General Conditions of Contractsuch notice shall terminate such Subcontract and dismissthe SUB-CONTRACTOR(S) and the later shall forthwithleave the works, failing which the EMPLOYER shall have theright to remove such SUB- CONTRACTOR(S) from the site.v) NO REMEDY <strong>FOR</strong> ACTION TAKEN UNDER THISCLAUSE:No action taken by the EMPLOYER under the clause shallrelieve the CONTRACTOR of any of his liabilities under theCONTRACT or give rise to any right or compensation,extension of time or otherwise failing which the EMPLOYERshall have the right to remove such SUB-CONTRACTOR(S)from the site.38 Power of entry: 38.1 If the CONTRACTOR shall not commence the WORK in themanner previously described in the CONTRACT documents or ifhe shall at any time in the opinion of the ENGINEER-IN-CHARGE.i) fail to carry out the WORK in conformity with theCONTRACT documents, orii)fail to carry out the WORK in accordance with the TimeSchedule, oriii) substantially suspend work or the WORK for a period offourteen days without authority from theENGINEER-IN-CHARGE, oriv) fail to carry out and execute the WORK to the satisfaction ofthe ENGINEER-IN-CHARGE, orv) fail to supply sufficient or suitable construction plant,temporary works, labour, materials or things, orvi) Commit, suffer, or permit any other breach of any of theprovisions of the CONTRACT on his part to be performed orobserved or persist in any of the above mentioned breachesof the CONTRACT for fourteen days, after notice in writingshall have been given to the CONTRACTOR by theENGINEER-IN-CHARGE requiring such breach to beremedied, orvii) if the CONTRACTOR shall abandon the WORK , orviii) If the CONTRACTOR during the continuance of theCONTRACT shall become bankrupt, make any arrangementor composition with his creditors, or permit any execution tobe levied or go into liquidation whether compulsory orvoluntary not being merely a voluntary liquidation for thepurpose of amalgamation or reconstructionthen in any such case, the EMPLOYER shall have the power toenter upon the WORK and take possession thereof and of thematerials, temporary WORK, construction plant, and stockthereon, and to revoke the CONTRACTOR's licence to use thesame, and to complete the WORK by his agents, otherCONTRACTORS or workmen or to relate the same upon anyterms and to such other person, firm or corporation as the26
General Conditions of ContractEMPLOYER in his absolute discretion may think proper toemploy and for the purpose aforesaid to use or authorise the useof any materials, temporary work, CONSTRUCTION PLANT, andstock as aforesaid, without making payment or allowance to theCONTRACTOR for the said materials other than such as may becertified in writing by the ENGINEER-IN-CHARGE to bereasonable, and without making any payment or allowance to theCONTRACTOR for the use of the temporary said works,construction plant and stock or being liable for any loss ordamage thereto, and if the EMPLOYER shall by reason of histaking possession of the WORK or of the WORK beingcompleted by other CONTRACTOR (due account being taken ofany such extra work or works which may or be omitted) then theamount of such excess as certified by theENGINEER-IN- CHARGE shall be deducted from any moneywhich may be due for work done by the CONTRACTOR underthe CONTRACT and not paid for. Any deficiency shall forthwithbe made good and paid to the EMPLOYER by theCONTRACTOR and the EMPLOYER shall have power to sell insuch manner and for such price as he may think fit all or any ofthe construction plant, materials etc. constructed by or belongingto and to recoup and retain the said deficiency or any part thereofout of proceeds of the sale.39 Contractor'sresponsibility with themechanical, electrical,intercommunicationsystem, airconditioningcontractors and otheragencies:39.1 Without repugnance of any other condition, it shall be theresponsibility of the CONTRACTOR executing the work of civilconstruction, to work in close cooperation and coordinate theWORK with the Mechanical, Electrical, Air-conditioning andIntercommunication Contractor's and other agencies or theirauthorised representatives, in providing the necessary grooves,recesses, cuts and opening etc., in wall, slabs beams andcolumns etc. and making good the same to the desired finish asper specification, for the placement of electrical,intercommunication cables, conduits, air-conditioning inlets andoutlets grills and other equipments etc. where required. For theabove said requirements in the false ceiling and other partitions,the CONTRACTOR before starting-up the work shall inconsultation with the Electrical, Mechanical, Intercommunication,Air-conditioning contractor and other agencies prepare andput-up a joint scheme, showing the necessary openings,grooves, recesses, cuts, the methods of fixing required for theWORK of the aforesaid, and the finishes therein, to theENGINEER-IN-CHARGE and get the approval. TheCONTRACTOR before finally submitting the scheme to theENGINEER-IN-CHARGE, shall have the written agreement ofthe other agencies. The ENGINEER- IN-CHARGE, beforecommunicating his approval to the scheme, with any requiredmodification, shall get the final agreement of all the agencies,which shall be binding. No claim shall be entertained on accountof the above.The CONTRACTOR shall confirm in all respects with provision ofany statutory regulations, ordinances or byelaws of any local orduly constituted authorities or public bodies which may beapplicable from time to time to the WORK or any temporaryworks. The CONTRACTOR shall keep the EMPLOYERindemnified against all penalties and liabilities of every kind,arising out of non- adherance to such stains, ordinances, laws,rules, regulations, etc.27