxford

4 - City of Oxford

4 - City of Oxford

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

11<br />

97768.— www-wrom<br />

MINUTE BOOK No. 24, CITY OF OXFORD<br />

and operation, the anticipated net revenues, amortization costs and<br />

surpluses. The feasibility study will be based upon an acquisition price<br />

<strong>of</strong> 120 percent <strong>of</strong> the original cost <strong>of</strong> the properties when devoted to<br />

public service, less accrued depreciation in accordance with information<br />

furnished by the GAS COMPANY. No appraisal <strong>of</strong> the physical property nor<br />

determination <strong>of</strong> earning value will be made.<br />

The ENGINEER shall furnish five copies <strong>of</strong> the completed report to each <strong>of</strong><br />

the INDIVIDUAL MUNICIPALITIES. Any additional copies requested by any<br />

INDIVIDUAL MUNICIPALITY will be furnished by the ENGINEER at the actual<br />

cost <strong>of</strong> reproduction.<br />

PART TWO - Engineering Date for Revenue Bond Issues:<br />

Based upon the recommendations set forth in the preliminary engineering<br />

report, as described in PART ONE, and upon the determinations made subse-<br />

quent thereto by the SIGNATORY MUNICIPALITIES as a group, or by INDIVIDUAL<br />

MUNICIPALITY or by several INDIVIDUAL MUNICIPALITIES acting in concert,<br />

the ENGINEER will provide additional services required for the acquisition<br />

<strong>of</strong> all or any part <strong>of</strong> the properties <strong>of</strong> the GAS COMPANY and the sale <strong>of</strong><br />

gas revenue bonds for funding such purchase.<br />

At the specific request and direction <strong>of</strong> the SIGNATORY MUNICIPALITIES, or<br />

any INDIVIDUAL MUNICIPALITY or any group <strong>of</strong> INDIVIDUAL MUNICIPALITIES<br />

acting in concert, the ENGINEER will make additional engineering and<br />

feasibility studies and shall prepare a report or reports,.as requested<br />

and specifically directed, which will cover all <strong>of</strong> the information con-<br />

tained in the Preliminary Engineering and Feasibility Report as enumerared<br />

in PART ONE OF SERVICES, along with such additional detailed engineering<br />

and economic data as may be necessary for court proceedings, for hearings<br />

before regulatory agencies and for the sale <strong>of</strong> gas revenue bonds.<br />

the ENGINEER will provide five copies each <strong>of</strong> the reports to those INDIVI-<br />

DUAL MUNICIPALITIES affected by that report. Additional copies <strong>of</strong> the<br />

113<br />

report will be furnished by the ENGINEER at the actual cost <strong>of</strong> reproduction<br />

The ENGINEER will be available for advice and consultation during the pre-<br />

paration <strong>of</strong> the report or reports, and upon the completion <strong>of</strong> the report<br />

or reports will meet with the SIGNATORY MUNICIPALITIES <strong>of</strong> INDIVIDUAL<br />

MUNICIPALITIES to review and explain the contents <strong>of</strong> the report or reports.<br />

PART THREE - Additional Engineering Services:<br />

The ENGINEER will be available for additional services and consultations<br />

to the SIGNATORY MUNICIPALITIES or INDIVIDUAL MUNICIPALITIES and at the<br />

specific request and direction <strong>of</strong> the SIGNATORY MUNICIPALITIES, or

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!