11.07.2015 Views

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

General Conditions of Contractkind in the course of their work or during their employment, whichare connected directly or indirectly with the CONTRACT.36.4 If and when required by the EMPLOYER and CONTRACTOR'spersonnel entering upon the EMPLOYER's premises shall beproperly identified by badges of a type acceptable to theEMPLOYER which must be worn at all times on EMPLOYER'spremises. CONTRACTOR may be required to obtain daily entrypasses for his staff/employees from EMPLOYER to work withinoperating areas. These being safety requirements, norelaxations on this account shall be given to CONTRACTOR.37 Sub-letting of works: 37.1 No part of the CONTRACT nor any share or interest therein shallin any manner or degree be transferred, assigned or sublet bythe CONTRACTOR directly or indirectly to any person, firm orcorporation whatsoever without the consent in writing, of theENGINEER/EMPLOYER except as provided for in thesucceeding sub-clause.i) SUB-CONTRACTS <strong>FOR</strong> TEMPORARY WORKS ETC.:The EMPLOYER may give written consent to Sub- contractfor the execution of any part of the WORK at the site, beingentered in to by CONTRACTOR provided each individualSub- contract is submitted to the ENGINEER-IN-CHARGEbefore being entered into and is approved by him.ii)LIST OF SUB-CONTRACTORS TO BE SUPPLIED:At the commencement of every month the CONTRACTORshall furnish to the ENGINEER-IN- CHARGE list of allSUB-CONTRACTORS or other persons or firms engaged bythe CONTRACTOR and working at the SITE during theprevious month with particulars of the general nature of theSubcontract or works done by them.iii) CONTRACTOR'S LIABILITY NOT LIMITED BYSUB- CONTRACTORS:Notwithstanding any sub-letting with such approval asaforesaid and notwithstanding that the ENGINEER-IN-CHARGE shall have received copies of any Subcontracts,the contractor shall be and shall remain solelyresponsible for the quality, proper and expeditious executionof the Contract in all respects as if such sub-letting orSubcontracting had not taken place, and as if such workhad been done directly by the CONTRACTOR. TheCONTRACTOR shall bear all responsibility for any act oromission on the part of sub-contractors in regard to work tobe performed under the CONTRACT.iv) EMPLOYER MAY TERMINATE SUB-CONTRACTS:If any SUB-CONTRACTOR engaged upon the works at thesite executes any works which in the opinion of theENGINEER-IN-CHARGE is not in accordance with theCONTRACT documents, the EMPLOYER may by writtennotice to the CONTRACTOR request him to terminate suchsubcontract and the CONTRACTOR upon the receipt of25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!