11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

General Conditions of Contract62 Drawings to be supplied bythe contractor:62.1 The drawings/date which are to be furnished by theCONTRACTOR are enumerated in the special conditionsof contract, and shall be furnished within the specified time.62.2 Where approval/review of drawings before manufacture/construction/fabrication has been specified, it shall beCONTRACTOR's responsibility to have these drawingsprepared as per the directions of ENGINEER-IN-CHARGEand got approved before proceeding withmanufacture/construction/fabrication as the case may be.Any change that may have become necessary in thesedrawings during the execution of the work shall have to becarried out by the CONTRACTOR to the satisfaction ofENGINEER-IN-CHARGE at no extra cost. All finaldrawings shall bear the certification stamp as indicatedbelow duly signed by both the CONTRACTOR andENGINEER-IN-CHARGE."Certified true for _________________________________(Name of Work)AgreementNo.___________________________________________Signed:__________________________________(CONTRACTOR)(ENGINEER-IN-CHARGE)62.3 The DRAWINGS submitted by the CONTRACTOR shall bereviewed by the ENGINEER-IN-CHARGE as far aspracticable within 3 (Three) weeks and shall be modified bythe CONTRACTOR, if any modifications and/or correctionsare required by the ENGINEER-IN-CHARGE. TheCONTRACTOR shall incorporate such modifications and/orcorrections and submit the final drawings for approval. Anydelays arising out of failure by the CONTRACTOR to rectifythe drawing in good time shall not alter the ContractCompletion Time.62.4 As built drawings showing all corrections, adjustments etc.shall be furnished by the CONTRACTOR in six copies andone transparent for record purposed to the EMPLOYER.63 Setting out works: 63.1 The ENGINEER-IN-CHARGE shall furnish theCONTRACTOR with only the four corners of the Works siteand a level bench mark and the CONTRACTOR shall setout the Works and shall provide an efficient staff for thepurpose and shall be solely responsible for the accuracy ofsuch setting out.63.2 The CONTRACTOR shall provide, fix and be responsiblefor the maintenance of all stakes, templates, level marks,profiles and other similar things and shall take all necessaryprecautions to prevent their removal or disturbance andshall be responsible for the consequence of such removalor disturbance should the same take place and for their37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!