11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

General Conditions of Contractviii) None of the materials supplied to the CONTRACTORwill be utilised by the CONTRACTOR formanufacturing item which can be obtained assupplied from standard manufacturer in finishedform.ix) The CONTRACTOR shall, if desired by theENGINEER- IN-CHARGE, be required to execute anIndemnity Bond in the prescribed form for safecustody and accounting of all materials issued by theEMPLOYER.x) The CONTRACTOR shall furnish to theENGINEER-IN- CHARGE sufficiently in advance astatement showing his requirement of the quantitiesof the materials to be supplied by the EMPLOYERand the time when the same will be required by himfor the works, so as to enable theENGINEER-IN-CHARGE to make necessaryarrangements for procurement and supply of thematerial.xi)xii)Account of the materials issued by the EMPLOYERshall be maintained by CONTRACTOR indicating thedaily receipt, consumption and balance in hand. Thisaccount shall be maintained in a manner prescribedby the ENGINEER-IN-CHARGE along with allconnected papers viz. requisitions, issues, etc., andshall be always available for inspection in theCONTRACTOR's office at SITE.The CONTRACTOR should see that only therequired quantities of materials are got issued. TheCONTRACTOR shall not be entitled to cartage andincidental charges for returning the surplus materials,if any, to the stores wherefrom they were issued or tothe place as directed by theENGINEER-IN-CHARGE.xiii) Materials/Equipment(s) supplied by EMPLOYER shallnot be utilised for any purpose(s) than issued for.68 Material procured withassistance ofemployer/return of surplus:68.1 Notwithstanding anything contained to the contrary in anyor all the clauses of this CONTRACT where any materialsfor the execution of the CONTRACT are procured with theassistance of the EMPLOYER either by issue fromEMPLOYER's stock or purchases made under order orpermits or licences issued by Government, theCONTRACTOR shall hold the said materials as trustee forthe EMPLOYER and use such materials economically andsolely for the purpose of the CONTRACT and not disposethem off without the permission of the EMPLOYER andreturn, if required by the ENGINEER-IN-CHARGE, shalldetermine having due regard to the condition of thematerials. The price allowed to the CONTRACTOR,however, shall not exceed the amount charged to himexcluding the storage charges, if any. The decision of theENGINEER-IN-CHARGE shall be final and conclusive insuch matters. In the event of breach of the aforesaid41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!