11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

General Conditions of Contractcondition, the CONTRACTOR shall, in terms of thelicences or permits and/or criminal breach of trust, be liableto compensate the EMPLOYER at double rate or anyhigher rate, in the event of those materials at that timehaving higher rate or not being available in the market, thenany other rate to be determined by theENGINEER-IN-CHARGE and his decision shall be finaland conclusive.69 Materials obtained fromdismantling:69.1 If the CONTRACTOR in the course of execution of theWORK is called upon to dismantle any part for reasonsother than those stipulated in Clauses 74 and 77hereunder, the materials obtained in the WORK ofdismantling etc., will be considered as the EMPLOYER'sproperty and will be disposed off to the best advantage ofthe EMPLOYER.70 Articles of value found: 70.1 All gold, silver and other minerals of any description and allprecious stones, coins, treasure relics, antiquities and othersimilar things which shall be found in, under or upon theSITE, shall be the property of the EMPLOYER and theCONTRACTOR shall duly preserve the same to thesatisfaction of the ENGINEER-IN-CHARGE and shall fromtime to time deliver the same to such person or personsindicated by the EMPLOYER.71 Discrepancies betweeninstructions:72 Action where no specificationis issued:71.1 Should any discrepancy occur between the variousinstructions furnished to the CONTRACTOR, his agent orstaff or any doubt arises as to the meaning of any suchinstructions or should there be any misunderstandingbetween the CONTRACTOR's staff and theENGINEER-IN- CHARGE's staff, the CONTRACTOR shallrefer the matter immediately in writing to theENGINEER-IN-CHARGE whose decision thereon shall befinal and conclusive and no claim for losses alleged to havebeen caused by such discrepancies between instructions,doubts, or misunderstanding shall in any event beadmissible.72.1 In case of any class of WORK for which there is noSPECIFICATION supplied by the EMPLOYER asmentioned in the Tender Documents such WORK shall becarried out in accordance with <strong>India</strong>n StandardSpecifications and if the <strong>India</strong>n Standard Specifications donot cover the same, the WORK should be carried out asper standard Engineering Practice subject to the approvalof the ENGINEER-IN-CHARGE.73 Inspection of works: 73.1 The ENGINEER-IN-CHARGE will have full power andauthority to inspect the WORK at any time wherever inprogress either on the SITE or at the CONTRACTOR'spremises/workshops wherever situated, premises/workshops of any person, firm or corporation where WORKin connection with the CONTRACT may be in hand orwhere materials are being or are to be supplied, and theCONTRACTOR shall afford or procure for theENGINEER-IN- CHARGE every facility and assistance tocarry out such inspection. The CONTRACTOR shall, at alltime during the usual working hours and at all other time at42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!