11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

General Conditions of ContractCONTRACTOR shall not subject these works for use other thanthose intended under this CONTRACT.51 Release of information: 51.1 The CONTRACTOR shall not communicate or use in advertising,publicity, sales releases or in any other medium, photographs, orother reproduction of the Work under this CONTRACT ordescription of the site dimensions, quantity , quality or otherinformation, concerning the Work unless prior written permissionhas been obtained from the EMPLOYER.52 Brand names: 52.1 The specific reference in the SPECIFICATIONS and documentsto any material by trade name, make or catalogue number shallbe construed as establishing standard or quality andperformance and not as limited competition. However,TENDERER may offer other similar equipments provided itmeets the specified standard design and performancerequirements.53 Completion of contract: 53.1 Unless otherwise terminated under the provisions of any otherrelevant clause, this CONTRACT shall be deemed to have beencompleted at the expiration of the PERIOD OF LIABILITY asprovided for under the CONTRACT.54 Spares: 54.1 The CONTRACTOR shall furnish to the EMPLOYER all sparesrequired for COMMISSIONING of the plants, recommendatoryand/or mandatory spares, which are required essential by themanufacturer/supplier. The same shall be delivered at SITE,3(Three) months before COMMISSIONING.Also the CONTRACTOR should furnish the manufacturingdrawings for fast wearing spares.54.2 The CONTRACTOR guarantees the EMPLOYER that before themanufacturers of the equipments, plants and machineries go outof production of spare parts for the equipment furnished anderected by him, he shall give at least twelve (12) months'advance notice to the EMPLOYER, so that the latter may orderhis requirement of spares in one lot, if he so desires.SECTION-VPER<strong>FOR</strong>MANCE OF WORK55 Execution of work: 55.1 All the Works shall be executed in strict conformity with theprovisions of the CONTRACT Documents and with suchexplanatory detailed drawings, specification and instructionsas may be furnished from time to time to theCONTRACTOR by the ENGINEER-IN-CHARGE whethermentioned in the CONTRACT or not. The CONTRACTORshall be responsible for ensuring that works throughout areexecuted in the most substantial, proper and workmanlikemanner with the quality of material and workmanship in strictaccordance with the SPECIFICATIONS and to the entiresatisfaction of the ENGINEER-IN-CHARGE. TheCONTRACTOR shall provide all necessary materialsequipment labour etc. for execution and maintenance ofWORK till completion unless otherwise mentioned in theCONTRACT.32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!