General Conditions of Contract88 Procedure for measurementand billing of work inprogress:88.1 BILLING PROCEDURE:Following procedures shall be adopted for billing of worksexecuted by the CONTRACTOR.88.1.1 All measurements shall be recorded in sextuplicate onstandard measurement sheets supplied by EMPLOYER andsubmitted to EMPLOYER/CONSULTANT for scrutiny andpassing.88.1.2 EMPLOYER/CONSULTANT shall scrutinise and check themeasurements recorded on the sheets and shall certifycorrectness of the same on the measurement sheets.88.1.3 ENGINEER-IN-CHARGE shall pass the bills after carrying outthe comprehensive checks in accordance with the terms andconditions of the CONTRACTS, within 7 days of submission ofthe bills, complete in all respects and send the same to theEmployer to effect payment to the CONTRACTOR.88.1.4 <strong>GAIL</strong> shall make all endeavour to make payments of undisputedamount of the bills submitted based on the jointmeasurements within 15 (Fifteen) days from the date ofcertification by the Engineer-in-Charge.88.1.5 Measurements shall be recorded as per the methods ofmeasurement spelt out in EMPLOYER/CONSULTANTSPECIFICATIONS / CONTRACT DOCUMENT.EMPLOYER/CONSULTANT shall be fully responsible forchecking the measurements quantitatively and qualitatively asrecorded in the Measurement Books/ Bills.88.1.6 While preparing the final bills overall measurements will not betaken again. Only volume of work executed since the lastmeasured bill alongwith summary of final measurements willbe considered for the final bill. However, a detailed checkshall be made as to missing measurements and in case thereare any missing items or measurements the same shall berecorded.88.1.7 COMPUTERISED BILLING SYSTEM : <strong>GAIL</strong> (<strong>India</strong>) Limitedhas introduced Computerised Billing System whereby whenthe Bills are submitted in <strong>GAIL</strong> by a Contractor, a receiptnumber is generated. The Contractor can know the status ofthe Bill through <strong>GAIL</strong>’s website.88.2 SECURED ADVANCE ON MATERIAL:Unless otherwise provided elsewhere in the tender, no`Secured Advance' on security of materials brought to site forexecution of contracted items(s) shall be paid to the Contractorwhatsoever.88.3 DISPUTE IN MODE OF MEASUREMENT:In case of any dispute as to the mode of measurement notcovered by the CONTRACT to be adopted for any item ofWORK, mode of measurement as per latest <strong>India</strong>n StandardSpecifications shall be followed.52

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!