DEEP SEA ELECTRONICS PLC - Home Mega Global Solution

DEEP SEA ELECTRONICS PLC - Home Mega Global Solution DEEP SEA ELECTRONICS PLC - Home Mega Global Solution

megaglobalsolution.com
from megaglobalsolution.com More from this publisher
11.07.2015 Views

DSE 5xxx Configuration Software ManualScheduler Settings DescriptionSheduler SettingsEnable ExerciseSchedulerScheduled Runs areOn-loadFunctionEnable Exercise Scheduler - = The module will not respond to the scheduled run commands fromthe exercise scheduler. = The module will respond to the scheduled run commands from theexercise scheduler.Scheduled Runs are on-load - = In the event of a scheduled run command the module will start thegenerator and run off-load for the duration of the scheduled run. E.g. Toexercise a standby generator without interrupting the load. Should aremote start/mains failure occur during the off-load run, the genset willtake load as normal. = In the event of a schedule run command the module will start thegenerator and the generator will take load for the duration of thescheduled run. E.g. For a timed peak lopping application.Exercise Scheduler Exercise Scheduler -Day - Day of the week that the event will occur.Start - The Time of Day that the scheduled run command will be issued.Run Time - The duration that the scheduled run command will be presentfor, therefore the amount of time the generator will run for.CAUTION!:- Should the generator take load during a scheduled run, eitherbecause the run was configured to be ‘on load’, or a remote start/mains failureoccurred during the run; if the ‘Auto restore inhibit’ input is active the genset wil notstop at the end of the scheduled run, until the ‘Auto restore inhibit’ input becomes inactive.58DSE 5xxx Configuration software ISSUE 2 02/07/04 AM

DSE 5xxx Configuration Software Manual3.10 COMMUNICATIONS SETTINGSThis menu alows configuration of the module’s communication setings. This section is onlyapplicable where the module is fitted with the optional RS232 or RS485 interface.NOTE:- Please see section entitled ‘Communications options connections’ forfurther details on using the 52xx/53xx controller in conjunction with RS485 or RS232(modem) applications.DSE5xxx Configuration software ISSUE 2 02/07/04 AM 59

DSE 5xxx Configuration Software ManualScheduler Settings DescriptionSheduler SettingsEnable ExerciseSchedulerScheduled Runs areOn-loadFunctionEnable Exercise Scheduler - = The module will not respond to the scheduled run commands fromthe exercise scheduler. = The module will respond to the scheduled run commands from theexercise scheduler.Scheduled Runs are on-load - = In the event of a scheduled run command the module will start thegenerator and run off-load for the duration of the scheduled run. E.g. Toexercise a standby generator without interrupting the load. Should aremote start/mains failure occur during the off-load run, the genset willtake load as normal. = In the event of a schedule run command the module will start thegenerator and the generator will take load for the duration of thescheduled run. E.g. For a timed peak lopping application.Exercise Scheduler Exercise Scheduler -Day - Day of the week that the event will occur.Start - The Time of Day that the scheduled run command will be issued.Run Time - The duration that the scheduled run command will be presentfor, therefore the amount of time the generator will run for.CAUTION!:- Should the generator take load during a scheduled run, eitherbecause the run was configured to be ‘on load’, or a remote start/mains failureoccurred during the run; if the ‘Auto restore inhibit’ input is active the genset wil notstop at the end of the scheduled run, until the ‘Auto restore inhibit’ input becomes inactive.58DSE 5xxx Configuration software ISSUE 2 02/07/04 AM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!