General Conditions of Contract94 Completion certificate: 94.1 APPLICATION <strong>FOR</strong> COMPLETION CERTIFICATE:When the CONTRACTOR fulfils his obligation under Clause81.1 he shall be eligible to apply for COMPLETIONCERTIFICATE.The ENGINEER-IN-CHARGE shall normally issue to theCONTRACTOR the COMPLETION CERTIFICATE within onemonth after receiving any application therefore from theCONTRACTOR after verifying from the completion documentsand satisfying himself that the WORK has been completed inaccordance with and as set out in the construction anderection drawings, and the CONTRACT DOCUMENTS.The CONTRACTOR, after obtaining the COMPLETIONCERTIFICATE, is eligible to present the final bill for the WORKexecuted by him under the terms of CONTRACT.94.2 COMPLETION CERTIFICATE:Within one month of the completion of the WORK in allrespects, the CONTRACTOR shall be furnished with acertificate by the ENGINEER-IN-CHARGE of such completion,but no certificate shall be given nor shall the WORK bedeemed to have been executed until all scaffolding, surplusmaterials and rubbish is cleared off the SITE completely noruntil the WORK shall have been measured by theENGINEER-IN-CHARGE whose measurement shall bebinding and conclusive. The WORKS will not be consideredas complete and taken over by the EMPLOYER, until all thetemporary works, labour and staff colonies are cleared to thesatisfaction of the ENGINEER-IN-CHARGE.If the CONTRACTOR fails to comply with the requirements ofthis clause on or before the date fixed for the completion of theWORK, the ENGINEER-IN-CHARGE may at the expense ofthe CONTRACTOR remove such scaffolding, surplusmaterials and rubbish and dispose off the same as he thinks fitand clean off such dirt as aforesaid, and the CONTRACTORshall forthwith pay the amount of all expenses so incurred andshall have no claim in respect of any such scaffolding orsurplus materials as aforesaid except for any sum actuallyrealised by the sale thereof.94.3 COMPLETION CERTIFICATE DOCUMENTS:For the purpose of Clause 94.0 the following documents willbe deemed to form the completion documents:i) The technical documents according to which the WORKwas carried out.ii) Six (6) sets of construction drawings showing therein themodification and correction made during the course ofexecution and signed by the ENGINEER-IN-CHARGE.iii) COMPLETION CERTIFICATE for `embedded' and`covered' up work.iv) Certificates of final levels as set out for various works.55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!