11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

General Conditions of ContractEMPLOYER in his absolute discretion may think proper toemploy and for the purpose aforesaid to use or authorise the useof any materials, temporary work, CONSTRUCTION PLANT, andstock as aforesaid, without making payment or allowance to theCONTRACTOR for the said materials other than such as may becertified in writing by the ENGINEER-IN-CHARGE to bereasonable, and without making any payment or allowance to theCONTRACTOR for the use of the temporary said works,construction plant and stock or being liable for any loss ordamage thereto, and if the EMPLOYER shall by reason of histaking possession of the WORK or of the WORK beingcompleted by other CONTRACTOR (due account being taken ofany such extra work or works which may or be omitted) then theamount of such excess as certified by theENGINEER-IN- CHARGE shall be deducted from any moneywhich may be due for work done by the CONTRACTOR underthe CONTRACT and not paid for. Any deficiency shall forthwithbe made good and paid to the EMPLOYER by theCONTRACTOR and the EMPLOYER shall have power to sell insuch manner and for such price as he may think fit all or any ofthe construction plant, materials etc. constructed by or belongingto and to recoup and retain the said deficiency or any part thereofout of proceeds of the sale.39 Contractor'sresponsibility with themechanical, electrical,intercommunicationsystem, airconditioningcontractors and otheragencies:39.1 Without repugnance of any other condition, it shall be theresponsibility of the CONTRACTOR executing the work of civilconstruction, to work in close cooperation and coordinate theWORK with the Mechanical, Electrical, Air-conditioning andIntercommunication Contractor's and other agencies or theirauthorised representatives, in providing the necessary grooves,recesses, cuts and opening etc., in wall, slabs beams andcolumns etc. and making good the same to the desired finish asper specification, for the placement of electrical,intercommunication cables, conduits, air-conditioning inlets andoutlets grills and other equipments etc. where required. For theabove said requirements in the false ceiling and other partitions,the CONTRACTOR before starting-up the work shall inconsultation with the Electrical, Mechanical, Intercommunication,Air-conditioning contractor and other agencies prepare andput-up a joint scheme, showing the necessary openings,grooves, recesses, cuts, the methods of fixing required for theWORK of the aforesaid, and the finishes therein, to theENGINEER-IN-CHARGE and get the approval. TheCONTRACTOR before finally submitting the scheme to theENGINEER-IN-CHARGE, shall have the written agreement ofthe other agencies. The ENGINEER- IN-CHARGE, beforecommunicating his approval to the scheme, with any requiredmodification, shall get the final agreement of all the agencies,which shall be binding. No claim shall be entertained on accountof the above.The CONTRACTOR shall confirm in all respects with provision ofany statutory regulations, ordinances or byelaws of any local orduly constituted authorities or public bodies which may beapplicable from time to time to the WORK or any temporaryworks. The CONTRACTOR shall keep the EMPLOYERindemnified against all penalties and liabilities of every kind,arising out of non- adherance to such stains, ordinances, laws,rules, regulations, etc.27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!