Use of Tekla Structures for complex CIS projects - BA-Nettverket
Use of Tekla Structures for complex CIS projects - BA-Nettverket
Use of Tekla Structures for complex CIS projects - BA-Nettverket
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Use</strong> <strong>of</strong> <strong>Tekla</strong> <strong>Structures</strong> <strong>for</strong><strong>complex</strong> <strong>CIS</strong> <strong>projects</strong>@ TS userdays 2009 in Oslo, NorwayThomas Grönholm / Head <strong>of</strong> Sales – Nordic Area andthe Baltic’s
Background / the business scope (FIN)In Finland alone there is some 14 000 bridges, approx. 50% are >3m long250-300 new bridges are being built every year – value some 100M€~1000 bridges are in poor condition – annual investment some 50M€Design portion <strong>of</strong> total cost are 4-6% ( max 10%)2D is still the standard - there is need <strong>for</strong> automation and 3D solutions- However very few 3D s<strong>of</strong>tware can do the jobThe present process is fragmented and document based – however BIMtoolshave strongly entered the market and it’s been generally accepted inthe construction sector that BIM is the only way <strong>for</strong>ward.3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures23/16/20102
TS bridgeOngoing or completed <strong>projects</strong>3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures13
WSP - Railway bridge, Oulu3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures14
Railway bridge, Oulu3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures15
Railway bridge, Oulu3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures16
Railway bridge, Oulu3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures17
WSP - Highway bridges3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures18
CRUSELL BRIDGE3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures19
3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures20
3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures21
3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures22
Concrete wall structures3/16/2010http://www.wspgroup.fi/fi/Sektorit/Projektit/Liikenne-ja-infrastruktuuri/Crusellin-silta-Helsinki-/Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures23
LAUKKO PEDESTRIAN BRIDGE, TAMPEREWINNER OF BRIDGE DESIGN COMPETITION3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures24
WSPLAUKKO- LaukkoPEDESTRIANPedestrianBRIDGE,bridge TAMPERETAMPEREWINNER OF BRIDGE DESIGN COMPETITION3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures25
PilotsKojola / Destia Consulting3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures26
PilotsJänhiälän siltaTypical bridge (CC)3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures27
PilotsHänninlänsalmi / Siltanylund3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures28
PilotsIirislahti / WSP3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures29
PilotsRamboll Sweden3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures30
PilotsMulticonsult Norway3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures31
TS bridgePile slabs3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures32
Pile slabs
GA drawings (Mittapiirustus)
Rein<strong>for</strong>cement drawings(Raudoituspiirustus)
TS bridgeImproved Quality Assurance3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures36
Infra and structural
Surveying
Laserscanning
TS bridgeRenovation <strong>projects</strong>3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures40
Pyhäjoki Bridge - WSPTimber truss structure, museum bridgeWeak condition –needed quick repairing3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures41
Laser scanned point cloud with RGB color from images taken byscanner3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures42
Pyhäjoki Museum BridgePoint cloud analysing and modelling <strong>of</strong> existing structures3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures43
TS bridgeEnable Automation (near future scenarios)3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures44
AutomationRein<strong>for</strong>cement CNC
AutomationExcavation dataNovatron VISION 3D
AutomationPiling & deepstabilizing
TS bridgeHighlights3/16/2010Thomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures48
Highlights so far• Data transfer between infra and structural dicipline enabled– surfaces, main geometry points• Coordinate trans<strong>for</strong>mation – done <strong>for</strong> direct import - export• New advanced modelling <strong>for</strong> <strong>complex</strong> geometry (.NET)• New advanced rein<strong>for</strong>cement tools (.NET)• Basic settings and training material in place• Contractors can benefit a lot from the above– Rebar lists (RL),m2,m3, surveyor info, quality assurance• Supporting the whole process• Enable new businesses (TIS)BrIMThomas Grönholm / TS <strong>for</strong> <strong>complex</strong> <strong>CIS</strong> structures3/16/201049