REQUEST FOR QUOTATION - GAIL (India)
REQUEST FOR QUOTATION - GAIL (India) REQUEST FOR QUOTATION - GAIL (India)
General Conditions of ContractThe undersigned has full power to execute this Indemnity Bond on behalf of theCONTRACTOR under the Power of Attorney dated______.(SIGNED BY COMPETENT AUTHORITY)Place:Dated:Official seal of the CONTRACTOR76
General Conditions of ContractPROFORMA FOR CONTRACT AGREEMENTLOA No. GAIL / Dated -----------Contract Agreement for the work of --------------- of GAIL (INDIA) Ltd. made on --------between (Name and Address)------------- , hereinafter called the “CONTRACTOR”(which term shall unless excluded by or repugnant to the subject or context includeits successors and permitted assignees) of the one part and GAIL (INDIA) LIMITEDhereinafter called the “EMPLOYER” (which term shall, unless excluded by orrepugnant to the subject or context include its successors and assignees) of theother part.WHEREASA. The EMPLOYER being desirous of having provided and executed certain workmentioned, enumerated or referred to in the Tender Documents including LetterInviting Tender, General Tender Notice, General Conditions of Contract, SpecialConditions of Contract, Specifications, Drawings, Plans, Time Schedule ofcompletion of jobs, Schedule of Rates, Agreed Variations, other documents hascalled for Tender.B. The CONTRACTOR has inspected the SITE and surroundings of WORKspecified in the Tender Documents and has satisfied himself by carefulexamination before submitting his tender as to the nature of the surface, strata,soil, sub-soil and ground, the form and nature of site and local conditions, thequantities, nature and magnitude of the work, the availability of labour andmaterials necessary for the execution of work, the means of access to SITE, thesupply of power and water thereto and the accommodation he may require andhas made local and independent enquiries and obtained complete information asto the matters and thing referred to, or implied in the tender documents or havingany connection therewith and has considered the nature and extent of allprobable and possible situations, delays, hindrances or interferences to or withthe execution and completion of the work to be carried out under theCONTRACT, and has examined and considered all other matters, conditionsand things and probable and possible contingencies, and generally all mattersincidental thereto and ancillary thereof affecting the execution andcompletion of the WORK and which might have influenced him in making histender.C. The Tender Documents including the Notice Letter Inviting Tender, GeneralConditions of Contract, Special Conditions of Contract, Schedule of Rates,General Obligations, SPECIFICATIONS, DRAWINGS, PLANS, Time Schedulefor completion of Jobs, Letter of Acceptance of Tender and any statement ofagreed variations with its enclosures copies of which are hereto annexed formpart of this CONTRACT though separately set out herein and are included inthe expression “CONTRACT” wherever herein used.77
- Page 39 and 40: General Conditions of Contractkind
- Page 41 and 42: General Conditions of ContractEMPLO
- Page 43 and 44: General Conditions of Contractwhich
- Page 45 and 46: General Conditions of Contractb) An
- Page 47 and 48: General Conditions of Contract56 Co
- Page 49 and 50: General Conditions of Contractfrom
- Page 51 and 52: General Conditions of Contract62 Dr
- Page 53 and 54: General Conditions of Contract65.2
- Page 55 and 56: General Conditions of Contractviii)
- Page 57 and 58: General Conditions of Contractwhich
- Page 59 and 60: General Conditions of Contractii) I
- Page 61 and 62: General Conditions of Contractfor w
- Page 63 and 64: General Conditions of Contractconne
- Page 65 and 66: General Conditions of Contractprote
- Page 67 and 68: General Conditions of Contract88.4
- Page 69 and 70: General Conditions of Contract94 Co
- Page 71 and 72: General Conditions of Contractnow o
- Page 73 and 74: General Conditions of Contractproce
- Page 75 and 76: General Conditions of Contractd) Th
- Page 77 and 78: General Conditions of ContractFund
- Page 79 and 80: General Conditions of Contract106 H
- Page 81 and 82: General Conditions of Contractof th
- Page 83 and 84: General Conditions of ContractLadde
- Page 85 and 86: General Conditions of Contractcondi
- Page 87 and 88: General Conditions of Contractthe M
- Page 89: General Conditions of Contractthere
- Page 93: General Conditions of ContractThe C
General Conditions of ContractPRO<strong>FOR</strong>MA <strong>FOR</strong> CONTRACT AGREEMENTLOA No. <strong>GAIL</strong> / Dated -----------Contract Agreement for the work of --------------- of <strong>GAIL</strong> (INDIA) Ltd. made on --------between (Name and Address)------------- , hereinafter called the “CONTRACTOR”(which term shall unless excluded by or repugnant to the subject or context includeits successors and permitted assignees) of the one part and <strong>GAIL</strong> (INDIA) LIMITEDhereinafter called the “EMPLOYER” (which term shall, unless excluded by orrepugnant to the subject or context include its successors and assignees) of theother part.WHEREASA. The EMPLOYER being desirous of having provided and executed certain workmentioned, enumerated or referred to in the Tender Documents including LetterInviting Tender, General Tender Notice, General Conditions of Contract, SpecialConditions of Contract, Specifications, Drawings, Plans, Time Schedule ofcompletion of jobs, Schedule of Rates, Agreed Variations, other documents hascalled for Tender.B. The CONTRACTOR has inspected the SITE and surroundings of WORKspecified in the Tender Documents and has satisfied himself by carefulexamination before submitting his tender as to the nature of the surface, strata,soil, sub-soil and ground, the form and nature of site and local conditions, thequantities, nature and magnitude of the work, the availability of labour andmaterials necessary for the execution of work, the means of access to SITE, thesupply of power and water thereto and the accommodation he may require andhas made local and independent enquiries and obtained complete information asto the matters and thing referred to, or implied in the tender documents or havingany connection therewith and has considered the nature and extent of allprobable and possible situations, delays, hindrances or interferences to or withthe execution and completion of the work to be carried out under theCONTRACT, and has examined and considered all other matters, conditionsand things and probable and possible contingencies, and generally all mattersincidental thereto and ancillary thereof affecting the execution andcompletion of the WORK and which might have influenced him in making histender.C. The Tender Documents including the Notice Letter Inviting Tender, GeneralConditions of Contract, Special Conditions of Contract, Schedule of Rates,General Obligations, SPECIFICATIONS, DRAWINGS, PLANS, Time Schedulefor completion of Jobs, Letter of Acceptance of Tender and any statement ofagreed variations with its enclosures copies of which are hereto annexed formpart of this CONTRACT though separately set out herein and are included inthe expression “CONTRACT” wherever herein used.77